PEDESTRIAN BRIDGE CONNECTING CIVIL
SECRETARIAT TO BRT STATION
CIVIL SECRETARIAT PESHAWAR
 Accessibility to Civil Secretariat is from two main Roads N-5 and
Saddar Road
 No public transport is serving these two roads.
 An estimated amount of 6 thousand employees work in Civil
Secretariat
 Total of 3500 to 4000 employees are using public transport
 Presently 500 employees using BRT
 Growth in daily BRT commuters is expected to create increase
demand for pedestrian bridges from many places on the corridor to
serve more people and to increase the rider ship.
BRT ROUTE
Cantt Area
Civil Secretariat
Pedestrian/Cycle/Motor
cycle
Vehicle Entrance
Pedestrian
Vehicle Entrance
Entrances to
Secretariat
steel truss
STEEL
 Prefabricated pedestrian steel
truss bridges are the most
commonly used throughout the
world, due to their easy and
reliable construction techniques.
 In BRT all the pedestrian bridges
are of steel
TYPES OF BRIDGES
CONCRETE
 Strong structure
 Less maintenance Cost
 Multiple design options
TYPES OF BRIDGES
Considerations In Selecting the Station
 Distance
 Obstacles free corridor
 Easy and Fast Construction
 Security
 Better Integration in existing infrastructure
 Aesthetics
DESIGN CONSIDERATIONS
Parameter Minimum Maximum
Length 1500 2500
Width 80 150
South Elevation 207 257
North Elevation 250
Head Clearance* 00 11
Grade -5% 5%
Design Loads
Load Name Load Type Calculated Design Load Reference
Dead Load (DL) Gravity 60 psf -
Live Load (LL) Gravity 90 psf
AASHTO Pedestrian
Bridge Design Guide
Snow Load (SL) Gravity 30 psf ASCE 7
Earthquake Load (E) Lateral 2.8 kips ASCE 7 & USGS
PROPOSED ALLINGMENTS
OPTION #1
SECRNO CHOWK STATION
Central Jail
362 meters
211 meters
SECRNO CHOWK STATION
PROS
 Could serve Civil Secretariat and
judicial complex at a same time
CONS
 Obstacle free alignment not
available
 Privacy of private houses
compromises
 Right of Way is not available
 Over head bridge in ROW
OPTION #2
PARALLEL TO SHUBA BRIDGE
Built up Area
Built up Area
215 meter
PARALLEL TO SHUBA BRIDGE
PROS
 Shortest bridge span
CONS
 Bridge lands in front of Central
Jail which is security risk
 High rise building
 ROW is not enough
OPTION #3
SHUBA BAZAR STATION
BRT STATION
BRT STATION
Central Jail
Built up Area
225 Meters
SHUBA BAZAR STATION
PROS
 Directly initiates from the BRT
station
 Short Bridge span
CONS
 Obstacle free alignment not
available
 MPA hostel in ROW
 Central Jail
 High Cost
OPTION #4
SHUBA BAZAR STATION OVER CANAL
290 meter
Built up Area
SHUBA BAZAR STATION OVER CANAL
PROS
Obstacle free alignment
available
 Low cost
 Easy and Fast construction
CONS
 Has to pass through Gov
Buildings
Starting Point Existing Ground situation
Site Survey
Site Survey
Railway Crossing
EXISTING EXAMPLE
553 M
Already
existing
bridge
MAP OF EXISTING EXAMPLE
Existing Example
Connection to the existing Pedestrian
Bridge
3D Design