CURRICULUM VITAE
Mina Mourad Mourcos
minamorcus@yahoo.com
Phone no.: 0128 8800380
Phone no.: 0128 3091471
PERSONAL DATA
Mina Mourad Mourcos:Name
Egyptian:Nationality
1/3/1984:Date of Birth
EDUCATION
 Diploma in Professional Project Management (PRMG), American University in Cairo.
(2009).
 Bachelor of Civil Engineering, Banha university 2008, project grade in Irrigation
(Movement of water & organic material under Hydraulic Structure) (Very Good).
 Finishing the preparation Course of Planning and Schedule professional (PSP).
 Finishing the preparation course of Project Management Professional (PMP).
WORK SUMMARY
ORASCOM CONSTRUCTION SUBSIDIARIES
October 2009  Till now.
Job Title: Senior Planning Engineer
o Great Cairo Metro ( Line 3 , Phase 4B )
 Oct 2015  Present.
Project Description: The Project is consisting of: Depot, 5 Stations, and 6.5 km
Viaduct Bridge.
Consultant: Systra, Ehaf, ACE
Owner: National Authority of Transportation
Project Estimated Duration: 34 Months.
Estimated Value: Approx. 5,200,000,000 L.E.
o Air Force Hospital Extension
 Feb 2015  Present.
Project Description: The Project is consisting of 2 Basement, Emergency floor, 9
Typical floors.
Consultant: GDP
Owner: Air Force
Project Estimated Duration: 12 Months.
Page 2 of 4
Estimated Value: Approx. 160,000,000 L.E.
o Dar El Bawasel Multi-Purpose Conference Hall
 Feb 2015  Present.
Project Description: The Project is consisting of 5 Levels.
Built Up Area : 7,000 m2
Consultant: Emad Khozam, AACE, DMG
Owner: Air Force
Project Estimated Duration: 21 Months.
Estimated Value: Approx. 190,000,000 L.E.
o Cairo International Airport
 Aug 2014  Feb 2015.
Project Description: The Project is consisting of: Runway , Taxiway , Service
Building.
Consultant: ECG
Owner: Cairo International Airport.
Project Estimated Duration: 20 Months.
Estimated Value: Approx. 234,000,000 LE.
o Bridges Department
 Jan 2013  Aug 2014.
Project Description: The Project is consisting of 4 bridges (Ard Ellewa Bridge,
Nahia Bridge, El Katamia Bridge, El Mosheer Bridge)
Owner: Egyptian Army Force
Project Estimated Duration: 12 Months.
Estimated Value: Approx. 250,000,000 LE.
o Cephalo and Penicillin Factory
 Jan 2012  Dec 2012.
Project Description: The Project is consisting of three buildings in Faid Ismailia
Consultant: ECG
Owner: Medical Union Pharmaceutical (MUP).
Project Estimated Duration: 20 Months.
Estimated Value: Approx. 190,000,000 LE.
Page 3 of 4
o El-Shahid Bridge Project
 Mar 2011  Dec 2011.
Project Description: The Project is consisting of 1 bridge.
Owner: Egyptian Army Force
Project Estimated Duration: 12 Months.
Estimated Value: Approx. 17,000,000 LE.
o Cairo/Alex upgrade road Project
 Oct 2009  Dec 2013.
Project Description: The Project is consisting of 6 bridges and 60 Km Roads and
Establish of 2 service road with length of 60 KM and service Buildigs .
Owner: GARBLT
Project Estimated Duration: 30 Months.
Estimated Value: Approx. 1.000,000,000 LE.
:in all Projects aboveResponsibilities
Guide and manage the planning team to perform following tasks:
 Studied & Prepared Tender Schedule.
 Establish new planning department in bridge department.
 Establish projects Baseline Schedule and recovery plans.
 Monitor progress, update Project Schedules during all phases of a project
and recommend corrective actions.
 Carry out resource planning for the project/programs and update as
required
 Establish progress measurement methodology for the project plans
 Support Project Manager and contract administrator in developing
documents related to claims.
 Analyze, monitor and comment on sub-contractors schedules, resource
plans, progress reports, claims and make recommendations
 Analyze variations and it's time impact.
Samcrete Egypt.
August 2008  October 2009.
Job Title: Project Management Engineer
 Preparation of the Base Line schedules for the projects together with all
project control procedures and work management plan.
 Monthly progress monitoring and reporting with schedule updates and
revisions for production building, non-production building and utilities.
 Tendering for new Project.
Page 4 of 4
Language Skills
 English.
 Arabic mother tongue.
Computer Skills
 Primavera Project Planner for Enterprise (P6.8).
 Microsoft office project.
 Expedition.
 Microsoft office.

