Mohamed Ahmed Salah
Between two bridges  Abu Dhabi - UAE
Mobile: +971559486914
E-mail: ala799@hotmail.com
ala799@gmail.com
Ahmed.salahmohamed@dargroup.com
Career Objective
Seeking an intellectually challenging position within an international environment, whereby I can
build upon my education, experience and interpersonal skills that would allow for further career
development.
Educational Background
 Bachelor in civil engineering- 2006
The High Technological Institute at 10th of Ramadan city, A.R.E.
Career History
Consultant Group International Company (UAE)- March 2007 till January 2012.
Tittle : Site Structural Engineer
Responsibilities
 Preparation of daily, weekly progress reports, attending the meetings with the contractors and
follow up the actual site progress.
 Ensure that the selected material (Cement, reinforcement concrete, bituminous, plywood,
gravels, sand etc.) are in accordance with the agreed specification, standards and as per the
basic and engineering design stipulated in the Contract document.
 Follow up the project phases progress and updating the actual progress vs. planned schedule.
 Preparation the Bill of Quantity and Cost Estimate related to the projects.
 Checking & reviewing the concrete sample testing results which being received from Laboratory
and to grant that the results are within the design acceptable limits.
 Carrying out numerous checks for the reinforcement steel bars size and type, in order to grant
that the site construction material is implemented based on the agreed design calculations,
engineering basis & standards.
 Ensure that the engineering specifications, standards and procedures are compliance /
implemented on all Phases of Projects.
 Reviewing the project scope of work, drawings, specifications, material submittals and other
technical documents related to the projects.
 Carrying out the required in-house civil design and detailed engineering works, including the
structural analysis / modeling, reinforced concrete design, preparation of drawings, provision of
technical / standard details, etc.
 Supervising the project site construction phases to be sure that the project construction is being
implemented as per the planned schedule and agreed scope of work.
 Reviewing any design changes may be requested by the owner, preparation the design change
request and preparation, brief scope of work, detailed engineering, etc.
 Reviewing the prepared punch list. Following up the pre-commissioning & commissioning
completion stages with all concerned parties.
 Piling Site Works (related to the implemented project as indicated in the attached project list).
 Reviewing the piling access and check the steel bars size & type.
 Attend the site piling installation to ensure that the excavation piles reach to the acceptable
design depth.
 Checking the piling concrete samples to grant that the results are within the acceptable limits.
 Attend, check & supervise the required piling static load and integrity tests.
Personal Skills
- High learning ability & organized thinking.
- Self-motivated, organized and detail oriented; attention to details and quality of work.
- Ability to work under pressure and tight deadlines.
- Flexible team player.
Computer Skills
- Excellent command of Windows, Word, Excel & Power Point.
- AutoCAD (2D).
- Proficient user of Internet facilities.
- Primavera project planner (p3).
Language Skills
- Arabic : Native
- English : Very good (Written & Spoken)
Personal Data
- Date of Birth : january 1, 1981
- Born : Arab Republic of Egypt
- Nationality : Egyptian
- Marital Status : Married
- Military Status : Exempted
The following table shown the projects which finalized / are being constructed in Abu Dhabi.
NO OWNER PROJECT DETAIL STATUS
1
ABDULL ABD ALL AL
HAMIDAN VILLAS
This project consisted of Three (3) Villas each,
one have two floors and one roof.
finish all
2
ABU DHABI NATIONALITIES
AND RESIDENCE
DEPARTMENT
project was consisted of the following:-
a]printing and services building (two levels).
b] New additional level to the existing club.
c] Changing the existing internal design to new
design for the visa building.
D]new commercial building consists of two
levels
finish all
3 HAMZA AL GOHY VILLA
This project consisted of one villa, ground floor,
1st level and roof.
finish all
4
INDUSTRIAL SHABRA
BUILDING (Owner
This building consisted of two floors each, one
divided to specific offices.
finish all
5
MAJOR /SAEED OBAID AL
MAZROU VILLA
This project consists of one villa, and site /
external meeting hall & external kitchen. Such
villa consisted of ground floor 1st floor & roof.
finish all
6 RASHID AL ZAABI VILLAS
Four (4) villas, each one consists of ground
floor, 1st floor and roof .
finish all
7
INDUSTRIAL SHABRA
PROJECT (Owner: Mr. Mattar
Al Rumaithy)
This building consists of two floors each, one
divided to specific offices.
finish all
8
MR. AHMED OBAID AL
MAZROOE VILLA
This villa consists of ground floor and 1st floor
levels.
finish all
9
MRS. MYTHAA & MARIAM
VILLAS
This project consisted of two villas, one for Mrs.
