Optimized Backward (Pull) Scheduling – Just In Time
精益化的EPC项目计划编制方法 – JIT
Engineering 开发工程
Delivery 物流交付
RFQ 采购报价
Shop Fabrication 车间制造
Construction 现场施工
Engineering 开发 Procurement 采购 Construction 施工
CRD
P.O.
ERD
JIT on CRD : 避免物资过早到达带来的现场库存及物料管理
JIT on P.O. : 避免过早的采购占用公司资金流
JIT on ERD : 避免仓促的开发任务导致的产物设计质量问题
Just In Time !
Just In Time !
Just In Time !
#5: BIM stand for building information modeling. It is a process it has been standardised in order to ease exhanges between different tenant according business process step.
#6: Many engineering and design institute are now fully working on enabling BIM modeling. But too often there is a misunderstanding on the BIM meaning . BIM doesn’t mean 3D. It means Building information modeling . It is a process which agregate all along the life cycle different types of informations , documents, 3D , non 3D informations. Those informations are growing accross the business process phase but the most important is that the informations can be reused or consume between 2 different business process steps to optimise quality concistency and speed of project delivery