Power Technologies: organisation and operation of temporary power systems
Power Technologies¡¯ successful
experience in the organization and
operation of temporary power
systems at the Winter Olympic Games
in Sochi.
Power Technologies
would like to explain
the concept of
providing a temporary
power distribution
system for an event
such as the Olympic
Games.
The explanation of providing a
temporary power system relates
to additional electrical
requirements to ensure a secure
backup system to the normal
utility supply.
Additional temporary power requirements include
Temporary transformers, Electrical Generators,
temporary cabling, temporary purpose event electrical
distribution panels (plug and play style) and cable
management systems.
The purpose of a temporary electrical
installation is that it can be removed in total
enhancing sustainability and returning the
site to its original mode of operation.
The scale of the work in the Winter Games in Sochi
was huge and included 22 Olympic sporting
competition and non completion venues including 3
Olympic villages, 2 Main Media centers, Medals
Piazza; temporary Olympic park broadcast studios
and the Opening and Closing stadium.
In addition to total electrical temporary
overlay specifications, permanent or
legacy venues also require additional
electrical requirements such as
commentary positions, technology and
Commentary Control rooms as examples.
It should be noted that
all temporary electrical
installations adhere to
all local electrical
codes and is equal in
quality to the
permanent electrical
installations.
In early 2013 Power Technologies
was successful in securing the
Sochi 2014 Olympic and
Paralympic Games for coastal and
mountain clusters in the category
of sole Temporary Power provider.
This category consisted of
temporary 400 volt electrical
distribution systems and uniquely
10 KV high voltage distribution
systems.
Some aspects regarding the Sochi 2014
Olympic and Paralympic Games.
Design
Design of temporary 400 volt and
10kv systems approved and
accepted by the Organizing
Committee.
All design of the temporary
electrical systems, installation and
commissioning was all completed
within an extremely difficult and
short time scale.
All project related design work adhered to all
local codes and regulations including health
and safety, electrical codes, environmental
requirements and dbA sound levels.
Installation, Commissioning and Operation
All commissioning and testing was completed on
time and in accordance with all customer
requirements. This included the extensive work
and requirements of the two main media
centers and their complicated systems.
Opening and closing
Ceremonies was supplied
completely by Power
Technologies generator
sets running in prime as
opposed to back up to the
main utility system.
This is the usual mode of operation required
by the Opening and Closing production team.
Challenges included refueling and extensive
cable runs to the roof of the stadium.
Decommissioning
All equipment was successfully
removed on time and all venues
restored to pre Game conditions.
Equipment Statistics
- 73 substations installed
- 150 generators (120 MW of
installed temporary power)
- 800 km of temporary
electrical cable
- 2000 temporary power
electrical distribution panels
- Over 500 staff
The complete
experience is one that
Power Technologies
are very proud of
considering we had a
completely flawless
project delivery.
We want to assure that we intend to offer
the same level of quality and execution at
the highest standard.
Power Technologies: organisation and operation of temporary power systems

More Related Content

Similar to Power Technologies: organisation and operation of temporary power systems (20)

Safe_Efficient_Electricity_System_For_Healthcare_Facilities.pdf
Safe_Efficient_Electricity_System_For_Healthcare_Facilities.pdfSafe_Efficient_Electricity_System_For_Healthcare_Facilities.pdf
Safe_Efficient_Electricity_System_For_Healthcare_Facilities.pdf
benyu9214
?
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
Nithy Anantham
?
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
Krishnaprasad Keekan kamalaksha
?
Energy Storage: New Capabilities for the Electric Grid ¨C The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid ¨C The Tehachapi Energy...Energy Storage: New Capabilities for the Electric Grid ¨C The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid ¨C The Tehachapi Energy...
kevinfok
?
ahmed mohamed diaa_original
ahmed mohamed diaa_originalahmed mohamed diaa_original
ahmed mohamed diaa_original
AHMED DIAA
?
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
SolarReference
?
presentation (1)
presentation (1)presentation (1)
presentation (1)
Mahdi S. Atteia, P.Eng,PMP
?
Hussein CV 2015
Hussein CV 2015Hussein CV 2015
Hussein CV 2015
Hussein El Wakil
?
Techno Quest - Profile
Techno Quest -  ProfileTechno Quest -  Profile
Techno Quest - Profile
krunaldesai20
?
Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PVQuality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
Arpo Mukherjee
?