Mythaa and the other for Mrs. Mariam. Each
villa consisted of ground, 1st and roof level.
finish all
10
MR. SULTAN AL ZAABI
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
11 MR. HAMEED AL ZAABI This project consisted of six villas, Each villa finish all
COMPOUND consists of ground, 1st and roof level.
12
MR. OMAR AL ZAABI
COMPOUND
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
13
MR. ABDULA AL ZAHERY
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
14
MR. SLAYAM EL KESARY
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
15
MR. BEKHET EL KESERY
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
16
MRS.HAMDA ABD EL
RAHMAN EL ZAABI
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
17
MRS.SHKHA ABD EL
RAHMAN EL ZAABI
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
18 MRS.ALIAA EL SOWEDY
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
19
MR. AHMED OBAID AL
MAZROOE 8 VILLA
This project consisted of eight villas, Each villa
consists of ground, 1st and roof level.
finish all
20 MR.KHALIFA EL KINDI
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
21 MRS.SHAMSA MOHAMED
This project consisted of one villas, Each villa
consists of ground, 1st and roof level.
finish all
22
MR. AHMED OBAID AL
MAZROOE BUILDING
This project consisted of one building of seven
typical floors and roof
finish all
23 Mr.abu salem
This project consisted of extension for the
main villa + service block
finish all
24 Mr.Mohamed ateq
This project consisted of four villas, Each villa
consists of ground, 1st and roof level.+four
service block
finish all
25 Mr.obaid ateq
This project consisted of four villas, Each villa
consists of ground, 1st and roof level.+four
service block
finish all
26
EXECUTION PLAN FOR THE
DRAINAGE AND WATER
SUPPLY NET FOR ALL THE
ABOVE PROJECT
Preparation of the detailed drawings, basic
design required for all above projects,
indicating B.O.Q., cost estimate, routine of the
drainage & water supply net / system
completed with all tanks, pumps and valves for
every above separate project.
References are Furnished Upon Request.

More Related Content

M.Salah cv1

  • 1. Mohamed Ahmed Salah Between two bridges Abu Dhabi - UAE Mobile: +971559486914 E-mail: ala799@hotmail.com ala799@gmail.com Ahmed.salahmohamed@dargroup.com Career Objective Seeking an intellectually challenging position within an international environment, whereby I can build upon my education, experience and interpersonal skills that would allow for further career development. Educational Background Bachelor in civil engineering- 2006 The High Technological Institute at 10th of Ramadan city, A.R.E. Career History Consultant Group International Company (UAE)- March 2007 till January 2012. Tittle : Site Structural Engineer Responsibilities Preparation of daily, weekly progress reports, attending the meetings with the contractors and follow up the actual site progress. Ensure that the selected material (Cement, reinforcement concrete, bituminous, plywood, gravels, sand etc.) are in accordance with the agreed specification, standards and as per the basic and engineering design stipulated in the Contract document. Follow up the project phases progress and updating the actual progress vs. planned schedule. Preparation the Bill of Quantity and Cost Estimate related to the projects. Checking & reviewing the concrete sample testing results which being received from Laboratory and to grant that the results are within the design acceptable limits. Carrying out numerous checks for the reinforcement steel bars size and type, in order to grant that the site construction material is implemented based on the agreed design calculations, engineering basis & standards. Ensure that the engineering specifications, standards and procedures are compliance / implemented on all Phases of Projects. Reviewing the project scope of work, drawings, specifications, material submittals and other technical documents related to the projects. Carrying out the required in-house civil design and detailed engineering works, including the structural analysis / modeling, reinforced concrete design, preparation of drawings, provision of technical / standard details, etc. Supervising the project site construction phases to be sure that the project construction is being implemented as per the planned schedule and agreed scope of work. Reviewing any design changes may be requested by the owner, preparation the design change request and preparation, brief scope of work, detailed engineering, etc. Reviewing the prepared punch list. Following up the pre-commissioning & commissioning completion stages with all concerned parties. Piling Site Works (related to the implemented project as indicated in the attached project list). Reviewing the piling access and check the steel bars size & type. Attend the site piling installation to ensure that the excavation piles reach to the acceptable design depth. Checking the piling concrete samples to grant that the results are within the acceptable limits. Attend, check & supervise the required piling static load and integrity tests.
