N-14673.2 MIRFA-C ADDITIONAL PUMPS GROUP TO SUPPLY DN1200 CS PIPELINE TO MADINAT ZAYED
1
1
Site Location
N-14673.2 MIRFA-C ADDITIONAL PUMPS GROUP TO SUPPLY DN1200 CS PIPELINE TO MADINAT ZAYED
2
2
Mirfa Pumping Station Extension – Installation of 2 New
Pumps, total capacity of 34 MIGD / head of 241m with 33 kV
Switchgear Building, Electrical Control Building and associated
works including the following: .
• Interface with IWPP – New Twin DN1400 CS pipeline to
interface with new storage tanks within IWPP.
• Power Requirements – New 33kV Substation and associated
equipment to supply power for the 2 New Pump Sets
• SCADA Integration – Integration of New Control System with
existing SCADA system.
Scope of work
Project Start Date: 11-11-2018
Expected Completion Date 31-07-2023
N-14673.2 MIRFA-C ADDITIONAL PUMPS GROUP TO SUPPLY DN1200 CS PIPELINE TO MADINAT ZAYED
3
3
EPH
ECB
IVC 01
WO 02
IVC 02

More Related Content

N-14673.2 mirfa location 03.pptx

  • 1. N-14673.2 MIRFA-C ADDITIONAL PUMPS GROUP TO SUPPLY DN1200 CS PIPELINE TO MADINAT ZAYED 1 1 Site Location
  • 2. N-14673.2 MIRFA-C ADDITIONAL PUMPS GROUP TO SUPPLY DN1200 CS PIPELINE TO MADINAT ZAYED 2 2 Mirfa Pumping Station Extension – Installation of 2 New Pumps, total capacity of 34 MIGD / head of 241m with 33 kV Switchgear Building, Electrical Control Building and associated works including the following: . • Interface with IWPP – New Twin DN1400 CS pipeline to interface with new storage tanks within IWPP. • Power Requirements – New 33kV Substation and associated equipment to supply power for the 2 New Pump Sets • SCADA Integration – Integration of New Control System with existing SCADA system. Scope of work Project Start Date: 11-11-2018 Expected Completion Date 31-07-2023
  • 3. N-14673.2 MIRFA-C ADDITIONAL PUMPS GROUP TO SUPPLY DN1200 CS PIPELINE TO MADINAT ZAYED 3 3 EPH ECB IVC 01 WO 02 IVC 02