RESUME
SHISHIR KUMAR JHA
Q. No- G/VI-8, Jharnadih, D.V.C Colony, Chandrapura, Bokaro, Jharkhand - 828403
Contact: 09430293921,08800231980
E-mail: shishircit@gmail.com
Date of Birth: 21st
Aug 1983
Nationality: Indian
Gender: Male
Total Experience: 07+ Years
Notice Period: 15 days
MECHANICAL ENGINEER- EPC PROJECTS
CONSTRUCTION & MAINTENANCE
Aspiring to work with a growing and reputed organization with over 7+ Years of
impressive experience in Construction, Maintenance & Execution Turnkey Projects of
power plant and Management of Maintenance operations with effective Technical &
Managerial Inputs across the power plant industry. Possess sound Knowledge of
Erection, Maintenance & Pre- Commissioning of Power Plant of ESP (Electrostatic
Precipitator), Boiler & Turbine of 15 MW to 210 MW.
PROFILE
EPC PROJECTS CONSTRUCTION & MAINTENANCE OF POWER PLANT PROJECTS
 7+ years experience in power Plant Project erection & fabrication of power
plant projects .
 Erection & Maintenance work of Electrostatic Precipitator (ESP).
 Structural Erection & Fabrication of ESP & Boiler.
 Erection, Maintenance & Fabrication work of Boiler & its Auxiliaries.
 Overhauling Of Steam Turbine.
 Overhauling of boiler & its Auxiliaries.
 Inspection and quality.
 Procurement and Material Management.
 Installation & Pre-Commissioning.
 Project Execution /management.
MAIN ACTIVITIES AND RESPONSIBILITIES
 In depth understanding and expertise in Planning, Resources Management, Monitoring
and documentation.
 Studying of order clauses & battery limits and coordinating with client/ customer,
Internal Engineering departments, Project sites and Vendors / Equipment suppliers.
 Coordinating and resolving Engineering issues address site requirement and ensure
timely supply of deliverables from Vendors.
 Assisting in procurement and inspection of engineering items, managing Interface
between different groups, Input requirement, sequencing and parallel activities.
 Responsible for Documenting and Drawing Control, Revision Control, Approval process,
Tracking of Vendor Documents, Ensuring latest revision availability etc.
 Maintaining all records necessary for documenting of various stages of a project such as
project development, tender reviews, internal strategy discussions, client meeting notes
etc for every project.
ORGANATION EXPERIENCE
 Working as FREELANCER IN SINCE September, 2015 TO TILL, as PROJECT ENGINEER
(MECHANICAL) for erection, maintenance fabrication, & pre-commissioning of ESP,
turbine and Boiler & their auxiliaries in power plant projects.
PROJECTS ACCOMPLISHED
Site:- 125 MW Re-Erection & Maintenance work of ESP in KLTPS Gujarat .
ROLE & RESPONSIBILITY
 Check and Maintain All Quality Measurement for ESP.
 Check Erection & Fabrication of Structure Part Of ESP.
 Check Erection, fabrication & Alignment of Collecting & Discharge Electrode of all Three
Field of ESP.
 Check Erection & Installation of Rapping System, TR Set & Rapping Motors of ESP.
 Successfully Done GD Test, Rapping Test & Air Load Test of ESP.
ORGANATION EXPERIENCE
12th
Aug13 to 31st
Aug15 CHEEMA BOILERS LTD, Mohali, Punjab as Project
Engineer.
PROJECTS ACCOMPLISHED
Site: - 20 MW Travelling Grate Boiler, Nawanshar power plant ltd Punjab.
Site: - 15 MW Travelling Grate Boiler, Kashyap Sweeteners Ltd. Madhya Pradesh.
Site: - 20 MW Travelling Grate Boiler, Sainsons Paper Industries Ltd. Haryana.
ROLE & RESPONSIBILITY
 Check and Maintain All Quality Measurement For Boiler Auxiliaries.
 Check Erection & Fabrication of Structure Part Of Boiler & ESP.
 Check Erection, fabrication & Alignment of Boiler Drum & Travelling Grate.
 Check Erection, Fabrication & Alignment of Air-preheater (APH), Pressure Parts & Flue
gas Ducting.
 Check Erection ,installation & Alignment of Boiler Feed pump ,ID & FD Fans
 Check Erection, fabrication & Alignment of Collecting & Discharge Electrode of all Three
Field of ESP.
 Check Erection, fabrication & Installation of Rapping System, TR Set & Rapping Motors
of ESP.
 Successfully Done GD Test ,Rapping Test & Air Load Test of ESP
ORGANATION EXPERIENCE
02nd
Aug10 to 07th
Aug13 SWATI ENERGY & PROJECTS (p). LTD, New Delhi, as
Project Engineer.
Site:- 75 MW & 70 MW Kutch Lignite Thermal power plant ,Gujarat.
 Erection, Fabrication & pre-Commissioning of Electro Static Precipitator (ESP) of 75 MW.
 Erection, Fabrication & Commissioning of Electro Static Precipitator (ESP) of 70 MW.