4330903.pdf
4330903.pdf4330903.pdf
4330903.pdf
shwetaprajapati6
?
Nec emergency requirements
Nec emergency requirementsNec emergency requirements
Nec emergency requirements
michaeljmack
?
Presentation ENG §à§ä 28 §Õ§Ö§Ü§Ñ§Ò§â§ñ 2010 §Ô§à§Õ§Ñ
Presentation ENG §à§ä 28 §Õ§Ö§Ü§Ñ§Ò§â§ñ 2010 §Ô§à§Õ§ÑPresentation ENG §à§ä 28 §Õ§Ö§Ü§Ñ§Ò§â§ñ 2010 §Ô§à§Õ§Ñ
Presentation ENG §à§ä 28 §Õ§Ö§Ü§Ñ§Ò§â§ñ 2010 §Ô§à§Õ§Ñ
Rivets
?
MAraziR-1 (1)
MAraziR-1 (1)MAraziR-1 (1)
MAraziR-1 (1)
M-M.Arazi Peng
?
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
MoturiVinodKumar
?
ahmed mohamed diaa C.V
ahmed mohamed diaa C.Vahmed mohamed diaa C.V
ahmed mohamed diaa C.V
AHMED DIAA
?
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)
Saher Jehad
?
PERSONAL INFORMATION
PERSONAL INFORMATIONPERSONAL INFORMATION
PERSONAL INFORMATION
Mohamed Farouk
?
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
Himmelstern
?
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
Pamela Bundros
?
Safe_Efficient_Electricity_System_For_Healthcare_Facilities.pdf
Safe_Efficient_Electricity_System_For_Healthcare_Facilities.pdfSafe_Efficient_Electricity_System_For_Healthcare_Facilities.pdf
Safe_Efficient_Electricity_System_For_Healthcare_Facilities.pdf
benyu9214
?
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
Nithy Anantham
?
Energy Storage: New Capabilities for the Electric Grid ¨C The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid ¨C The Tehachapi Energy...Energy Storage: New Capabilities for the Electric Grid ¨C The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid ¨C The Tehachapi Energy...
kevinfok
?
ahmed mohamed diaa_original
ahmed mohamed diaa_originalahmed mohamed diaa_original
ahmed mohamed diaa_original
AHMED DIAA
?
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
SolarReference
?
Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PVQuality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
Arpo Mukherjee
?
Nec emergency requirements
Nec emergency requirementsNec emergency requirements
Nec emergency requirements
michaeljmack
?
Presentation ENG §à§ä 28 §Õ§Ö§Ü§Ñ§Ò§â§ñ 2010 §Ô§à§Õ§Ñ
Presentation ENG §à§ä 28 §Õ§Ö§Ü§Ñ§Ò§â§ñ 2010 §Ô§à§Õ§ÑPresentation ENG §à§ä 28 §Õ§Ö§Ü§Ñ§Ò§â§ñ 2010 §Ô§à§Õ§Ñ
Presentation ENG §à§ä 28 §Õ§Ö§Ü§Ñ§Ò§â§ñ 2010 §Ô§à§Õ§Ñ
Rivets
?
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
MoturiVinodKumar
?
ahmed mohamed diaa C.V
ahmed mohamed diaa C.Vahmed mohamed diaa C.V
ahmed mohamed diaa C.V
AHMED DIAA
?
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
Himmelstern
?
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
Pamela Bundros
?

Recently uploaded (20)

Industrial Construction shed PEB MFG.pdf
Industrial Construction shed PEB MFG.pdfIndustrial Construction shed PEB MFG.pdf
Industrial Construction shed PEB MFG.pdf
PLINTH & ROOFS
?
04 MAINTENANCE OF CONCRETE PAVEMENTS.ppt
04  MAINTENANCE OF CONCRETE PAVEMENTS.ppt04  MAINTENANCE OF CONCRETE PAVEMENTS.ppt
04 MAINTENANCE OF CONCRETE PAVEMENTS.ppt
sreenath seenu
?
BS_EN_ISO_19650_Detailed_Presentation.pptx
BS_EN_ISO_19650_Detailed_Presentation.pptxBS_EN_ISO_19650_Detailed_Presentation.pptx
BS_EN_ISO_19650_Detailed_Presentation.pptx
VinkuMeena
?
autonomous vehicle project for engineering.pdf
autonomous vehicle project for engineering.pdfautonomous vehicle project for engineering.pdf
autonomous vehicle project for engineering.pdf
JyotiLohar6
?
