Perhitungan proteksi terhadap korosi (AA)
INPUT:

                         Data Contoh Proteksi Katodik dengan Anoda Korban

No.                                Konstruksi:                            Misalnya sebuah Ponton
 1    Panjang (m)                                                                   69.6
 2    Lebar (m)                                                                      11
 3    Tinggi bagian yang terendam (m)                                                 5
 4    Tinggi bagian yang terpercik (m)                                               1.5

No.                            Lingkungan:
 1 Tahanan jenis (ohm cm), air laut                                                25

No.                               Jenis Anoda:                         Zn
 1    Kapasitas (A.jam /kg)                                           780
 2    Effisiensi (%)                                                   95
 3    Faktor utilitas (%)                                              85
 4    Panjang anoda (cm)                                              38.1
 5    Diameter anoda (cm)                                             32.4
 6    Lebar anoda (cm)                                                  -
 7    Tebal anoda (cm)                                                  -
 8    Berat setiap anoda (kg)                                        177.06



                                          OUTPUT:
No.                                PERHITUNGAN
 1 Luas permukaan yang akan diproteksi
    Luas daerah terpercik (m^2)                                                    241.8
    Luas daerah terendam (m^2)                                                    1571.6

 2    Data Kebutuhan Arus Proteksi (mA/m^2)                          377
      Cat yang akan diterapkan jenis ;heavy duty'                    10

 3    Asumsi
      Kerusakan cat pada saat pemasangan (%)                         10
      Degradasi cat (%/tahun)                                        1

 4    Perhitungan Kebutuhan Arus Proteksi
      Untuk daerah terpercik (A)                                                    11.3
      Untuk daerah terendam (A)                                                     73.4

 5    Rencana waktu Proteksi (tahun):                                20
      maka,
      Kebutuhan arus proteksi pada akhir tahun
      Untuk daerah terpercik (A)                                                    29.0
      Untuk daerah terendam (A)                                                    188.7

 6    Kebutuhan arus rata-rata selama rencana waktu proteksi yaitu   20
      tahun, adalah
      Untuk daerah terpercik (A)                                                    20.2
      Untuk daerah terendam (A)                                                    131.1
      Kebutuhan total arus proteksi rata-rata (A)                                  151.2

 7    Berat Anoda yang dibutuhkan
      Untuk daerah terpercik (kg)                                                 2804.7
Untuk daerah terendam (kg)                                                   36459.0
    Kebutuhan total anoda (kg)                                                   39263.7

8   Jumlah Anoda (buah):                                                           221.8

9   Pemasangan:
                                                   Anoda dipasang sebagai 8
                                          string, masing-masing terdiri dari 2
                     anoda vertikal paralel, sehingga jarak antar string (m):       20.2

10 Tahanan Anoda
   Luas penampang anoda (cm^2)
   Diameter effektif anoda (cm)
   maka tahanan anoda (ohm)

11 Output Arus dari Anoda (A)
   Output arus satu anoda (A)
   Output total arus anoda (A)

12 Check:
   Output total arus anoda > Kebutuhan total arus proteksi rata-rata

13 Kesimpulan:
   Kebutuhan total arus proteksi rata-rata (A)
   Output total arus anoda (A)
   Rencana waktu Proteksi (tahun)
   Jumlah Anoda (buah)
   Jumlah string anoda
   Jumlah anoda setiap string (buah)
   Jarak antar string (m)
Korban

       Misalnya sebuah Ponton
                 69.6
                  11
                   5
                 1.5


                25

                Al      Others
              2700
                90
                60
               120
                 -
                6
                6
              11.8




                241.8
               1571.6

  377
  10


  10
  1


                 11.3
                 73.4

  20


                 29.0
                188.7

  20

                 20.2
                131.1
                151.2


               2804.7
36459.0
    39263.7

      221.8   ------->   222   buah


8
2
       20.2


      824.1
       25.1
       0.02


       15.7
     3487.1


     OK


     151.2
    3487.1
       20
      222
       8
       2
     20.2
Perhitungan proteksi terhadap korosi (AA)
Perhitungan proteksi terhadap korosi (AA)
INPUT:

             Data Contoh Proteksi Katodik dengan Arus Tanding

No.                        Konstruksi:                       Misalnya Pipeline
 1    Diameter, D (mm)                                             711.2
 2    Tebal, t (mm)                                                 12.7
 3    Panjang, L (km)                                                17
 4    Tahanan jenis, pp (ohm m)                                       0

No.                    Lingkungan:
 1 Tahanan jenis, pe (ohm m), tanah                                 30

No.                    Coating:
 1 Konduktan, w (ohm m^2)                                          2000




                                   OUTPUT:

No.                                PERHITUNGAN
 1 Kriteria desain
    Minimum potensial shif (volt):                       -0.5
    Umur desain (tahun):                                 20

 2    Tahanan pipa, r (ohm/m)                                        0.0000072
 3    Kebocoran konduktan coating, g (S/m)                             0.001117
 4    Konstanta atenuasi, #                                           0.000090
 5    Tahanan karakeristik pipa, rp (ohm)                                  0.080
 6    Pergeseran potensial pipa di drainage, Eo (volt)                       -1.2
 7    Kebutuhan arus proteksi, Io (A)                                       13.6
 8    Check
      Eo lebih kecil sama dengan:                        -0.5            OK
      dan Eo lebih besar sama dengan:                    -1.5            OK

 9    Output arus DC minimum, Im
      Sf1                                                1.25
      Lebih besar sama dengan:                                                 17.0
      dan juga harus lebih besar sama dengan:            21.44
      sehingga ditentukan Im (A) sebesar:                25

10    Anoda
      Jenis                                              Fe-Si
      Laju Konsumsi (kg/A.year)                          4.6
      Effisiensi (%)                                     70
      Faktor utilitas (%)                                80
      Panjang anoda (cm)                                 30
      Diameter anoda (cm)                                10
      Berat setiap anoda(kg)                             20
      Berat total kebutuhan anoda (kg)                                    2875.0

11    Jumlah anoda, n (buah)                                                  215.6
12    Tahanan anoda, Rh (ohm)                                                 15.76
13    Faktor nterferensi, F
      Jarak antar anoda (m):                             5
      maka, F sebesar:                                                          1.6
14   Tahanan grounbed, Rn (ohm)                               0.12
15   Tegangan DC yang diperlukan, Vo
     Sf2                                      1.5
     Rc (ohm)                                 0.2
     e (volt)                                 2.5
     maka, Vo (volt) sebesar:                                 11.9

16   Check
     Vr lebih besar sama dengan:              11.9
     dan Vr lebih kecilsama dengan:           60
     maka, ditentukan
     DC output rating, Vr (volt)                              35.9

17   Kesimpulan
     Kebutuhan arus proteksi, Io (A)                   13.6
     Output arus DC minimum, Im (A)                     25
     DC output rating, Vr (volt)                       35.9
     Tegangan DC yang diperlukan, Vo (volt)            11.9
     Anoda                                            Fe-Si
     Berat total kebutuhan anoda (kg)                2875.0
     Jumlah anoda, n (buah)                           215.6
Perhitungan proteksi terhadap korosi (AA)
Perhitungan proteksi terhadap korosi (AA)
INPUT:
   Data Contoh Proteksi Katodik dengan Coating

CONDITION
Area (m^2)                               1000
Volume Solid (%):
* Primer Coat                             60
* Intermediate Coat                      66.7
* Top Coat                                60
Dry Film Thickness, DFT (mikron):
* Primer Coat                            60
* Intermediate Coat                      100
* Top Coat                               30
Maximum Thinner (%)                      20
Loss Factor (%)                          50
Abrasive Consumption (kg/m^2)            50