More Related Content

What's hot (20)

9-2016
9-20169-2016
9-2016
ahmed mangastooo
shoukat buildings and Roads -
shoukat buildings and Roads -shoukat buildings and Roads -
shoukat buildings and Roads -
shoukat ali soomro
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
Ahmed Hikal
CV - 2017
CV - 2017CV - 2017
CV - 2017
MOHAMED FARAG Hussein
Abdallah Aboulatta
Abdallah AboulattaAbdallah Aboulatta
Abdallah Aboulatta
Abdallah Aboulatta
cv english
cv englishcv english
cv english
arafa ibrahim
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
MERAJUL ULHUDA
Presentation slide
Presentation slidePresentation slide
Presentation slide
iekygirl
M.samir resume
M.samir resumeM.samir resume
M.samir resume
Mohamed Samir
Mohmoud-Abdelrahem----------
Mohmoud-Abdelrahem----------Mohmoud-Abdelrahem----------
Mohmoud-Abdelrahem----------
Mahmoud Elsharafy
Ahmed El-sheikha C Vjune
Ahmed El-sheikha C VjuneAhmed El-sheikha C Vjune
Ahmed El-sheikha C Vjune
Ahmed Alsheikha, PMP
CV - 2017
CV - 2017CV - 2017
CV - 2017
MOHAMED FARAG Hussein
Eng.ahmed_Yousef CV
Eng.ahmed_Yousef   CVEng.ahmed_Yousef   CV
Eng.ahmed_Yousef CV
ahmed yousef
CV Osama Salah Aug 2015
CV Osama Salah Aug 2015CV Osama Salah Aug 2015
CV Osama Salah Aug 2015
osama shahin
CV Eng. Shehab Alaa
CV Eng. Shehab AlaaCV Eng. Shehab Alaa
CV Eng. Shehab Alaa
shehab el-din alaa el-din
my finall CV
my finall CVmy finall CV
my finall CV
Khabeer Al-Awad
Modified C.V 2015-R02
Modified C.V 2015-R02Modified C.V 2015-R02
Modified C.V 2015-R02
Abd elghany Gado
Omar Tariq Resume 2015
Omar Tariq Resume 2015 Omar Tariq Resume 2015
Omar Tariq Resume 2015
Omar Al-Samraaie
Ahmed Aboelezz cv
Ahmed  Aboelezz  cvAhmed  Aboelezz  cv
Ahmed Aboelezz cv
Ahmed Aboelezz
Mohamed Shipl PMP CV
Mohamed Shipl PMP CVMohamed Shipl PMP CV
Mohamed Shipl PMP CV
Mohamed Shipl , PMP

Similar to Mina Mourad CV (20)

Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
Tawfig Adham
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
Khalid Pervez
01. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016
Karim Absawi
Mustafa_original CV
Mustafa_original CV Mustafa_original CV
Mustafa_original CV
Moustafa El Dkhakhny A. M
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDF
Karim Ashry
cv
cvcv
cv
Ahmed Shedeed
KWKCV16
KWKCV16KWKCV16
KWKCV16
Klaus Kucyk
CV
CVCV
CV
salah ali
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
Faheem Ijaz Janjua, PMP
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
Ehab A. Azeem
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
hassanyoussef26
Adly CV111
Adly CV111Adly CV111
Adly CV111
Mohamed Aladly
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
savvas salakidis
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
2017 悋愕惘 悋悵悋惠 惆愕 忰惆 忰惡惶
Mohamed Hablas
Hafez CV
Hafez CVHafez CV
Hafez CV
Hafez Ebrahim
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3
Mohamed Sayed
CV Amr Zaki - PMP速
CV Amr Zaki - PMP速CV Amr Zaki - PMP速
CV Amr Zaki - PMP速
Amr Zaki - PMP速
C.V Mr. Rabih Makhoul
C.V Mr. Rabih MakhoulC.V Mr. Rabih Makhoul
C.V Mr. Rabih Makhoul
Rabih Makhoul
cv amr
cv amrcv amr
cv amr
Amr Faheem,PRMG
cm cv
cm cvcm cv
cm cv
mohamed fawzy

