The document outlines several positions held by an individual working in mining and construction projects in Indonesia and Singapore between January 2009 and March 2010. Specifically, it mentions roles as a pipe fitter at a gold mining project in Manado, Indonesia in 2010, working on a water tank hydro test area in Batam, Indonesia in 2009, and working on a cyclone area of a gold processing system in Manado, Indonesia in February 2010. It also briefly references projects for Exxon Mobile in Singapore and Global International Asia Pacific.
1 of 7
Download to read offline
More Related Content
My Best Project
1. Toka Tindung
Gold Mining Project
Location : Manado - Indonesia
Period of Service January 2010 up to March 2010
Last Position as Pipe Fitter Craftman
2. On the Besides of Water Tank Hydro Test Area
Mc Connell Dowell Services
Batam - Indonesia
Period of Services January 2009
3. Toka Tindung Gold Mining Project
Manado – Indonesia
Period of Service February 2010
On the Cyclone Area
Gold Processing Systems
Background is Dua Bersaudara Mount.
It is very beautiful scene
4. Processing of transferring Gold Crush Materials to Tunnel
then going to Ball Mill
Gold Grid Conveyor Base from
Crusher Area