Punjab intermediate Cities Improvement program   ADB
PUNJAB INTERMEDIATE CITIES IMPROVEMENT PROGRAM
PAKISTAN
Abid Hussainy
Urban Unit , Lahore
KEY MESSAGES
Planning Institutional
FinancialInfrastructure
 The program outcome will be improved quality
of urban services available to the residents of
the selected cities in Punjab. The key outputs
will be:
 Introduction of integrated urban planning
 Improved institutional framework for urban services at
the city level
 Strengthened business processes of urban utilities
 Improved urban infrastructure.

IMPACT, OUTCOME, AND OUTPUTS OF
PICIIP
S
No
City name Urban population
2013 (000)
1 Sialkot 3538
2 Chiniot 1193
3 Gujrat 2597
4 Sargodha 3291
5 Bahwalpur 3364
6 DG Khan 2326
7 Jhang 2373
8 Okara 2887
9 Sahiwal 2320
10 Rahim Yar
Khan
4396
11 Kasur 3137
12 Sheikhupura 3003

SCOPE OF PROGRAMME
Source
Amount ( $ in Millions) Share of Total
(%)
MFF Tranche
1
Tranche
2
Tranche
3
Tranche
4
Asian Development
Bank
OCR/ADF (loan)
350 80.0 90.0 90.0 90.0 70.0
Government 150 34.3 38.6 38.5 30.0 30.0
Total 500.0 114.3 128.6 128.5 128.6 100.0
It will finance:
Consulting services support of integrated urban planning, institutional reforms
including improvement of urban utilities business process and program
management.
Civil works and equipment of urban service infrastructure
Related social and safeguard activities.

FINANCIAL FLOWS
 Co-Financing
Korean Exim Bank
AFD
UCCRTF (investment grant)
 Counterpart financing
Provincial contribution
Cities contribution
 Project Design Advance (PDA)
Advanced ADB loan

FINANCIAL ARRANGEMENTS
The Technical Expertise to support the LG&CDD in
Project preparatory studies in applicant cities, design of
program and Env Safeguards and PFR and Tranches in
close coordination with concerned agencies .
 Moreover, the unit is working as a channel between
the applicant cities and ADB.
Strategic support to LG&CDD for program design and
PMU establishment at LG&CDD and Cities
.

THE PPROPSOED ROLE OF URBAN
UNIT
 With reference to Para 21 of ADBs Aid
memoir (after ADBs Mission), the Urban
Unit on the request of LG&CDD could
provide the required office space to consultant
team to ensure efficient day-to-day
collaboration of the consultants with GoPb
Agencies in transaction period if required
including key staff in cities and LG&CDD as
required
 Supporting Cities & LG&CDD for CDIA
Pre Feasibility and management of
International Consultants and PPTA
Sialkot and
Sahiwal Cities
have Submitted
their Application
of PPTA
through CDIA.

CDIA APPLICATION
 The Urban Unit provided Technical Assistance for:
 Application Preparation
 Situational Analysis & GIS Mapping
 Gap Finding
 Identification of Core Objectives for CDIA TA
 Budget Design
 Training

INPUTS FROM URBAN UNIT FOR CDIA
APPLICATION
SAHIWAL CITY
Punjab intermediate Cities Improvement program   ADB
Punjab intermediate Cities Improvement program   ADB
Punjab intermediate Cities Improvement program   ADB
Punjab intermediate Cities Improvement program   ADB
SIALKOT CITY
Punjab intermediate Cities Improvement program   ADB
Punjab intermediate Cities Improvement program   ADB
Punjab intermediate Cities Improvement program   ADB
Punjab intermediate Cities Improvement program   ADB
Proposed MOU B/W CDIA and
UU
 establish a collaborative cooperation
between CDIA and The Urban Unit
 a framework within which the Parties can
develop and undertake joint capacity
development activities to promote
cooperation and knowledge sharing in
Infrastructure Investment Prioritization and
Programming in Pakistan
 Work together to adapt, implement and
disseminate the CDIA CIIPP Tool,
materials and mechanisms that will
capacitate the Pakistani government
officials.
SCOPE of Studies
 The assignment will be undertaken in two
phases consisting of the development of
an integrated 5 Year Medium Term
Infrastructure Investment Plan (Phase 1)
and follow-on Pre-feasibility Studies (PFS)
for priority urban infrastructure
investments in a selected sector (s)
(Phase 2).
 It is anticipated that the outcome of Phase
1 MTIIP (recommendations on phased
investments and identification of priority
investments) will provide the focus and
framework for Phase 2 PFSs in each city.
The total duration of the assignment will
be 4 months with Phase 1 completed
between months 1 to 2, and Phase 2
completed between months 3 to 4
International
 Team Leader
 Water supply and Sewerage
 Urban Climate Change Expert
 SWM Expert
THANK YOU

