際際滷

際際滷Share a Scribd company logo
PROJECTS INDEX
May 2013 ~ today
JP Contractors Nig. Ltd
Project: The expansion of the MGBEE Road
The Projecttitle wasthe Expansionof the MGBEE road fromOrluto IdeatoSouthincludingthe anti-
erosionworks.The budgetof the Projectwas 2.602.414.000  (12.333.715,00)
My responsibilitywasthe organizationof the groupof labors& the machines, in orderto achieve the
maximumproductivity.
Brief ProjectDescription:
 Constructionof the drainage system(1mwidth&1m height) onboth sidesof the road
 Connectionof the drainage systemtothe river.
 Excavationof the extensionof the road(double sideexpansion)
 Backfillingwithlaterite.
 Constructionof the infrastructure of the road(30 cm of stone base)
 Constructionof the roaddemarcation
 Constructionof the asphaltlayer(5cmcompacted)
Project: Construction of underground intersections
The Projecttitle isthe The construction of the underground intersections along Owerri ~ Port-Harcourt
Federal National Highway.
The budgetof the Project is 1.000.000.000,00  (4.347.826,00)
The constructionmethodusedwasthe opentrenchmethod(CUT& COVER)
My responsibilitywasthe organizationof the subcontractors, the quantitysurveying,the implementationof
the Projectaccordingtothe Ministrysspecifications, the guidanceof the Companyslabor,the accomplishof
the constructiondeadline.
Brief ProjectDescription:
 Excavationof the tunnel &the wing-walls
 RC works
 Constructionof the drainage system onthe mainroad(Owerri ~Port-Harcourt)
 Constructionof the service roadsincludingthe drainage system
 Constructionof anti-floodsystem
 Backfillingwithlaterite.
 Constructionof the infrastructure of the service roads
 Constructionof the asphaltlayer(5cmcompacted)
Project: Renovation of Companys Estate buildings
Brief ProjectDescription:
Thisis an ongoingProjectconsideringthe renovationof 9houses. The targetisthe modification&the
transformationtoamixed(Nigerian European) modernstyle.
My responsibilitywasthe planningof the works,the organizationof the subcontractors, the quantity
surveying,&the guidance of the Companyslabor.
The Cost estimationof the Projectis90.000.000,00  (360.000,00 ).
The Projects deadline isonDecember2016.
Project: Asphalt Plant
The Companyowesanasphaltdrum mix plantboughtfrom the IndianCompany CapiousRoadtechPvt. Ltd
The model of the plantis the DM 60
The capacity of the plantis lower60tph & higher90tph.
My responsibilitywasthe planningof the infrastructure works,the montage of the plantselements&the
settingaccordingtothe Capiousinstructions,aslong as the runningof the installationandthe dailycost
control.
Total cost of Companysinvestment:100.000,00 $
December 2009 ~ May 2013(stuff)
Municipality of Pyrgos  Greece
 As Lead Engineer of Urban & Rural Road works, I was responsible of evaluating the citizens requests,
scheduling & monitoring the daily plan using the Municipalitys fleet of heavy machinery (1 loader, 1
Crawler Excavator, 6 JCB loader backhoes, 8 trucks, 2 graders )
 As Supervisor Engineer I was responsible for the onsite construction of the Public Projects financed by
the Municipality. My additional role was to monitor the implementation of the quality tests and the
inspection of the safety measures. I was also responsible for the Cost Control of the Projects & for the
compliance with the Time-Schedule.
Major Public Projects
1. Solid Waste Management Budget: 550.000
2. Erosion Control project at St. Georgios Budget: 203.000
3. Erosion control project at Skafidia Budget: 300.000
4. Restoration of the old hospital Manolopoulio
after the earthquakes on 1993 & 2008 Budget: 1.200.000
5. 2nd project of permanent Traffic interventions
at Pyrgos town. Budget: 320.000
6. Construction of the Skourochori  Skafidia
Intersection Budget: 114.000
7. Redevelopment of the old square at EleonasBudjet: 128.000
8. Construction of 5th Primary School access
Road Budjet: 250.000
9. Urban Ecology Reformation total Plan  Construction
of the 1st GreenWay Budjet: 900.000
PROJECTS index updated
 As site Engineer, I was charged of the construction of multiples urban road works executed by the
labors and the machinery of the Municipality of Pyrgos. The projects were supervised by the Technical
Department of the Municipality. The budget was ~ 750.000
July 2008 ~ December 2009 (contract)
Theodosis Constructions S.A.
