際際滷

際際滷Share a Scribd company logo
M3 presentation show
INTRODUCTION
We thank you for the opportunity of introducing our
company to yourselves
It is our intention of introducing ourselves as a medium sized
Civil, Earthworks and Building Construction Company undertaking
work in various parts of Southern Africa.
M3 Construction Projects (Pty) Ltd. was formed with the majority
shareholders being previously disadvantaged individuals (PDIs).
The main driving force behind M3 Construction Projects (Pty) Ltd
is TD Construction CC, which has been operating since 1980 as a
partnership between Mr. T.E. Darlow and Mr. G. Talbot and as a
Close Corporation since February 1985 with Mr. T.E. Darlow and
Mr. G. Talbot as members.
Managements philosophy is to develop lasting customer
relationships and repeat business. This is achieved by ensuring
that we consistently meet agreed requirements with regard to
specification, safety, time and cost.
PROJECTS
Conveyor Lines Retaining Walls Concrete Base Surface Beds
Plant Civils
Process Water
Dam
Underground
Civils Bridges
Road Intersections
Concrete
Structures Concrete Pumping Box Front Civils
PROJECTS IN PROGRESS
CLIENT CONSULTANT CONTRACTUAL VALUE
Barberton Mines Pan Africa Gold Basil Read Matomo R 30 000 000.00
Grootegelek Mine Stef Stocks R 3 200 000.00
New Era Mogwase/ Germiston/ Durban R 15 500 000.00
Sanral Roadspan R 14 500 000.00
Northam Platinum Mine Northam Platinum R 2 000 000.00
Northam Platinum Mine BBE Projects R 3 000 000.00
Springs Ekurhuleni Sub Station Quadpro R 9 000 000.00
Bathopele Mine Anglo Platinum Actom R 4 500 000.00
Two Rivers Platinum Basil Read Matomo R 22 000 000.00
Tweefontein Mine Xstrata Coal DRA R 55 000 000.00
DRA Congo  Kibali Mine DRA R 300 000 000.00
Germiston Acid Water Group Five Civils R 25 000 000.00
Lion Projects Phase 2 Xstrata Alloys R 27 000 000.00
Ermelo Powertech Quadpro R 600 000.00
Brakfontein - Underground
Mondi
Nkomati
Bombella
Groenfontein
Pedestrian
Portal
Underground
Makgophe Bridge
Zanspruit
Vangatfontein
Group 5- Siyavaya
Example of the Project Process:
2 Rivers Platinum Mine
Bulk Earthworks
Restricted Earthworks
Concrete
Erectional Steel
Concrete and Steel Progress
Nearing Completion
Bulk Earthworks
Restricted Earthworks
Concrete
Concrete
TAR
Erectional Steel
Concrete and Steel Progress
Nearing Completion
Platinum
Waste
Recycled
Extract
Chrome
M3 presentation show

More Related Content

M3 presentation show

  • 2. INTRODUCTION We thank you for the opportunity of introducing our company to yourselves It is our intention of introducing ourselves as a medium sized Civil, Earthworks and Building Construction Company undertaking work in various parts of Southern Africa. M3 Construction Projects (Pty) Ltd. was formed with the majority shareholders being previously disadvantaged individuals (PDIs). The main driving force behind M3 Construction Projects (Pty) Ltd is TD Construction CC, which has been operating since 1980 as a partnership between Mr. T.E. Darlow and Mr. G. Talbot and as a Close Corporation since February 1985 with Mr. T.E. Darlow and Mr. G. Talbot as members. Managements philosophy is to develop lasting customer relationships and repeat business. This is achieved by ensuring that we consistently meet agreed requirements with regard to specification, safety, time and cost.
  • 3. PROJECTS Conveyor Lines Retaining Walls Concrete Base Surface Beds Plant Civils Process Water Dam Underground Civils Bridges Road Intersections Concrete Structures Concrete Pumping Box Front Civils
  • 4. PROJECTS IN PROGRESS CLIENT CONSULTANT CONTRACTUAL VALUE Barberton Mines Pan Africa Gold Basil Read Matomo R 30 000 000.00 Grootegelek Mine Stef Stocks R 3 200 000.00 New Era Mogwase/ Germiston/ Durban R 15 500 000.00 Sanral Roadspan R 14 500 000.00 Northam Platinum Mine Northam Platinum R 2 000 000.00 Northam Platinum Mine BBE Projects R 3 000 000.00 Springs Ekurhuleni Sub Station Quadpro R 9 000 000.00 Bathopele Mine Anglo Platinum Actom R 4 500 000.00 Two Rivers Platinum Basil Read Matomo R 22 000 000.00 Tweefontein Mine Xstrata Coal DRA R 55 000 000.00 DRA Congo Kibali Mine DRA R 300 000 000.00 Germiston Acid Water Group Five Civils R 25 000 000.00 Lion Projects Phase 2 Xstrata Alloys R 27 000 000.00 Ermelo Powertech Quadpro R 600 000.00
  • 14. Example of the Project Process: 2 Rivers Platinum Mine Bulk Earthworks Restricted Earthworks Concrete Erectional Steel Concrete and Steel Progress Nearing Completion
  • 20. Concrete and Steel Progress