Integration of Additive Manufacturing (AM) with IoT : A Smart Manufacturing A...
Integration of Additive Manufacturing (AM) with IoT : A Smart Manufacturing A...Integration of Additive Manufacturing (AM) with IoT : A Smart Manufacturing A...
Integration of Additive Manufacturing (AM) with IoT : A Smart Manufacturing A...
ASHISHDESAI85
?
Best KNow Hydrogen Fuel Production in the World The cost in USD kwh for H2
Best KNow  Hydrogen Fuel Production in the World The cost in USD kwh for H2Best KNow  Hydrogen Fuel Production in the World The cost in USD kwh for H2
Best KNow Hydrogen Fuel Production in the World The cost in USD kwh for H2
Daniel Donatelli
?
UNIT 1FUNDAMENTALS OF OPERATING SYSTEMS.pptx
UNIT 1FUNDAMENTALS OF OPERATING SYSTEMS.pptxUNIT 1FUNDAMENTALS OF OPERATING SYSTEMS.pptx
UNIT 1FUNDAMENTALS OF OPERATING SYSTEMS.pptx
KesavanT10
?
CS3451-OPERATING-SYSTEM NOTES ALL123.pdf
CS3451-OPERATING-SYSTEM NOTES ALL123.pdfCS3451-OPERATING-SYSTEM NOTES ALL123.pdf
CS3451-OPERATING-SYSTEM NOTES ALL123.pdf
PonniS7
?
Mathematics_behind_machine_learning_INT255.pptx
Mathematics_behind_machine_learning_INT255.pptxMathematics_behind_machine_learning_INT255.pptx
Mathematics_behind_machine_learning_INT255.pptx
ppkmurthy2006
?
Optimization of Cumulative Energy, Exergy Consumption and Environmental Life ...
Optimization of Cumulative Energy, Exergy Consumption and Environmental Life ...Optimization of Cumulative Energy, Exergy Consumption and Environmental Life ...
Optimization of Cumulative Energy, Exergy Consumption and Environmental Life ...
J. Agricultural Machinery
?
Frankfurt University of Applied Science urkunde
Frankfurt University of Applied Science urkundeFrankfurt University of Applied Science urkunde
Frankfurt University of Applied Science urkunde
Lisa Emerson
?
GM Meeting 070225 TO 130225 for 2024.pptx
GM Meeting 070225 TO 130225 for 2024.pptxGM Meeting 070225 TO 130225 for 2024.pptx
GM Meeting 070225 TO 130225 for 2024.pptx
crdslalcomumbai
?
only history of java.pptx real bihind the name java
only history of java.pptx real bihind the name javaonly history of java.pptx real bihind the name java
only history of java.pptx real bihind the name java
mushtaqsaliq9
?
Equipment for Gas Metal Arc Welding Process
Equipment for Gas Metal Arc Welding ProcessEquipment for Gas Metal Arc Welding Process
Equipment for Gas Metal Arc Welding Process
AhmadKamil87
?
US Patented ReGenX Generator, ReGen-X Quatum Motor EV Regenerative Accelerati...
US Patented ReGenX Generator, ReGen-X Quatum Motor EV Regenerative Accelerati...US Patented ReGenX Generator, ReGen-X Quatum Motor EV Regenerative Accelerati...
US Patented ReGenX Generator, ReGen-X Quatum Motor EV Regenerative Accelerati...
Thane Heins NOBEL PRIZE WINNING ENERGY RESEARCHER
?
Lessons learned when managing MySQL in the Cloud
Lessons learned when managing MySQL in the CloudLessons learned when managing MySQL in the Cloud
Lessons learned when managing MySQL in the Cloud
Igor Donchovski
?
Structural QA/QC Inspection in KRP 401600 | Copper Processing Plant-3 (MOF-3)...
Structural QA/QC Inspection in KRP 401600 | Copper Processing Plant-3 (MOF-3)...Structural QA/QC Inspection in KRP 401600 | Copper Processing Plant-3 (MOF-3)...
Structural QA/QC Inspection in KRP 401600 | Copper Processing Plant-3 (MOF-3)...
slayshadow705
?
decarbonization steel industry rev1.pptx
decarbonization steel industry rev1.pptxdecarbonization steel industry rev1.pptx
decarbonization steel industry rev1.pptx
gonzalezolabarriaped
?
