The weekly report summarizes the progress of the engineering team working on a water sensor flow project. The team tested the sensor by connecting it to a water pipe and measuring the output in liters per minute as water filled bottles. The results were in the range of 1-30 liters per minute depending on water strength. However, the test found the sensor results were not as expected, possibly because the cable joints were not tight enough and allowed water to leak out.
Convert to study guideBETA
Transform any presentation into a summarized study guide, highlighting the most important points and key insights.
1 of 2
Download to read offline
More Related Content
Reportprojectgo
1. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] Aprill 20, 2012
Name-
Mr.WirawitWangkan
Surname
Student
54261523
ID.
Group
IS Company
Name
Engineerin
g Team Jane,Best,Not,Su,Nut,Love,Tew,Mut,Benz and Chat
Members
Product
Design
Sa-tang,Ped,Fon,Tip,Earng,Mind
Team
Members
Weekly Progress
Explain your engineering job of each my project Water sensor flow but this power to the 5v
output plue back to Division 7.5. It turns out to be in the range 1-30 l / min depending on the
strength of the water.
The test measures the amount of water or a water pipe to the sensor and turn it into
a liter bottle of water with a number of them. The full water bottles, we know that thewater
coming out of a 2 liter bottle of a capacity. To compare with. Microsoft foundthat the
results are not expected to move much. The joints of the cable is not tight enough so the
water flows out.
Department of Control System and Instrumentation Engineering
KING MONGKUT¡¯s UNIVERSITY OF TECHNOLOGY THONBURI
2. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] Aprill 20, 2012
Engineering Analysis
Strong Point
Week Point
Next Week Job
Department of Control System and Instrumentation Engineering
KING MONGKUT¡¯s UNIVERSITY OF TECHNOLOGY THONBURI