The document is a production log that outlines the planning and filming process for a student music video project. It details scheduling workshops to learn the video equipment, assigning roles, selecting locations, filming test footage using a green screen, getting additional footage, and overcoming equipment issues to complete additional filming. Key events included a workshop on operating the Tri-caster, an initial filming session, and addressing needs for more footage through rescheduling and borrowing equipment.
2. Monday 26 th October 2009 In our 2 hour lesson we did feedback on our filming and realised we need more footage so we arranged to film on the following Saturday (31 st ) however due to the actors having responsibilities else where we had to re schedule the shooting to alternative date that suited everybody. Meanwhile we were working on our planning and research presentations. Thursday 19 th October 2009 Anisa had arranged with both actors to film in their free lessons. And that was on the Friday 20 th November at 8.30 am. However we came across a problem, as the media department didn’t have a Camcorder or the Tri pod available, we had to ask the drama department if we could use their camcorder and fortunately for us the agreed to lend us both the camera and tri pod. Friday 20 th November October 2009 - At 8.30am we collected the camcorder from the drama department and filmed some decent (useable) footage for the music video at the location of King Edwards park.