Engineering at Lovely Professional University (LPU).pdf
Engineering at Lovely Professional University (LPU).pdfEngineering at Lovely Professional University (LPU).pdf
Engineering at Lovely Professional University (LPU).pdf
Sona
?
AI, Tariffs and Supply Chains in Knowledge Graphs
AI, Tariffs and Supply Chains in Knowledge GraphsAI, Tariffs and Supply Chains in Knowledge Graphs
AI, Tariffs and Supply Chains in Knowledge Graphs
Max De Marzi
?
Industrial Construction shed PEB MFG.pdf
Industrial Construction shed PEB MFG.pdfIndustrial Construction shed PEB MFG.pdf
Industrial Construction shed PEB MFG.pdf
PLINTH & ROOFS
?
04 MAINTENANCE OF CONCRETE PAVEMENTS.ppt
04  MAINTENANCE OF CONCRETE PAVEMENTS.ppt04  MAINTENANCE OF CONCRETE PAVEMENTS.ppt
04 MAINTENANCE OF CONCRETE PAVEMENTS.ppt
sreenath seenu
?
BS_EN_ISO_19650_Detailed_Presentation.pptx
BS_EN_ISO_19650_Detailed_Presentation.pptxBS_EN_ISO_19650_Detailed_Presentation.pptx
BS_EN_ISO_19650_Detailed_Presentation.pptx
VinkuMeena
?
autonomous vehicle project for engineering.pdf
autonomous vehicle project for engineering.pdfautonomous vehicle project for engineering.pdf
autonomous vehicle project for engineering.pdf
JyotiLohar6
?
Integration of Additive Manufacturing (AM) with IoT : A Smart Manufacturing A...
Integration of Additive Manufacturing (AM) with IoT : A Smart Manufacturing A...Integration of Additive Manufacturing (AM) with IoT : A Smart Manufacturing A...
Integration of Additive Manufacturing (AM) with IoT : A Smart Manufacturing A...
ASHISHDESAI85
?
Best KNow Hydrogen Fuel Production in the World The cost in USD kwh for H2
Best KNow  Hydrogen Fuel Production in the World The cost in USD kwh for H2Best KNow  Hydrogen Fuel Production in the World The cost in USD kwh for H2
Best KNow Hydrogen Fuel Production in the World The cost in USD kwh for H2
Daniel Donatelli
?
UNIT 1FUNDAMENTALS OF OPERATING SYSTEMS.pptx
UNIT 1FUNDAMENTALS OF OPERATING SYSTEMS.pptxUNIT 1FUNDAMENTALS OF OPERATING SYSTEMS.pptx
UNIT 1FUNDAMENTALS OF OPERATING SYSTEMS.pptx
KesavanT10
?
CS3451-OPERATING-SYSTEM NOTES ALL123.pdf
CS3451-OPERATING-SYSTEM NOTES ALL123.pdfCS3451-OPERATING-SYSTEM NOTES ALL123.pdf
CS3451-OPERATING-SYSTEM NOTES ALL123.pdf
PonniS7
?
Mathematics_behind_machine_learning_INT255.pptx
Mathematics_behind_machine_learning_INT255.pptxMathematics_behind_machine_learning_INT255.pptx
Mathematics_behind_machine_learning_INT255.pptx
ppkmurthy2006
?
Optimization of Cumulative Energy, Exergy Consumption and Environmental Life ...
Optimization of Cumulative Energy, Exergy Consumption and Environmental Life ...Optimization of Cumulative Energy, Exergy Consumption and Environmental Life ...
Optimization of Cumulative Energy, Exergy Consumption and Environmental Life ...
J. Agricultural Machinery
?
Frankfurt University of Applied Science urkunde
Frankfurt University of Applied Science urkundeFrankfurt University of Applied Science urkunde
Frankfurt University of Applied Science urkunde
Lisa Emerson
?
GM Meeting 070225 TO 130225 for 2024.pptx
GM Meeting 070225 TO 130225 for 2024.pptxGM Meeting 070225 TO 130225 for 2024.pptx
GM Meeting 070225 TO 130225 for 2024.pptx
crdslalcomumbai
?
only history of java.pptx real bihind the name java
only history of java.pptx real bihind the name javaonly history of java.pptx real bihind the name java
only history of java.pptx real bihind the name java
mushtaqsaliq9
?
Equipment for Gas Metal Arc Welding Process
Equipment for Gas Metal Arc Welding ProcessEquipment for Gas Metal Arc Welding Process
Equipment for Gas Metal Arc Welding Process
AhmadKamil87
?