Construction Engineer , Cost Engineer & Quantity Surveyor for Private Building Projects (turn key
luxurious houses & blocks of flats) & Public Projects (retaining walls  optical fiber- schools- churches
Public buildings - earthworks-infrastructure)
Site superintendent on frameworks & reinforced concrete works.
PROJECTS index updated
PROJECTS index updated
August 2005 ~ July 2008 (contract)
Egnatia Odos S.A.
The 1st Project subject was:
 the expansion of the old National road from Komotini to Alexandroupoli ,
Subsector Mesti~Makri (17Km)
 the expansion of the Motorway from Komotini to Alexandroupoli ,
Subsector Mesti  Makri (14.7 Km)
The Project budget was 21.000.000
The 2nd Project subject was:
 The construction of the slip resistance asphalt layer from New Karvali to Xrisoupoli (14.5 Km)
 >> >> >> of the Alexandroupolis Ring Road (20,5 Km)
 >> of the remaining asphalt works from New Karvali to Alexandroupolis
The Project budget was 24.000.000
My role, as a member of the supervising team, considering the field works, was the daily monitoring of the
executed earthworks & the concrete works (extensions of existing culverts & retaining walls), the monitoring of
the explosions, the inspection of the safety measures, the control of the infrastructure construction, the
implementation of the quality tests , the monitoring of the asphalt works & the control of the safety barrier
installation works.
Considering the office job, I was the Lead Quantity Surveyor with extra duties as Cost Controller assistant.
PROJECTS index updated
September 2004 ~ August 2005 (contract)
Ergodomiki S.A.
The Projectsubjectwasthe constructionof the concrete structure of:
 The main work-shopof KosmocarS.A.(2.200 m2 surface,2 floors+ 1 basement) at Elefsina
 The constructionof EUROBANK ERGASIAS S.A. mainoffice(4.300m2 surface,6 floors+ 4 basements+
treasury) inAthens
My salaryagreementwas1.800 monthly
My responsibilityassite Engineerwasthe dailyschedulingof the works(frameworks settingconcrete casting
 frameworksstriping),the guidance of the craftsmenandthe labors,the qualitytests,the monitoringof the
workprogress.
Consideringthe paperwork,Iwasincharge of the QuantitySurveillanceandthe verificationof the
subcontractorspayrolls.
PROJECTS index updated
December 2002 ~ September 2004 (staff)
Olympic Village 2004 S.A.
The Project subject was:
 The construction of the athletes houses in the Olympic Village for the Olympic Games of 2004 in
Athens
 The construction of the roads and the roads infrastructure inside the Olympic Village
 The construction of the connecting roads
The project Budget was 100.000.000
Additional projects:
 The construction of the athletic compound (1 football stadium, 2 indoor multipurpose gymnasiums, 1
swimming pool constructed according to the Olympic standards, 4 tennis playgrouns).
Budget: 4.500.000 
 The construction of the main Fire Station of Parnitha Mountain. Budget: 600.000
My responsibility as Site Engineer  Foreman, was to monitor the works progress, to ensure the safety & the
quality, and make sure that everything was executed according to the regulations and the instructions of the
Olympic Committee.
Considering the office work, my duty was the Quality and the Quantity surveillance.
Athletic
compound
Main Fire
Station
Olympic
village
PROJECTS index updated
PROJECTS index updated
September 2001 ~ September 2002 (contract)
ERGODRAGAGE S.A.
This is my first attempt to work abroad, so I came to an agreement with a Greek Contractor who was planning
to construct a quarry.
My responsibilities in Greece:
 I was responsible to choose the appropriate machinery, (1 crawler crane Hitachi of 40tn, 1 truck
Mercedes 2626, 1 vibrating screen).
 I was monitoring the construction of the screen, & the maintenance of the crane and the truck.