COST
Paint (Rp/lt):
* Primer Coat                           80000
* Intermediate Coat                     80000
* Top Coat                             120000
Thinner (Rp/lt):
* Primer Coat                           20000
* Intermediate Coat                     20000
* Top Coat                              30000
Abrasive (Rp/kg):
*Sand                                    1000
Equipment (Rp/day):
* Blasting                             400000
* Coating                              300000
* PPE                                   50000
Manpower (Rp/day):                                 Total:
* Blaster                              100000        4
* Painter                              100000        1
* Helper                                50000        1
* Inspector                            400000        1
Miscellaneous (Rp/day):                              1
* Consumable                            50000

PROFIT (%)                                10

WORK SPEED (m^2/day)                      10



                                                                      OUTPUT:
                                                                    COST OF PROJECT
                                    Material Consumption
                                                            Unit
                                    (Paint+Thinner) Paint
Primer                                   200        160     litre
Intermediate                             300        240     litre
Top                                      100        80      litre
Abrasive       Unit
50 kg/m^2        50000          kg

               Equipment       Unit
Blasting          100          day
Coating           100          day
PPE               100          day

               Manpower        Unit
Blaster           4           person
Painter           1           person
Helper            1           person
Inspector         1           person

              Miscellaneous    Unit
Consumables        100         day
Profit             10           %
OUTPUT:
      PERHITUNGAN

          PRIMER

        TSR (m^2/lt)
             10
       WFT (mikron)
            120
  Consumption Factor, CF
              2
Practical consumption (litre)
            200



      INTERMEDIATE

        TSR (m^2/lt)
             7
       WFT (mikron)
            180
  Consumption Factor, CF
             2
Practical consumption (litre)
            300




            TOP

        TSR (m^2/lt)
             20
       WFT (mikron)
             60
  Consumption Factor, CF
              2
Practical consumption (litre)
            100




      OUTPUT:
  COST OF PROJECT


  Price of Paint (Rp/litre)     Thinner (litre)   Price of Thinner (Rp/litre)    Cost Total (Rp)

          80000                       40                    20000                       13,600,000
          80000                       60                    20000                       20,389,805
          120000                      20                    30000                       10,200,000
                                                                    Total (Rp)         44,189,805
(Rp/kg)
  1000                              50,000,000

  (Rp)
   40                                     4,000
   30                                     3,000
    5                                       500
              Total (Rp)                 7,500
(Rp/day)
 100000                              40,000,000
 100000                              10,000,000
 50000                                5,000,000
 400000                              40,000,000
                      Total (Rp)    95,000,000
   (Rp)
  50000                                5000000
194197305                             19419731
            TOTAL COST (Rp)        213,617,036
Perhitungan proteksi terhadap korosi (AA)
Perhitungan proteksi terhadap korosi (AA)
Perhitungan proteksi terhadap korosi (AA)

More Related Content

Perhitungan proteksi terhadap korosi (AA)

