ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
CURRICULAM VITAE
?MRUNAL KOTHARI
CAREER OBJECTIVE:
To be effective in employing the technical and managerial skills acquired throughout
the career and to be abreast of the latest art of technology.
?
PRESENT DESIGNATION General Manager ¨C Instrumentation & Electrical
? MAJOR STRENGTHS
14+ years of international experience in EPC turnkey
projects.
Experience of handling renowned project consultants like:
Mott McDonald, UK
Tata Consulting engineers, India
NJS Consultants, Japan
Hyflux Engineers Pvt. Ltd. , Singapore
L&T VALDEL, Bangalore
Aker Kvarner, Mumbai
Ambidextrous in technical and managerial skills acquired
by working zealously throughout my career.
Successfully completed all the projects taken in hand
within the time limit.
Plural experience in project management, Team
management, Instrumentation Design, System Design,
Preparation of Purchase requisition to order placement,
Technical Discussions and project related correspondence
with clients, Commercial discussions with suppliers,
Designing of PLC and DCS systems with the system
Integrators.
Page 1 of 8
Commissioning of DCS, F&G, ESD systems, FAT,
Erection & Hook up of field instruments, Procurement
Using SAP R3, Project Estimation & Technical evaluation
of bid.
Fully conversant with a turnkey EPC project cycle &
execution activities.
?
PRESENT EMPLOYER
ENVIRO CONTROL ASSOCIATES (I) PVT.LTD.
(Fast Growing EPC company in the field of Tertiary Treatment Plant,
Water Treatment, Sewage Treatment and CETP Turnkey projects all over
INDIA.)
?
PREVIOUS EMPLOYER
LARSEN & TOUBRO LTD., INDIA.
(International & Domestic Oil & Gas Special Projects Division)
?
MAJOR
QUALIFICATIONS
MBA - Project Management
(Sikkim Manipal University)
B.E. -- Instrumentation & Control
? E-mail & Contact No.: mrunalkothari99@gmail.com, +91-9924561491
?
PERMANANT ADDRESS:
Mrunal S. Kothari
301, Amar Palace Apartment, Dev deep Society,
Parle Point, Surat - 395007.
? BIRTH DATE 30.11.1980
? VALID PASSPORT NO. G 1410165
Page 2 of 8
MY CAREER ORIENTATION:
November¡¯ 2006 ¨C Till Date
Employer: ENVIRO CONTROL ASSOCIATES (I) PVT. LTD., SURAT
GLIMPSE OF APPERENT PROJECTS:
I have listed below the outstanding project assignments out of variety of I have so far
executed for better understanding of my project management capabilities, commitment and
what I have delivered so far to my present employer.
? INDIA¡¯s Largest capacity of 40 MLD Tertiary Treatment plant at Bamroli, Surat.
The plant is jointly designed by M/s. ECA, India and world leader M/s. Hyflux Engineering
Pvt. Ltd., Singapore worldwide pioneer in ultra filtration technology. It is a UV + RO
based tertiary treatment plant which generates industrial grade potable water from the
sewage treatment plant outlet water.
I have achieved as a chief of the automation & electrical team¡­..
Successful commissioning and operation of the largest capacity UF + RO membrane
based technology in INDIA for first time.
Successfully implemented the crucial instrumentation and automation system of RO + UF
system in line with process critical process requirements of experts of M/s. Hyflux,
Singapore.
On My Shoulders:
- Co-ordination with process experts of M/s. Hyflux for technical and process data
generation.
- To take lead, to understand the UF & RO technologies and operational sequences.
- To achieve and to ensure that P&IDs are in line with established UF+RO process,
selection of all process analyzers, Control Valves, VFD are as per the process
requirements &conditions.
Page 3 of 8
- To get developed and implemented, smooth and accurate operation logic for accurate
control and data generation.
- To precisely implement the safety systems for F&G and ESD systems.
- Techno- commercial discussions with PLC system and instrument suppliers.
- Selection of all other field instruments & other items.
- Co-ordination with client, Technical discussions and presentations of the work
progress and for drawing approval.
- Providing Decisions to the electrical associates team for site related issues.
- Development and arrangements of the layouts and other installation related decisions
to site team.
- Planning and monitoring of site execution work with site incharge.
- Providing Guidance to Precommissioning and commissioning team of the plant.
- Handing over to operation and maintenance team.
