際際滷

際際滷Share a Scribd company logo
Sephardic Community Center-Brooklyn 400 Ton Yazaki Gas Chiller Plant provides chilled water for a Nautica  Dehumidification System using MSP Technology. Lilker Associates
Yazaki-Going on 20 Years! National Grid
Manhattan House 200 East 66 Yazaki 1,600 Tons Cosentini Associates
Clinton Green Manhattan Yazaki 300 Tons Laszlo Bodak Engineers
Bridge Harbor Heights Yazaki 260 Tons Rand Engineering
UCP OF NY HAS 9 YAZAKI CHILLERS Power Cooling
Parkwest High School-NYC Yazaki 160 Tons Ensign Engineering
Manhattan Ford Yazaki 400 Tons
Rubin Museum-NYC Yazaki 160 Tons Goldman Copeland Associates
East Wind Inn at Wading River, NY 300 Tons
New York Foundling Hospital
New York Foundling Hospital 300 Ton Chiller Plant Carrier Commercial Building Services
Con Edison Eastview Facility 170 Ton Chiller Plant
Con Edison Eastview Facility 5 Chillers for load distribution
Con Edison Eastview Facility 5 Chillers for redundancy Year round operation 24 hour facility
油
Hay Barn State Park Two 80 Ton Yazaki Chillers Emphasis on Green Design LEEDS Project Ward Associates
Lake Shore Residence Lake Ronkonkoma, NY
Lake Shore Residence 60 Ton Chiller
MANHATTAN PLAZA COGENERATION PLANT WITH 6 YAZAKI CHILLERS DSM Engineering
VIP COUNTRY CLUB NEW ROCHELLE, NY COGENERATION PLANT WITH 3 YAZAKI CHILLERS Advanced Power Systems
4C FOODS BROOKLYN, NY COGENERATION PLANT Energy Concepts
Ahava Food Corporation Cogeneration Plant
Ahava Food Corporation Cogeneration Plant  Freezer at -15F
Ahava Food Corporation Cogeneration Plant  Engine Room  1 MW
Ahava Food Corporation Cogeneration Plant  Chiller Plant  50 Tons
Integrated System Installations City Public Service  San Antonio, TX Renovation of old box-store retail space.  Transformed into a utility customer  service facility.  This  urban retro-fit project demonstrates state of the art building technology.
Integrated System Installations City Public Service  San Antonio, TX Photovoltaic array supplies power for electric car charging stations that are open to the public.  Battery night lighting, and DC fluid movers are also supported.
Integrated System Installations City Public Service  San Antonio, TX Solar-thermal array supplies hot water to 20RT of Yazaki single-effect chillers.  Two 100 RT Gas-fired Yazaki chiller-heaters also serve this facility.
Integrated System Installations City Public Service  San Antonio, TX Chilling plant driven by methane-fired boilers awaiting delivery of generators.  Flexible system allowed owner to occupy building in shorter time.
Integrated System Installations Inland Empire Municipal Utility Waste water treatment plant captures methane that is used to fuel onsite power generation.  Waste heat drives 4 Yazaki WFC-SH30 Modules producing over 150 RT of HVAC capacity.
Integrated System Installations Inland Empire Municipal Utility Yazaki WFC-SH30 showing fluid circuit piping.
YAZAKI No Power  No Problem Contact : Steven Cohen Voice:  631-445-9117 www.yazakienergy.com    30 to 200 Tons Cooling Capacity Enjoy natural gas energy savings    Down size electric generators    Modular design    Outdoor enclosure    30 Minute changeover to heating    Small footprint saves space    Environmentally friendly (LiBr & Water)    Low sound < 65 db    Fully assembled and charged    Remote monitoring Available in Hot Water Fired Modules Co-Generation applications    Local factory service Go Yazaki Energy!

More Related Content

Projects