Mina Mourad CV

  • 1. Page 1 of 4 CURRICULUM VITAE Mina Mourad Mourcos minamorcus@yahoo.com Phone no.: 0128 8800380 Phone no.: 0128 3091471 PERSONAL DATA Mina Mourad Mourcos:Name Egyptian:Nationality 1/3/1984:Date of Birth EDUCATION Diploma in Professional Project Management (PRMG), American University in Cairo. (2009). Bachelor of Civil Engineering, Banha university 2008, project grade in Irrigation (Movement of water & organic material under Hydraulic Structure) (Very Good). Finishing the preparation Course of Planning and Schedule professional (PSP). Finishing the preparation course of Project Management Professional (PMP). WORK SUMMARY ORASCOM CONSTRUCTION SUBSIDIARIES October 2009 Till now. Job Title: Senior Planning Engineer o Great Cairo Metro ( Line 3 , Phase 4B ) Oct 2015 Present. Project Description: The Project is consisting of: Depot, 5 Stations, and 6.5 km Viaduct Bridge. Consultant: Systra, Ehaf, ACE Owner: National Authority of Transportation Project Estimated Duration: 34 Months. Estimated Value: Approx. 5,200,000,000 L.E. o Air Force Hospital Extension Feb 2015 Present. Project Description: The Project is consisting of 2 Basement, Emergency floor, 9 Typical floors. Consultant: GDP Owner: Air Force Project Estimated Duration: 12 Months.
  • 2. Page 2 of 4 Estimated Value: Approx. 160,000,000 L.E. o Dar El Bawasel Multi-Purpose Conference Hall Feb 2015 Present. Project Description: The Project is consisting of 5 Levels. Built Up Area : 7,000 m2 Consultant: Emad Khozam, AACE, DMG Owner: Air Force Project Estimated Duration: 21 Months. Estimated Value: Approx. 190,000,000 L.E. o Cairo International Airport Aug 2014 Feb 2015. Project Description: The Project is consisting of: Runway , Taxiway , Service Building. Consultant: ECG Owner: Cairo International Airport. Project Estimated Duration: 20 Months. Estimated Value: Approx. 234,000,000 LE. o Bridges Department Jan 2013 Aug 2014. Project Description: The Project is consisting of 4 bridges (Ard Ellewa Bridge, Nahia Bridge, El Katamia Bridge, El Mosheer Bridge) Owner: Egyptian Army Force Project Estimated Duration: 12 Months. Estimated Value: Approx. 250,000,000 LE. o Cephalo and Penicillin Factory Jan 2012 Dec 2012. Project Description: The Project is consisting of three buildings in Faid Ismailia Consultant: ECG Owner: Medical Union Pharmaceutical (MUP). Project Estimated Duration: 20 Months. Estimated Value: Approx. 190,000,000 LE.
  • 3. Page 3 of 4 o El-Shahid Bridge Project Mar 2011 Dec 2011. Project Description: The Project is consisting of 1 bridge. Owner: Egyptian Army Force Project Estimated Duration: 12 Months. Estimated Value: Approx. 17,000,000 LE. o Cairo/Alex upgrade road Project Oct 2009 Dec 2013. Project Description: The Project is consisting of 6 bridges and 60 Km Roads and Establish of 2 service road with length of 60 KM and service Buildigs . Owner: GARBLT Project Estimated Duration: 30 Months. Estimated Value: Approx. 1.000,000,000 LE. :in all Projects aboveResponsibilities Guide and manage the planning team to perform following tasks: Studied & Prepared Tender Schedule. Establish new planning department in bridge department. Establish projects Baseline Schedule and recovery plans. Monitor progress, update Project Schedules during all phases of a project and recommend corrective actions. Carry out resource planning for the project/programs and update as required Establish progress measurement methodology for the project plans Support Project Manager and contract administrator in developing documents related to claims. Analyze, monitor and comment on sub-contractors schedules, resource plans, progress reports, claims and make recommendations Analyze variations and it's time impact. Samcrete Egypt. August 2008 October 2009. Job Title: Project Management Engineer Preparation of the Base Line schedules for the projects together with all project control procedures and work management plan. Monthly progress monitoring and reporting with schedule updates and revisions for production building, non-production building and utilities. Tendering for new Project.
  • 4. Page 4 of 4 Language Skills English. Arabic mother tongue. Computer Skills Primavera Project Planner for Enterprise (P6.8). Microsoft office project. Expedition. Microsoft office.