 I was trained to operate the crawler crane as drag-line
 I organized the custom-clearance, the shipping and the expedition.
My responsibilities in Chad
 I organized the custom clearance and the transport from Duala (the Cameroonian harbor) to
NDjamena.
 I assembled the vibrating screen and I trained the mechanic, the operators & the labors.
June 2000 ~ September 2001 (staff)
KLEARXOS ROUTSIS S.A.
Brief Project description:
 Silt dredging from the sea bottom
 Underwater drilling and placement of the explosives
 Underwater explosions
 Underwater excavations with clamshells and floating excavator
 Construction of the concrete blocks
 Construction of the underwater infrastructure
 Positioning of the blocks
 Construction of the upper structure
The budget of the Project was 16.727.806
My responsibility as naval Engineer was the daily measurement of the depth of the sea bottom, the scheduling
and the monitoring of the underwater blasts, the guidance of the clamshells and the floating excavator,, the
scheduling of the blocks positioning and the surveillance of the immersion.
PROJECTS index updated
March 1997~June 2000 (contract)
ELTER S.A.
The Project was the construction of natural gas pipe-line (PE) basic network of 4bars pressure, in the
sectors 16,17,18,21,22,68,71,73 & 83 of Attika
The budget of the Project was 5.282.465
My responsibilityasjuniorsite Engineerwasthe daily schedulingof the works(machines&labors),the
inspectionof the safetymeasures,the qualitytests&the monitoringof the pipe welders.
Consideringthe paperwork,Iwasincharge of the Quantity& CostSurveillance aswell asthe time-scheduling
usingPrimaverasoftware.
February 1995 ~ March 1997 (staff)
ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S.
I started working on 1995 at a reputed Contractor, specialized on water treatment plants, during my early years
as a student. I had the chance to work side by side with very experienced Engineers and that was the source of
my passion for the constructions.
Slowly from a shy office assistant I was transformed to a useful cadre and I took in charge the office support of
the working sites.
The support was:
 Correspondence with the authorities
 Control of the subcontractors payrolls
 Detailed construction drawings according to tech. specifications
Sincerely yours
Lambis Dimitrakopoulos
Civil & infrastructure Engineer
Projects certifications officially translated, available upon request
Additional documentary (Passport  BC degree - Yellow Cart e.c.t) available upon request

More Related Content

PROJECTS index updated

  • 1. PROJECTS INDEX May 2013 ~ today JP Contractors Nig. Ltd Project: The expansion of the MGBEE Road The Projecttitle wasthe Expansionof the MGBEE road fromOrluto IdeatoSouthincludingthe anti- erosionworks.The budgetof the Projectwas 2.602.414.000 (12.333.715,00) My responsibilitywasthe organizationof the groupof labors& the machines, in orderto achieve the maximumproductivity. Brief ProjectDescription: Constructionof the drainage system(1mwidth&1m height) onboth sidesof the road Connectionof the drainage systemtothe river. Excavationof the extensionof the road(double sideexpansion) Backfillingwithlaterite. Constructionof the infrastructure of the road(30 cm of stone base)
  • 2. Constructionof the roaddemarcation Constructionof the asphaltlayer(5cmcompacted)
  • 3. Project: Construction of underground intersections The Projecttitle isthe The construction of the underground intersections along Owerri ~ Port-Harcourt Federal National Highway. The budgetof the Project is 1.000.000.000,00 (4.347.826,00) The constructionmethodusedwasthe opentrenchmethod(CUT& COVER) My responsibilitywasthe organizationof the subcontractors, the quantitysurveying,the implementationof the Projectaccordingtothe Ministrysspecifications, the guidanceof the Companyslabor,the accomplishof the constructiondeadline. Brief ProjectDescription: Excavationof the tunnel &the wing-walls RC works Constructionof the drainage system onthe mainroad(Owerri ~Port-Harcourt) Constructionof the service roadsincludingthe drainage system Constructionof anti-floodsystem Backfillingwithlaterite. Constructionof the infrastructure of the service roads Constructionof the asphaltlayer(5cmcompacted)