  • 1. ANODA KORBAN ARUS TANDING COATING INFORMASI LAIN 綻耽Abrianto Akuan
  • 3. INPUT: Data Contoh Proteksi Katodik dengan Anoda Korban No. Konstruksi: Misalnya sebuah Ponton 1 Panjang (m) 69.6 2 Lebar (m) 11 3 Tinggi bagian yang terendam (m) 5 4 Tinggi bagian yang terpercik (m) 1.5 No. Lingkungan: 1 Tahanan jenis (ohm cm), air laut 25 No. Jenis Anoda: Zn 1 Kapasitas (A.jam /kg) 780 2 Effisiensi (%) 95 3 Faktor utilitas (%) 85 4 Panjang anoda (cm) 38.1 5 Diameter anoda (cm) 32.4 6 Lebar anoda (cm) - 7 Tebal anoda (cm) - 8 Berat setiap anoda (kg) 177.06 OUTPUT: No. PERHITUNGAN 1 Luas permukaan yang akan diproteksi Luas daerah terpercik (m^2) 241.8 Luas daerah terendam (m^2) 1571.6 2 Data Kebutuhan Arus Proteksi (mA/m^2) 377 Cat yang akan diterapkan jenis ;heavy duty' 10 3 Asumsi Kerusakan cat pada saat pemasangan (%) 10 Degradasi cat (%/tahun) 1 4 Perhitungan Kebutuhan Arus Proteksi Untuk daerah terpercik (A) 11.3 Untuk daerah terendam (A) 73.4 5 Rencana waktu Proteksi (tahun): 20 maka, Kebutuhan arus proteksi pada akhir tahun Untuk daerah terpercik (A) 29.0 Untuk daerah terendam (A) 188.7 6 Kebutuhan arus rata-rata selama rencana waktu proteksi yaitu 20 tahun, adalah Untuk daerah terpercik (A) 20.2 Untuk daerah terendam (A) 131.1 Kebutuhan total arus proteksi rata-rata (A) 151.2 7 Berat Anoda yang dibutuhkan Untuk daerah terpercik (kg) 2804.7
  • 4. Untuk daerah terendam (kg) 36459.0 Kebutuhan total anoda (kg) 39263.7 8 Jumlah Anoda (buah): 221.8 9 Pemasangan: Anoda dipasang sebagai 8 string, masing-masing terdiri dari 2 anoda vertikal paralel, sehingga jarak antar string (m): 20.2 10 Tahanan Anoda Luas penampang anoda (cm^2) Diameter effektif anoda (cm) maka tahanan anoda (ohm) 11 Output Arus dari Anoda (A) Output arus satu anoda (A) Output total arus anoda (A) 12 Check: Output total arus anoda > Kebutuhan total arus proteksi rata-rata 13 Kesimpulan: Kebutuhan total arus proteksi rata-rata (A) Output total arus anoda (A) Rencana waktu Proteksi (tahun) Jumlah Anoda (buah) Jumlah string anoda Jumlah anoda setiap string (buah) Jarak antar string (m)
  • 5. Korban Misalnya sebuah Ponton 69.6 11 5 1.5 25 Al Others 2700 90 60 120 - 6 6 11.8 241.8 1571.6 377 10 10 1 11.3 73.4 20 29.0 188.7 20 20.2 131.1 151.2 2804.7
  • 6. 36459.0 39263.7 221.8 -------> 222 buah 8 2 20.2 824.1 25.1 0.02 15.7 3487.1 OK 151.2 3487.1 20 222 8 2 20.2
  • 9. INPUT: Data Contoh Proteksi Katodik dengan Arus Tanding No. Konstruksi: Misalnya Pipeline 1 Diameter, D (mm) 711.2 2 Tebal, t (mm) 12.7 3 Panjang, L (km) 17 4 Tahanan jenis, pp (ohm m) 0 No. Lingkungan: 1 Tahanan jenis, pe (ohm m), tanah 30 No. Coating: 1 Konduktan, w (ohm m^2) 2000 OUTPUT: No. PERHITUNGAN 1 Kriteria desain Minimum potensial shif (volt): -0.5 Umur desain (tahun): 20 2 Tahanan pipa, r (ohm/m) 0.0000072 3 Kebocoran konduktan coating, g (S/m) 0.001117 4 Konstanta atenuasi, # 0.000090 5 Tahanan karakeristik pipa, rp (ohm) 0.080 6 Pergeseran potensial pipa di drainage, Eo (volt) -1.2 7 Kebutuhan arus proteksi, Io (A) 