Glimpse of online instrumentation / automation and electrical work scope of project:
- Commissioning of Siemens PLC system S7 414H of size 10000+ I/Os
- Implementation of Closed loops ¨C 125+ Nos.
- Tuning and operations of Precise control valves- 25 Nos.
- Integration of online Liquid analyzers ( Online Total Chlorine Analyzers, Turbidity
Analyzers, Conductivity Analyzers, pH+ORP Analyzers) ¨C 32 Nos.
- Commissioning of Gas analyzers like H2S analyzer, CH4 Analyzer and Moisture
Analyzers ¨C 6 Nos.
- Commissioning of VFDs ¨C (Max. Rating ¨C 132 KW Motor) ¨C 23 Nos.
- Flow loops of Magnetic Flowmeters ¨C 34 Nos.
- All other field instruments like ultrasonic flow and level meters, Pressure/ Diff.
Pressure/ Temp. Transmitters ¨C LOT
- To provide E&I support for Power generation by Bio-gas Based Gas Engine in the
same project scope.
? SMCs¡¯ (FIRST IN INDIA INITIATIVE) INTEGRATION OF ALL STPs AND
PUMPING STATIONS THROUGH PLC BASED SCADA SYSTEM PROJECT
Client: Surat Municipal Corporation, Surat.
Department: Drainage Department
Page 4 of 8
(Monitoring and Control of total 29 locations through SCADA Automation Work)
- Total 25000+ I/O size of PLC systems along with all types of third party
communications like ProfiBus-DP, ProfiBus-PA, MODBUS (RS-485), DeviceNet,
Ethernet etc. in a single integration project.
- Study to develop optimum system and field architecture.
- Development of process ¨C instrumentation datasheets.
- Co-Ordination with client for approval of documents / Drawings.
- Technical discussion with consultants for the project approvals.
- Implementation of system architecture and communication topology.
- Selection and establishment of communication between remote locations.
- Technical and commercial negotiations with sub contractors.
- Commercial negotiations with the instrument and system suppliers.
- Procurement of Instruments and control system.
- Site follow-ups with engineers & sub contractors and troubleshooting.
- Team Building and team motivation.
- Pre-commissioning of individual site location.
- Pre- commissioning (Integration) of total 29 different locations of the city.
Commissioning of central SCADA control room and data acquisition system.
- Associated Electrical works including MCC panels, LT panels, APFC panels,
transformer selection, cable schedules, RS-485 communication with PLC system etc.
- VFD / Inverter selection and commissioning in close loop thru PLC system.
- Successfully accomplished a validation of entire Project with TPI (Third Party
Inspector) and client.
- Handover procedures and formalities.
Work Force
I am Heading: 7 Site Engineers ¨C B.E. ¨C Instrumentation / Electrical
3 Diploma Engineers
10 ITIs
This is first of its kind in INDIA that any municipal corporation has implemented such a
herculean project to integrate, monitor and control the process of sewage treatment plants
and 23 pumping stations within city thru automation and SCADA based control system.
Being cranium of this valuable project for our organization also, I got an opportunity to
challenge my own precincts of project management. The scope of Automation and
integration Includes:
Page 5 of 8
Installation, Testing, commissioning and integration of total more than 1500 instruments and
analyzers communicating on various protocols like Profi-DP, Profi-PA, MODBUS and
ANALOG signals to Central control room located at SMC premise.
- Online Process Analyzers (pH, TSS, DO, RCL, MLSS and TOC Analyzer)
- Online Flow Meters (Ultrasonic, MFT, DPT)
- Level Monitoring (Ultrasonic, Radar )
- Online TOC analyzer (HT Type)
- Installation of total 74 Nos. of Variable Frequency Drives and communication with the
PLC system for power optimization.
- Implementation of PLC based automation and SCADA system at 29 plants.
- Existing PLC system communication with the new PLC system.
- Up gradation of electrical panels (LT / MCC) for auto ON/ OFF operation thru PLC
system.
- Online Chlorination monitoring and control.
- Integration of all 29 locations at CSCR ¨C Central SCADA CONTROL ROOM via MLLN
network.
Jan¡¯ 2006 ¨C Oct¡¯ 2006:
Employer: LARSEN & TOUBRO LTD.
Project: SHRC (SH Complex Revamping) Project
Client: ONGC
My Profile in the Project:
- Preparation of project documents like cable schedule, I/O Assignment, Hook Up
Diagrams, Functional Schematics, Various Layouts.