  • 4. Project: Renovation of Companys Estate buildings
  • 5. Brief ProjectDescription: Thisis an ongoingProjectconsideringthe renovationof 9houses. The targetisthe modification&the transformationtoamixed(Nigerian European) modernstyle. My responsibilitywasthe planningof the works,the organizationof the subcontractors, the quantity surveying,&the guidance of the Companyslabor. The Cost estimationof the Projectis90.000.000,00 (360.000,00 ). The Projects deadline isonDecember2016. Project: Asphalt Plant The Companyowesanasphaltdrum mix plantboughtfrom the IndianCompany CapiousRoadtechPvt. Ltd The model of the plantis the DM 60 The capacity of the plantis lower60tph & higher90tph. My responsibilitywasthe planningof the infrastructure works,the montage of the plantselements&the settingaccordingtothe Capiousinstructions,aslong as the runningof the installationandthe dailycost control. Total cost of Companysinvestment:100.000,00 $
  • 6. December 2009 ~ May 2013(stuff) Municipality of Pyrgos Greece As Lead Engineer of Urban & Rural Road works, I was responsible of evaluating the citizens requests, scheduling & monitoring the daily plan using the Municipalitys fleet of heavy machinery (1 loader, 1 Crawler Excavator, 6 JCB loader backhoes, 8 trucks, 2 graders ) As Supervisor Engineer I was responsible for the onsite construction of the Public Projects financed by the Municipality. My additional role was to monitor the implementation of the quality tests and the inspection of the safety measures. I was also responsible for the Cost Control of the Projects & for the compliance with the Time-Schedule. Major Public Projects 1. Solid Waste Management Budget: 550.000 2. Erosion Control project at St. Georgios Budget: 203.000 3. Erosion control project at Skafidia Budget: 300.000 4. Restoration of the old hospital Manolopoulio after the earthquakes on 1993 & 2008 Budget: 1.200.000 5. 2nd project of permanent Traffic interventions at Pyrgos town. Budget: 320.000
  • 7. 6. Construction of the Skourochori Skafidia Intersection Budget: 114.000 7. Redevelopment of the old square at EleonasBudjet: 128.000 8. Construction of 5th Primary School access Road Budjet: 250.000 9. Urban Ecology Reformation total Plan Construction of the 1st GreenWay Budjet: 900.000
  • 9. As site Engineer, I was charged of the construction of multiples urban road works executed by the labors and the machinery of the Municipality of Pyrgos. The projects were supervised by the Technical Department of the Municipality. The budget was ~ 750.000
  • 10. July 2008 ~ December 2009 (contract) Theodosis Constructions S.A. Construction Engineer , Cost Engineer & Quantity Surveyor for Private Building Projects (turn key luxurious houses & blocks of flats) & Public Projects (retaining walls optical fiber- schools- churches Public buildings - earthworks-infrastructure) Site superintendent on frameworks & reinforced concrete works.
  • 13. August 2005 ~ July 2008 (contract) Egnatia Odos S.A. The 1st Project subject was: the expansion of the old National road from Komotini to Alexandroupoli , Subsector Mesti~Makri (17Km) the expansion of the Motorway from Komotini to Alexandroupoli , Subsector Mesti Makri (14.7 Km) The Project budget was 21.000.000 The 2nd Project subject was: The construction of the slip resistance asphalt layer from New Karvali to Xrisoupoli (14.5 Km) >> >> >> of the Alexandroupolis Ring Road (20,5 Km) >> of the remaining asphalt works from New Karvali to Alexandroupolis The Project budget was 24.000.000 My role, as a member of the supervising team, considering the field works, was the daily monitoring of the executed earthworks & the concrete works (extensions of existing culverts & retaining walls), the monitoring of the explosions, the inspection of the safety measures, the control of the infrastructure construction, the implementation of the quality tests , the monitoring of the asphalt works & the control of the safety barrier installation works. Considering the office job, I was the Lead Quantity Surveyor with extra duties as Cost Controller assistant.