13.6 8 Check Eo lebih kecil sama dengan: -0.5 OK dan Eo lebih besar sama dengan: -1.5 OK 9 Output arus DC minimum, Im Sf1 1.25 Lebih besar sama dengan: 17.0 dan juga harus lebih besar sama dengan: 21.44 sehingga ditentukan Im (A) sebesar: 25 10 Anoda Jenis Fe-Si Laju Konsumsi (kg/A.year) 4.6 Effisiensi (%) 70 Faktor utilitas (%) 80 Panjang anoda (cm) 30 Diameter anoda (cm) 10 Berat setiap anoda(kg) 20 Berat total kebutuhan anoda (kg) 2875.0 11 Jumlah anoda, n (buah) 215.6 12 Tahanan anoda, Rh (ohm) 15.76 13 Faktor nterferensi, F Jarak antar anoda (m): 5 maka, F sebesar: 1.6
  • 10. 14 Tahanan grounbed, Rn (ohm) 0.12 15 Tegangan DC yang diperlukan, Vo Sf2 1.5 Rc (ohm) 0.2 e (volt) 2.5 maka, Vo (volt) sebesar: 11.9 16 Check Vr lebih besar sama dengan: 11.9 dan Vr lebih kecilsama dengan: 60 maka, ditentukan DC output rating, Vr (volt) 35.9 17 Kesimpulan Kebutuhan arus proteksi, Io (A) 13.6 Output arus DC minimum, Im (A) 25 DC output rating, Vr (volt) 35.9 Tegangan DC yang diperlukan, Vo (volt) 11.9 Anoda Fe-Si Berat total kebutuhan anoda (kg) 2875.0 Jumlah anoda, n (buah) 215.6
  • 13. INPUT: Data Contoh Proteksi Katodik dengan Coating CONDITION Area (m^2) 1000 Volume Solid (%): * Primer Coat 60 * Intermediate Coat 66.7 * Top Coat 60 Dry Film Thickness, DFT (mikron): * Primer Coat 60 * Intermediate Coat 100 * Top Coat 30 Maximum Thinner (%) 20 Loss Factor (%) 50 Abrasive Consumption (kg/m^2) 50 COST Paint (Rp/lt): * Primer Coat 80000 * Intermediate Coat 80000 * Top Coat 120000 Thinner (Rp/lt): * Primer Coat 20000 * Intermediate Coat 20000 * Top Coat 30000 Abrasive (Rp/kg): *Sand 1000 Equipment (Rp/day): * Blasting 400000 * Coating 300000 * PPE 50000 Manpower (Rp/day): Total: * Blaster 100000 4 * Painter 100000 1 * Helper 50000 1 * Inspector 400000 1 Miscellaneous (Rp/day): 1 * Consumable 50000 PROFIT (%) 10 WORK SPEED (m^2/day) 10 OUTPUT: COST OF PROJECT Material Consumption Unit (Paint+Thinner) Paint Primer 200 160 litre Intermediate 300 240 litre Top 100 80 litre
  • 14. Abrasive Unit 50 kg/m^2 50000 kg Equipment Unit Blasting 100 day Coating 100 day PPE 100 day Manpower Unit Blaster 4 person Painter 1 person Helper 1 person Inspector 1 person Miscellaneous Unit Consumables 100 day Profit 10 %
  • 15. OUTPUT: PERHITUNGAN PRIMER TSR (m^2/lt) 10 WFT (mikron) 120 Consumption Factor, CF 2 Practical consumption (litre) 200 INTERMEDIATE TSR (m^2/lt) 7 WFT (mikron) 180 Consumption Factor, CF 2 Practical consumption (litre) 300 TOP TSR (m^2/lt) 20 WFT (mikron) 60 Consumption Factor, CF 2 Practical consumption (litre) 100 OUTPUT: COST OF PROJECT Price of Paint (Rp/litre) Thinner (litre) Price of Thinner (Rp/litre) Cost Total (Rp) 80000 40 20000 13,600,000 80000 60 20000 20,389,805 120000 20 30000 10,200,000 Total (Rp) 44,189,805
  • 16. (Rp/kg) 1000 50,000,000 (Rp) 40 4,000 30 3,000 5 500 Total (Rp) 7,500 (Rp/day) 100000 40,000,000 100000 10,000,000 50000 5,000,000 400000 40,000,000 Total (Rp) 95,000,000 (Rp) 50000 5000000 194197305 19419731 TOTAL COST (Rp) 213,617,036