- Preparation of Purchase Specification (PS) for mainstream items.
- FAT (Factory Acceptance Test) of Systems (DCS, PLC) at vendor premises and
troubleshooting.
- Erection and Commissioning of field instruments and systems.
- Follow-up for material with vendors.
- System Hook Up and commissioning at Off-Shore oil platform
June¡¯ 2005 ¨C Dec¡¯ 2005:
Employer: LARSEN & TOUBRO LTD. - International Oil & Gas Projects
Page 6 of 8
Client: BGEPIL (British Gas Exploration & Production India Ltd.)
- Pre-bid engineering of a BGEPIL¨C NRPOD Tapti field Project. Pre-bid engineering
involves technical evaluation of new scope of work along with existing platform
interfacing work and costing of overall instrumentation work.
- Study & Analysis of client¡¯s project tender & detail study of FEED carried out by client
for the proposed project.
- Study of client¡¯s specification for field instruments & systems like DCS, ESD, HVAC.
- Estimation of scope of work & time duration to execute work at
ONSHORE/OFFSHORE.
- Optimization of planning schedule for execution of E&I activities at
ONSHORE/OFFSHORE.
- Vendor Coordination for quotations for plenty of instruments & Systems.
- Evaluation of Technical / Commercial quotations of various vendors.
- Estimation of manpower for instrumentation work.
- Design of Control Room/ Equipment room.
Jan¡¯ 2004 - May¡¯2005
Employer: LARSEN & TOUBRO LTD. - International Oil & Gas Projects
Client: QATAR PETROLEUM
International Project: PS-2/3- Living Quarter & Power Upgrade Project, QATAR
My Profile in the Project:
In PS-2/3 project I worked as a leading instrumentation engineer during construction phase
(On-Shore) of the project at hazira- Surat and went to country of Qatar (Off-Shore oil
platform) for commissioning activities. My major concerns as an instrumentation engineer
were: -
- Study of engineering drawings like Cause & Effect Diagrams, P&IDs, Hook Up
drawings, Cable Schedule, Interconnection diagrams, Cable Routing & Instrument
installation details.
¡ú Site supervision:
- Co-ordination with subcontractor for execution of job & material.
- To plan & execute E&I activities as per material & manpower availability.
- Study of cable schedule, cable interconnection diagrams and termination.
- Loop checking & Interfacing of field devices with the systems.
- Installation & hook- up of instruments.
- Pre commissioning of Systems & Trouble Shooting.
- Logic checks as per cause & effect diagram.
- Commissioning of HVAC along with chillers.
- Commissioning of F&G system.
- Interfacing of DCS & F&G with HVAC.
Jan¡¯ 2003 ¨C Jan¡¯ 2004:
Page 7 of 8
Employer: LARSEN & Toubro Ltd. - Oil & Gas Special Projects
Client: ONGC.
Project: Mumbai North Water Injection Project (MNW)
I worked as a Trainee instrumentation engineer (ON-SHORE).
DETAILS OF ACADEMIC QUALIFICATIONS:
2013¨C 2015 : MBA ¨C Project Management, Aggregate First Class ¨C Sikkim Manipal
University
1998 ¨C May, 2002: Bachelor of Engineering, First Class, 65%- Instrumentation & Control ¨C
Dharamsinh Desai Institute Of Technology, Nadiad, Gujarat, INDIA.
Yours Faithfully,
Mrunal Kothari.
Page 8 of 8

More Related Content

What's hot (20)

PDF
Mark Crame Lead Instrument Engineer CV
Mark Crame
?
PDF
Uday Kiran Updated Resume
Uday Kiran
?
DOCX
PEckardt Resume 2014
Paul Eckardt
?
DOC
Bill Rogers CV 19-01-15
Bill Rogers
?
DOCX
Electrical and Instrumentation Engineer (Offshore/Onshore)
Kiran Y V N Rao
?
DOC
KARTHICK-DESIGN RESUME
karthikeyan radhakrishnan
?
DOC
Resume_Instrumentation Engineer_7.5 year experience
DHRUVA MISHRA
?
DOC
resume_Mr_
Sanjay Dhar
?
PDF
Khubaib Khan_CV Instrument
Khubaib Khan
?
DOCX
Mohamed Saleh fathy final cv.doc
mohamed saleh
?