  • 15. September 2004 ~ August 2005 (contract) Ergodomiki S.A. The Projectsubjectwasthe constructionof the concrete structure of: The main work-shopof KosmocarS.A.(2.200 m2 surface,2 floors+ 1 basement) at Elefsina The constructionof EUROBANK ERGASIAS S.A. mainoffice(4.300m2 surface,6 floors+ 4 basements+ treasury) inAthens My salaryagreementwas1.800 monthly My responsibilityassite Engineerwasthe dailyschedulingof the works(frameworks settingconcrete casting frameworksstriping),the guidance of the craftsmenandthe labors,the qualitytests,the monitoringof the workprogress. Consideringthe paperwork,Iwasincharge of the QuantitySurveillanceandthe verificationof the subcontractorspayrolls.
  • 17. December 2002 ~ September 2004 (staff) Olympic Village 2004 S.A. The Project subject was: The construction of the athletes houses in the Olympic Village for the Olympic Games of 2004 in Athens The construction of the roads and the roads infrastructure inside the Olympic Village The construction of the connecting roads The project Budget was 100.000.000 Additional projects: The construction of the athletic compound (1 football stadium, 2 indoor multipurpose gymnasiums, 1 swimming pool constructed according to the Olympic standards, 4 tennis playgrouns). Budget: 4.500.000 The construction of the main Fire Station of Parnitha Mountain. Budget: 600.000 My responsibility as Site Engineer Foreman, was to monitor the works progress, to ensure the safety & the quality, and make sure that everything was executed according to the regulations and the instructions of the Olympic Committee. Considering the office work, my duty was the Quality and the Quantity surveillance. Athletic compound Main Fire Station Olympic village
  • 20. September 2001 ~ September 2002 (contract) ERGODRAGAGE S.A. This is my first attempt to work abroad, so I came to an agreement with a Greek Contractor who was planning to construct a quarry. My responsibilities in Greece: I was responsible to choose the appropriate machinery, (1 crawler crane Hitachi of 40tn, 1 truck Mercedes 2626, 1 vibrating screen). I was monitoring the construction of the screen, & the maintenance of the crane and the truck. I was trained to operate the crawler crane as drag-line I organized the custom-clearance, the shipping and the expedition. My responsibilities in Chad I organized the custom clearance and the transport from Duala (the Cameroonian harbor) to NDjamena. I assembled the vibrating screen and I trained the mechanic, the operators & the labors.
  • 21. June 2000 ~ September 2001 (staff) KLEARXOS ROUTSIS S.A. Brief Project description: Silt dredging from the sea bottom Underwater drilling and placement of the explosives Underwater explosions Underwater excavations with clamshells and floating excavator Construction of the concrete blocks Construction of the underwater infrastructure Positioning of the blocks Construction of the upper structure The budget of the Project was 16.727.806 My responsibility as naval Engineer was the daily measurement of the depth of the sea bottom, the scheduling and the monitoring of the underwater blasts, the guidance of the clamshells and the floating excavator,, the scheduling of the blocks positioning and the surveillance of the immersion.
  • 23. March 1997~June 2000 (contract) ELTER S.A. The Project was the construction of natural gas pipe-line (PE) basic network of 4bars pressure, in the sectors 16,17,18,21,22,68,71,73 & 83 of Attika The budget of the Project was 5.282.465 My responsibilityasjuniorsite Engineerwasthe daily schedulingof the works(machines&labors),the inspectionof the safetymeasures,the qualitytests&the monitoringof the pipe welders. Consideringthe paperwork,Iwasincharge of the Quantity& CostSurveillance aswell asthe time-scheduling usingPrimaverasoftware.
  • 24. February 1995 ~ March 1997 (staff) ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S. I started working on 1995 at a reputed Contractor, specialized on water treatment plants, during my early years as a student. I had the chance to work side by side with very experienced Engineers and that was the source of my passion for the constructions. Slowly from a shy office assistant I was transformed to a useful cadre and I took in charge the office support of the working sites. The support was: Correspondence with the authorities Control of the subcontractors payrolls Detailed construction drawings according to tech. specifications Sincerely yours Lambis Dimitrakopoulos Civil & infrastructure Engineer Projects certifications officially translated, available upon request Additional documentary (Passport BC degree - Yellow Cart e.c.t) available upon request