This pre-installation checklist for a Haas machine model verifies that the foundation meets specifications, optional anchors are installed correctly if needed, and the machine location has been prepared according to the layout with a large enough entrance and lifting equipment. It also checks that the electrical supply voltage and wiring are correct, compressed air pressure and compressor meet requirements, and coolant type and concentration are appropriate.
1 of 1
Download to read offline
More Related Content
Pre install checklist
1. Haas Technical Publications
Pre-Installation Checklist
Model: Serial#: Delivery Date:
Specification Task Completed?
Foundation The Foundation meets the specifications.
Anchor
(Optional except DM/DT and EC-1600)
You have the anchors.
The cores are drilled.
The anchors are installed.
Machine/Optional Components Location You downloaded the Machine Layout Document.
The machine location is prepared.
The building entrance is large enough for the machine.
You have the equipment to lift or move the machine.
Electrical The input voltage supply is correct.
The correct wire size is installed.
The correct supply circuit breaker is installed.
Compressed Air The air pressure supply and pressure are correct.
The power output of the compressor is correct.
The compressor duty rating and capacity are correct.
Coolant The coolant type is correct.
The coolant concentration is correct.