DOC
MY_CV_1
Rahul R
?
DOCX
Instrumentation Engineer
Roger Pelletier
?
DOC
D. Medina's CV (01)
Danilo Medina
?
PDF
Resume Rohan Badadhe
rohan badadhe
?
DOCX
Suman Professional
Suman Das
?
DOC
cv Rashid Tagelsir updated . -2016
Rashid Tagelsir MBA,MPM,¨CCBP,CQM seeking for new role
?
PDF
CV_Amit Ghule
Amit Ghule
?
DOCX
RahulSingh_CV
RAHUL SINGH
?
DOC
Iprofessional
karaguppi
?
PPTX
Koch Modular - Automation and Control System Capabilities
Koch Modular Process Systems, LLC.
?
Mark Crame Lead Instrument Engineer CV
Mark Crame
?
Uday Kiran Updated Resume
Uday Kiran
?
PEckardt Resume 2014
Paul Eckardt
?
Bill Rogers CV 19-01-15
Bill Rogers
?
Electrical and Instrumentation Engineer (Offshore/Onshore)
Kiran Y V N Rao
?
KARTHICK-DESIGN RESUME
karthikeyan radhakrishnan
?
Resume_Instrumentation Engineer_7.5 year experience
DHRUVA MISHRA
?
resume_Mr_
Sanjay Dhar
?
Khubaib Khan_CV Instrument
Khubaib Khan
?
Mohamed Saleh fathy final cv.doc
mohamed saleh
?
MY_CV_1
Rahul R
?
Instrumentation Engineer
Roger Pelletier
?
D. Medina's CV (01)
Danilo Medina
?
Resume Rohan Badadhe
rohan badadhe
?
Suman Professional
Suman Das
?
CV_Amit Ghule
Amit Ghule
?
RahulSingh_CV
RAHUL SINGH
?
Iprofessional
karaguppi
?
Koch Modular - Automation and Control System Capabilities
Koch Modular Process Systems, LLC.
?

Viewers also liked (12)

PDF
IBA AR1213 AccPDF
Katie Hoskins
?
DOC
Jerett_Jara_Resume_2016
Jerett Jara
?
PDF
Gene ×÷Æ·¼¯
Gene Lai
?
PPTX
Hvrsports news
HVR Sports Inc
?
PDF
Rajan_Profile_20162507
Rajan Sundararajan
?
PPTX
Presentation by abhijith suresh
abhijith suresh
?
DOCX
HKA Resume July 15
Hunter Aultman
?
PPTX
Types of malware
techexpert2345
?
PDF
§âOland 2016
x-mss
?
PDF
Company Profile - NEW
Dinesh Agarwal
?
PDF
Oop unit 07 c¨¢c k? thu?t k? th?a
Tr¨¢ng H¨¤ Vi?t
?
IBA AR1213 AccPDF
Katie Hoskins
?
Jerett_Jara_Resume_2016
Jerett Jara
?
Gene ×÷Æ·¼¯
Gene Lai
?
Hvrsports news
HVR Sports Inc
?
Rajan_Profile_20162507
Rajan Sundararajan
?
Presentation by abhijith suresh
abhijith suresh
?
HKA Resume July 15
Hunter Aultman
?
Types of malware
techexpert2345
?
§âOland 2016
x-mss
?
Company Profile - NEW
Dinesh Agarwal
?
Oop unit 07 c¨¢c k? thu?t k? th?a
Tr¨¢ng H¨¤ Vi?t
?
Ad

Similar to Mrunal--CV Latest (20)

DOC
Brij mohan cv
Brij Mohan
?
DOCX
Paul_joshua_resume_JAN2016
paul joshua
?
DOCX
Resume-Rajib Sharma(L)
Rajib Sharma
?
DOC
Resume-Rajib Sharma
Rajib Sharma
?
DOC
Deepak Resume
deepakkoottappalli1985
?
DOCX
Rajesh CV -E & I
RAJESH LANDE
?
DOCX
suresh_CV
suresh kumar
?
PDF
RESUME
Anandkumar Shah
?
DOCX
Resume_Chandan
Chandan Ray
?
DOCX
NAVEEN SUKUMAR PAKIRLA Resume1
Naveen Sukumar
?
PDF
Resume 2016 june
KAJA MOHIDEEN
?
PDF
Debashis_Resume
Debashis mishra
?
PDF
Resume-Prashanth
prashanth moorthy
?