Lessons learned when managing MySQL in the Cloud
Lessons learned when managing MySQL in the CloudLessons learned when managing MySQL in the Cloud
Lessons learned when managing MySQL in the Cloud
Igor Donchovski
?
Structural QA/QC Inspection in KRP 401600 | Copper Processing Plant-3 (MOF-3)...
Structural QA/QC Inspection in KRP 401600 | Copper Processing Plant-3 (MOF-3)...Structural QA/QC Inspection in KRP 401600 | Copper Processing Plant-3 (MOF-3)...
Structural QA/QC Inspection in KRP 401600 | Copper Processing Plant-3 (MOF-3)...
slayshadow705
?
decarbonization steel industry rev1.pptx
decarbonization steel industry rev1.pptxdecarbonization steel industry rev1.pptx
decarbonization steel industry rev1.pptx
gonzalezolabarriaped
?
Engineering at Lovely Professional University (LPU).pdf
Engineering at Lovely Professional University (LPU).pdfEngineering at Lovely Professional University (LPU).pdf
Engineering at Lovely Professional University (LPU).pdf
Sona
?
AI, Tariffs and Supply Chains in Knowledge Graphs
AI, Tariffs and Supply Chains in Knowledge GraphsAI, Tariffs and Supply Chains in Knowledge Graphs
AI, Tariffs and Supply Chains in Knowledge Graphs
Max De Marzi
?

Power Technologies: organisation and operation of temporary power systems

  • 2. Power Technologies¡¯ successful experience in the organization and operation of temporary power systems at the Winter Olympic Games in Sochi.
  • 3. Power Technologies would like to explain the concept of providing a temporary power distribution system for an event such as the Olympic Games.
  • 4. The explanation of providing a temporary power system relates to additional electrical requirements to ensure a secure backup system to the normal utility supply.
  • 5. Additional temporary power requirements include Temporary transformers, Electrical Generators, temporary cabling, temporary purpose event electrical distribution panels (plug and play style) and cable management systems.
  • 6. The purpose of a temporary electrical installation is that it can be removed in total enhancing sustainability and returning the site to its original mode of operation.
  • 7. The scale of the work in the Winter Games in Sochi was huge and included 22 Olympic sporting competition and non completion venues including 3 Olympic villages, 2 Main Media centers, Medals Piazza; temporary Olympic park broadcast studios and the Opening and Closing stadium.
  • 8. In addition to total electrical temporary overlay specifications, permanent or legacy venues also require additional electrical requirements such as commentary positions, technology and Commentary Control rooms as examples.
  • 9. It should be noted that all temporary electrical installations adhere to all local electrical codes and is equal in quality to the permanent electrical installations.
  • 10. In early 2013 Power Technologies was successful in securing the Sochi 2014 Olympic and Paralympic Games for coastal and mountain clusters in the category of sole Temporary Power provider. This category consisted of temporary 400 volt electrical distribution systems and uniquely 10 KV high voltage distribution systems.
  • 11. Some aspects regarding the Sochi 2014 Olympic and Paralympic Games.
  • 12. Design Design of temporary 400 volt and 10kv systems approved and accepted by the Organizing Committee. All design of the temporary electrical systems, installation and commissioning was all completed within an extremely difficult and short time scale.
  • 13. All project related design work adhered to all local codes and regulations including health and safety, electrical codes, environmental requirements and dbA sound levels.
  • 14. Installation, Commissioning and Operation All commissioning and testing was completed on time and in accordance with all customer requirements. This included the extensive work and requirements of the two main media centers and their complicated systems.
  • 15. Opening and closing Ceremonies was supplied completely by Power Technologies generator sets running in prime as opposed to back up to the main utility system.
  • 16. This is the usual mode of operation required by the Opening and Closing production team. Challenges included refueling and extensive cable runs to the roof of the stadium.
  • 17. Decommissioning All equipment was successfully removed on time and all venues restored to pre Game conditions.
  • 18. Equipment Statistics - 73 substations installed - 150 generators (120 MW of installed temporary power) - 800 km of temporary electrical cable - 2000 temporary power electrical distribution panels - Over 500 staff
  • 19. The complete experience is one that Power Technologies are very proud of considering we had a completely flawless project delivery.
  • 20. We want to assure that we intend to offer the same level of quality and execution at the highest standard.