  • 2. Personal Skills - High learning ability & organized thinking. - Self-motivated, organized and detail oriented; attention to details and quality of work. - Ability to work under pressure and tight deadlines. - Flexible team player. Computer Skills - Excellent command of Windows, Word, Excel & Power Point. - AutoCAD (2D). - Proficient user of Internet facilities. - Primavera project planner (p3). Language Skills - Arabic : Native - English : Very good (Written & Spoken) Personal Data - Date of Birth : january 1, 1981 - Born : Arab Republic of Egypt - Nationality : Egyptian - Marital Status : Married - Military Status : Exempted The following table shown the projects which finalized / are being constructed in Abu Dhabi. NO OWNER PROJECT DETAIL STATUS 1 ABDULL ABD ALL AL HAMIDAN VILLAS This project consisted of Three (3) Villas each, one have two floors and one roof. finish all 2 ABU DHABI NATIONALITIES AND RESIDENCE DEPARTMENT project was consisted of the following:- a]printing and services building (two levels). b] New additional level to the existing club. c] Changing the existing internal design to new design for the visa building. D]new commercial building consists of two levels finish all 3 HAMZA AL GOHY VILLA This project consisted of one villa, ground floor, 1st level and roof. finish all 4 INDUSTRIAL SHABRA BUILDING (Owner This building consisted of two floors each, one divided to specific offices. finish all 5 MAJOR /SAEED OBAID AL MAZROU VILLA This project consists of one villa, and site / external meeting hall & external kitchen. Such villa consisted of ground floor 1st floor & roof. finish all 6 RASHID AL ZAABI VILLAS Four (4) villas, each one consists of ground floor, 1st floor and roof . finish all 7 INDUSTRIAL SHABRA PROJECT (Owner: Mr. Mattar Al Rumaithy) This building consists of two floors each, one divided to specific offices. finish all 8 MR. AHMED OBAID AL MAZROOE VILLA This villa consists of ground floor and 1st floor levels. finish all 9 MRS. MYTHAA & MARIAM VILLAS This project consisted of two villas, one for Mrs. Mythaa and the other for Mrs. Mariam. Each villa consisted of ground, 1st and roof level. finish all 10 MR. SULTAN AL ZAABI COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 11 MR. HAMEED AL ZAABI This project consisted of six villas, Each villa finish all
  • 3. COMPOUND consists of ground, 1st and roof level. 12 MR. OMAR AL ZAABI COMPOUND This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 13 MR. ABDULA AL ZAHERY COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 14 MR. SLAYAM EL KESARY COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 15 MR. BEKHET EL KESERY COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 16 MRS.HAMDA ABD EL RAHMAN EL ZAABI This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 17 MRS.SHKHA ABD EL RAHMAN EL ZAABI This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 18 MRS.ALIAA EL SOWEDY This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 19 MR. AHMED OBAID AL MAZROOE 8 VILLA This project consisted of eight villas, Each villa consists of ground, 1st and roof level. finish all 20 MR.KHALIFA EL KINDI This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 21 MRS.SHAMSA MOHAMED This project consisted of one villas, Each villa consists of ground, 1st and roof level. finish all 22 MR. AHMED OBAID AL MAZROOE BUILDING This project consisted of one building of seven typical floors and roof finish all 23 Mr.abu salem This project consisted of extension for the main villa + service block finish all 24 Mr.Mohamed ateq This project consisted of four villas, Each villa consists of ground, 1st and roof level.+four service block finish all 25 Mr.obaid ateq This project consisted of four villas, Each villa consists of ground, 1st and roof level.+four service block finish all 26 EXECUTION PLAN FOR THE DRAINAGE AND WATER SUPPLY NET FOR ALL THE ABOVE PROJECT Preparation of the detailed drawings, basic design required for all above projects, indicating B.O.Q., cost estimate, routine of the drainage & water supply net / system completed with all tanks, pumps and valves for every above separate project. References are Furnished Upon Request.