DOC
Ramanuja Sharma_CV
Ramanuja Sharma MK
?
PDF
Resume Haris
Muhammad Haris Ali
?
DOCX
Gaurav Dhawan_ Resume.doc
Gaurav Dhawan
?
DOCX
Updated_CV
Sandip Shrivastava
?
DOC
Ram resume
RAM KUMAR
?
Brij mohan cv
Brij Mohan
?
Paul_joshua_resume_JAN2016
paul joshua
?
Resume-Rajib Sharma(L)
Rajib Sharma
?
Resume-Rajib Sharma
Rajib Sharma
?
Rajesh CV -E & I
RAJESH LANDE
?
suresh_CV
suresh kumar
?
Resume_Chandan
Chandan Ray
?
NAVEEN SUKUMAR PAKIRLA Resume1
Naveen Sukumar
?
Resume 2016 june
KAJA MOHIDEEN
?
Debashis_Resume
Debashis mishra
?
Resume-Prashanth
prashanth moorthy
?
Ramanuja Sharma_CV
Ramanuja Sharma MK
?
Resume Haris
Muhammad Haris Ali
?
Gaurav Dhawan_ Resume.doc
Gaurav Dhawan
?
Ram resume
RAM KUMAR
?
Ad

Mrunal--CV Latest

  • 1. CURRICULAM VITAE ?MRUNAL KOTHARI CAREER OBJECTIVE: To be effective in employing the technical and managerial skills acquired throughout the career and to be abreast of the latest art of technology. ? PRESENT DESIGNATION General Manager ¨C Instrumentation & Electrical ? MAJOR STRENGTHS 14+ years of international experience in EPC turnkey projects. Experience of handling renowned project consultants like: Mott McDonald, UK Tata Consulting engineers, India NJS Consultants, Japan Hyflux Engineers Pvt. Ltd. , Singapore L&T VALDEL, Bangalore Aker Kvarner, Mumbai Ambidextrous in technical and managerial skills acquired by working zealously throughout my career. Successfully completed all the projects taken in hand within the time limit. Plural experience in project management, Team management, Instrumentation Design, System Design, Preparation of Purchase requisition to order placement, Technical Discussions and project related correspondence with clients, Commercial discussions with suppliers, Designing of PLC and DCS systems with the system Integrators. Page 1 of 8
  • 2. Commissioning of DCS, F&G, ESD systems, FAT, Erection & Hook up of field instruments, Procurement Using SAP R3, Project Estimation & Technical evaluation of bid. Fully conversant with a turnkey EPC project cycle & execution activities. ? PRESENT EMPLOYER ENVIRO CONTROL ASSOCIATES (I) PVT.LTD. (Fast Growing EPC company in the field of Tertiary Treatment Plant, Water Treatment, Sewage Treatment and CETP Turnkey projects all over INDIA.) ? PREVIOUS EMPLOYER LARSEN & TOUBRO LTD., INDIA. (International & Domestic Oil & Gas Special Projects Division) ? MAJOR QUALIFICATIONS MBA - Project Management (Sikkim Manipal University) B.E. -- Instrumentation & Control ? E-mail & Contact No.: mrunalkothari99@gmail.com, +91-9924561491 ? PERMANANT ADDRESS: Mrunal S. Kothari 301, Amar Palace Apartment, Dev deep Society, Parle Point, Surat - 395007. ? BIRTH DATE 30.11.1980 ? VALID PASSPORT NO. G 1410165 Page 2 of 8
  • 3. MY CAREER ORIENTATION: November¡¯ 2006 ¨C Till Date Employer: ENVIRO CONTROL ASSOCIATES (I) PVT. LTD., SURAT GLIMPSE OF APPERENT PROJECTS: I have listed below the outstanding project assignments out of variety of I have so far executed for better understanding of my project management capabilities, commitment and what I have delivered so far to my present employer. ? INDIA¡¯s Largest capacity of 40 MLD Tertiary Treatment plant at Bamroli, Surat. The plant is jointly designed by M/s. ECA, India and world leader M/s. Hyflux Engineering Pvt. Ltd., Singapore worldwide pioneer in ultra filtration technology. It is a UV + RO based tertiary treatment plant which generates industrial grade potable water from the sewage treatment plant outlet water. I have achieved as a chief of the automation & electrical team¡­.. Successful commissioning and operation of the largest capacity UF + RO membrane based technology in INDIA for first time. Successfully implemented the crucial instrumentation and automation system of RO + UF system in line with process critical process requirements of experts of M/s. Hyflux, Singapore. On My Shoulders: - Co-ordination with process experts of M/s. Hyflux for technical and process data generation. - To take lead, to understand the UF & RO technologies and operational sequences. - To achieve and to ensure that P&IDs are in line with established UF+RO process, selection of all process analyzers, Control Valves, VFD are as per the process requirements &conditions. Page 3 of 8