More Related Content

Punjab intermediate Cities Improvement program ADB

  • 2. PUNJAB INTERMEDIATE CITIES IMPROVEMENT PROGRAM PAKISTAN Abid Hussainy Urban Unit , Lahore
  • 4. The program outcome will be improved quality of urban services available to the residents of the selected cities in Punjab. The key outputs will be: Introduction of integrated urban planning Improved institutional framework for urban services at the city level Strengthened business processes of urban utilities Improved urban infrastructure. IMPACT, OUTCOME, AND OUTPUTS OF PICIIP
  • 5. S No City name Urban population 2013 (000) 1 Sialkot 3538 2 Chiniot 1193 3 Gujrat 2597 4 Sargodha 3291 5 Bahwalpur 3364 6 DG Khan 2326 7 Jhang 2373 8 Okara 2887 9 Sahiwal 2320 10 Rahim Yar Khan 4396 11 Kasur 3137 12 Sheikhupura 3003 SCOPE OF PROGRAMME
  • 6. Source Amount ( $ in Millions) Share of Total (%) MFF Tranche 1 Tranche 2 Tranche 3 Tranche 4 Asian Development Bank OCR/ADF (loan) 350 80.0 90.0 90.0 90.0 70.0 Government 150 34.3 38.6 38.5 30.0 30.0 Total 500.0 114.3 128.6 128.5 128.6 100.0 It will finance: Consulting services support of integrated urban planning, institutional reforms including improvement of urban utilities business process and program management. Civil works and equipment of urban service infrastructure Related social and safeguard activities. FINANCIAL FLOWS
  • 7. Co-Financing Korean Exim Bank AFD UCCRTF (investment grant) Counterpart financing Provincial contribution Cities contribution Project Design Advance (PDA) Advanced ADB loan FINANCIAL ARRANGEMENTS
  • 8. The Technical Expertise to support the LG&CDD in Project preparatory studies in applicant cities, design of program and Env Safeguards and PFR and Tranches in close coordination with concerned agencies . Moreover, the unit is working as a channel between the applicant cities and ADB. Strategic support to LG&CDD for program design and PMU establishment at LG&CDD and Cities . THE PPROPSOED ROLE OF URBAN UNIT
  • 9. With reference to Para 21 of ADBs Aid memoir (after ADBs Mission), the Urban Unit on the request of LG&CDD could provide the required office space to consultant team to ensure efficient day-to-day collaboration of the consultants with GoPb Agencies in transaction period if required including key staff in cities and LG&CDD as required
  • 10. Supporting Cities & LG&CDD for CDIA Pre Feasibility and management of International Consultants and PPTA
  • 11. Sialkot and Sahiwal Cities have Submitted their Application of PPTA through CDIA. CDIA APPLICATION
  • 12. The Urban Unit provided Technical Assistance for: Application Preparation Situational Analysis & GIS Mapping Gap Finding Identification of Core Objectives for CDIA TA Budget Design Training INPUTS FROM URBAN UNIT FOR CDIA APPLICATION
  • 23. Proposed MOU B/W CDIA and UU establish a collaborative cooperation between CDIA and The Urban Unit a framework within which the Parties can develop and undertake joint capacity development activities to promote cooperation and knowledge sharing in Infrastructure Investment Prioritization and Programming in Pakistan
  • 24. Work together to adapt, implement and disseminate the CDIA CIIPP Tool, materials and mechanisms that will capacitate the Pakistani government officials.
  • 25. SCOPE of Studies The assignment will be undertaken in two phases consisting of the development of an integrated 5 Year Medium Term Infrastructure Investment Plan (Phase 1) and follow-on Pre-feasibility Studies (PFS) for priority urban infrastructure investments in a selected sector (s) (Phase 2).
  • 26. It is anticipated that the outcome of Phase 1 MTIIP (recommendations on phased investments and identification of priority investments) will provide the focus and framework for Phase 2 PFSs in each city. The total duration of the assignment will be 4 months with Phase 1 completed between months 1 to 2, and Phase 2 completed between months 3 to 4
  • 27. International Team Leader Water supply and Sewerage Urban Climate Change Expert SWM Expert