  • 4. - To get developed and implemented, smooth and accurate operation logic for accurate control and data generation. - To precisely implement the safety systems for F&G and ESD systems. - Techno- commercial discussions with PLC system and instrument suppliers. - Selection of all other field instruments & other items. - Co-ordination with client, Technical discussions and presentations of the work progress and for drawing approval. - Providing Decisions to the electrical associates team for site related issues. - Development and arrangements of the layouts and other installation related decisions to site team. - Planning and monitoring of site execution work with site incharge. - Providing Guidance to Precommissioning and commissioning team of the plant. - Handing over to operation and maintenance team. Glimpse of online instrumentation / automation and electrical work scope of project: - Commissioning of Siemens PLC system S7 414H of size 10000+ I/Os - Implementation of Closed loops ¨C 125+ Nos. - Tuning and operations of Precise control valves- 25 Nos. - Integration of online Liquid analyzers ( Online Total Chlorine Analyzers, Turbidity Analyzers, Conductivity Analyzers, pH+ORP Analyzers) ¨C 32 Nos. - Commissioning of Gas analyzers like H2S analyzer, CH4 Analyzer and Moisture Analyzers ¨C 6 Nos. - Commissioning of VFDs ¨C (Max. Rating ¨C 132 KW Motor) ¨C 23 Nos. - Flow loops of Magnetic Flowmeters ¨C 34 Nos. - All other field instruments like ultrasonic flow and level meters, Pressure/ Diff. Pressure/ Temp. Transmitters ¨C LOT - To provide E&I support for Power generation by Bio-gas Based Gas Engine in the same project scope. ? SMCs¡¯ (FIRST IN INDIA INITIATIVE) INTEGRATION OF ALL STPs AND PUMPING STATIONS THROUGH PLC BASED SCADA SYSTEM PROJECT Client: Surat Municipal Corporation, Surat. Department: Drainage Department Page 4 of 8
  • 5. (Monitoring and Control of total 29 locations through SCADA Automation Work) - Total 25000+ I/O size of PLC systems along with all types of third party communications like ProfiBus-DP, ProfiBus-PA, MODBUS (RS-485), DeviceNet, Ethernet etc. in a single integration project. - Study to develop optimum system and field architecture. - Development of process ¨C instrumentation datasheets. - Co-Ordination with client for approval of documents / Drawings. - Technical discussion with consultants for the project approvals. - Implementation of system architecture and communication topology. - Selection and establishment of communication between remote locations. - Technical and commercial negotiations with sub contractors. - Commercial negotiations with the instrument and system suppliers. - Procurement of Instruments and control system. - Site follow-ups with engineers & sub contractors and troubleshooting. - Team Building and team motivation. - Pre-commissioning of individual site location. - Pre- commissioning (Integration) of total 29 different locations of the city. Commissioning of central SCADA control room and data acquisition system. - Associated Electrical works including MCC panels, LT panels, APFC panels, transformer selection, cable schedules, RS-485 communication with PLC system etc. - VFD / Inverter selection and commissioning in close loop thru PLC system. - Successfully accomplished a validation of entire Project with TPI (Third Party Inspector) and client. - Handover procedures and formalities. Work Force I am Heading: 7 Site Engineers ¨C B.E. ¨C Instrumentation / Electrical 3 Diploma Engineers 10 ITIs This is first of its kind in INDIA that any municipal corporation has implemented such a herculean project to integrate, monitor and control the process of sewage treatment plants and 23 pumping stations within city thru automation and SCADA based control system. Being cranium of this valuable project for our organization also, I got an opportunity to challenge my own precincts of project management. The scope of Automation and integration Includes: Page 5 of 8
  • 6. Installation, Testing, commissioning and integration of total more than 1500 instruments and analyzers communicating on various protocols like Profi-DP, Profi-PA, MODBUS and ANALOG signals to Central control room located at SMC premise. - Online Process Analyzers (pH, TSS, DO, RCL, MLSS and TOC Analyzer) - Online Flow Meters (Ultrasonic, MFT, DPT) - Level Monitoring (Ultrasonic, Radar ) - Online TOC analyzer (HT Type) - Installation of total 74 Nos. of Variable Frequency Drives and communication with the PLC system for power optimization. - Implementation of PLC based automation and SCADA system at 29 plants. - Existing PLC system communication with the new PLC system. - Up gradation of electrical panels (LT / MCC) for auto ON/ OFF operation thru PLC system. - Online Chlorination monitoring and control. - Integration of all 29 locations at CSCR ¨C Central SCADA CONTROL ROOM via MLLN network. Jan¡¯ 2006 ¨C Oct¡¯ 2006: Employer: LARSEN & TOUBRO LTD. Project: SHRC (SH Complex Revamping) Project Client: ONGC My Profile in the Project: - Preparation of project documents like cable schedule, I/O Assignment, Hook Up Diagrams, Functional Schematics, Various Layouts. - Preparation of Purchase Specification (PS) for mainstream items. - FAT (Factory Acceptance Test) of Systems (DCS, PLC) at vendor premises and troubleshooting. - Erection and Commissioning of field instruments and systems. - Follow-up for material with vendors. - System Hook Up and commissioning at Off-Shore oil platform June¡¯ 2005 ¨C Dec¡¯ 2005: Employer: LARSEN & TOUBRO LTD. - International Oil & Gas Projects Page 6 of 8
  • 7. Client: BGEPIL (British Gas Exploration & Production India Ltd.) - Pre-bid engineering of a BGEPIL¨C NRPOD Tapti field Project. Pre-bid engineering involves technical evaluation of new scope of work along with existing platform interfacing work and costing of overall instrumentation work. - Study & Analysis of client¡¯s project tender & detail study of FEED carried out by client for the proposed project. - Study of client¡¯s specification for field instruments & systems like DCS, ESD, HVAC. - Estimation of scope of work & time duration to execute work at ONSHORE/OFFSHORE. - Optimization of planning schedule for execution of E&I activities at ONSHORE/OFFSHORE. - Vendor Coordination for quotations for plenty of instruments & Systems. - Evaluation of Technical / Commercial quotations of various vendors. - Estimation of manpower for instrumentation work. - Design of Control Room/ Equipment room. Jan¡¯ 2004 - May¡¯2005 Employer: LARSEN & TOUBRO LTD. - International Oil & Gas Projects Client: QATAR PETROLEUM International Project: PS-2/3- Living Quarter & Power Upgrade Project, QATAR My Profile in the Project: In PS-2/3 project I worked as a leading instrumentation engineer during construction phase (On-Shore) of the project at hazira- Surat and went to country of Qatar (Off-Shore oil platform) for commissioning activities. My major concerns as an instrumentation engineer were: - - Study of engineering drawings like Cause & Effect Diagrams, P&IDs, Hook Up drawings, Cable Schedule, Interconnection diagrams, Cable Routing & Instrument installation details. ¡ú Site supervision: - Co-ordination with subcontractor for execution of job & material. - To plan & execute E&I activities as per material & manpower availability. - Study of cable schedule, cable interconnection diagrams and termination. - Loop checking & Interfacing of field devices with the systems. - Installation & hook- up of instruments. - Pre commissioning of Systems & Trouble Shooting. - Logic checks as per cause & effect diagram. - Commissioning of HVAC along with chillers. - Commissioning of F&G system. - Interfacing of DCS & F&G with HVAC. Jan¡¯ 2003 ¨C Jan¡¯ 2004: Page 7 of 8
  • 8. Employer: LARSEN & Toubro Ltd. - Oil & Gas Special Projects Client: ONGC. Project: Mumbai North Water Injection Project (MNW) I worked as a Trainee instrumentation engineer (ON-SHORE). DETAILS OF ACADEMIC QUALIFICATIONS: 2013¨C 2015 : MBA ¨C Project Management, Aggregate First Class ¨C Sikkim Manipal University 1998 ¨C May, 2002: Bachelor of Engineering, First Class, 65%- Instrumentation & Control ¨C Dharamsinh Desai Institute Of Technology, Nadiad, Gujarat, INDIA. Yours Faithfully, Mrunal Kothari. Page 8 of 8