 Erection, Fabrication, Installation & Pre-Commissioning of APH capacity of 75
MW.
ROLE & RESPONSIBILITY
 Supervision of work along with the RAFAKO (POLAND) Experts.
 Check and Maintain All Quality Measurement of ESP.
 Check Erection & Alignment of Collecting & Discharge Electrode of all Five Field of ESP.
 Check Erection & Installation of Rapping System, TR Set & Rapping Motors of ESP.
 Check Erection & Alignment of Supporting Structure & Bottom Ash hopper of ESP.
 Successfully done GD test, rapping test & Air load test of ESP.
 Check Erection & installation of APH & their gear motor.
Site:- 210 MW Ukai Thermal Power Plant. Ukai, Gujarat.
 Capital Overhauling & Pre- commissioning of HP Turbine & Bearings of capacity of 210
MW LMZ Design of UTPS.
Site: - 210 MW Bhusawal Thermal Power Plant. Bhusawal, Maharashtra.
 Capital Overhauling & Pre- commissioning of Turbine of capacity of 210 MW LMZ
Design of BTPS.
Site: - 60 MW Birla copper plant, Dahej, Gujarat.
 Capital Overhauling & pre-Commissioning of Turbine of capacity of 60 MW LMZ Design
of Birla Copper, Dahej, Gujarat.
ROLE & RESPONSIBILITY
 Supervision of work along with the RUSSIAN Experts.
 Check and maintain all Quality, Measuring, Alignment & reading of Turbine.
 Check & Note Alignment Reading of Turbine Rotor, Bearing, Diaphragms Liner of HP
Turbine.
 Check Sand blasting of Diaphragms, Liner & Turbine Rotor.
 Check the Alignment of all Bearings.
 Check Seal Cutting, Tape checking & Swing check of rotor.
 Check the Centering of bottom diaphragms and Liner of HP turbine.
 Check parting plane matching of HP casing.
 Checking of Rotor Balancing of LP Turbine.
ORGANATION EXPERIENCE
01st
may08 to 25th
July 10 ASPIRE POWER PROJECTS (P).LTD, Ranchi,
Jharkhand as Engineer.
Site:- 15MW WHRB, Bengal Energy Ltd. Kharagpur ,West Bengal.
ROLE & RESPONSIBILITY
 Check and Maintain All Quality Measurement for Boiler and Auxiliaries.
 Check Fabrication, Erection & Alignment of 50 TPH Boiler structure.
 Check Fabrication, Erection & Alignment of APH & flue gas of ducting.
SITE & ROLE-
 Re-Erection & overhauling work of boiler pressure part and their auxiliaries of 140 MW
in CTPS, DVC, Jharkhand.
 Re-Erection & overhauling work of ESP of 125 MW in Jindal Power plant Jajpur, Orissa.
 Re-Erection work of boiler pressure part & their auxiliaries of 60 MW in BPSCL, Bokaro
Jharkhand.
EDUCATIONAL CREDENTIALS
 B.E. (Mechanical Engineering) with 70% marks from Cambridge Institute of
Technology, Ranchi University in 2006.
 12th
standard Passed with 47% marks from D.V.C+2 High School
Chandrapura, Bokaro, Jharkhand
 10th
standard Passed with 63% marks from D.V.C + High School
Chandrapura, Bokaro, Jharkhand.
COMPUTER PROFICIENCY
Windows XP, MSOffice, Power point, MS Project and Internet.
OTHER DETAILS
Fathers Name: Shri Rabindra Nath Jha
Mothers Name: Smt. Krishna Jha
Passport No: J8945514
Languages known: Hindi, English.
Interest: Playing Cricket & football, watching movies & news channel.
Shishir Kr Jha
Date
Shishir Kr Jha
Date
Ad

Recommended

DOCX
rakesh resume_10.03.2016
Rakesh Singh Bhadoriya
DOC
vijay resume QEC
vijaya kumar venugopal
DOC
CV of K F Karim, Operation Engineer
Kazi Ferdousul Karim
DOCX
Sanjeev mehrotra resume
sanjeev mehrotra
DOCX
SRIDHARAN.R RESUME
sridharan naidu
DOCX
Power plant desk operation engineer(Boiler, turbine, HVAC)
Sachin Pyasi
PDF
RESUME ELECTRICAL ENGINEER
AMIT BISWAS
DOC
TESTING AND COMMISSIONING ENGINEER
saravanan muthu
PDF
Karthik Resume
KARTHIK NATARAJAN
DOC
Engr,imran cv.cement.
M Imran Ali Khan Imran
DOCX
resume krishna electrical engineer
KRISHNAMOORTHY A
DOC
DVenkatesh Rotating Equip cv 2016
D Venkatesh
DOCX
Electrical and Instrumentation Engineer (Offshore/Onshore)
Kiran Y V N Rao
DOCX
Electrical Engineer C.V
Jujare Visvesvara Rao
DOC
Lokman's Resume-Rotating Equipment
Lokman Ali P.Eng.
DOC
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
MOHAMMED ASLAM SHAREEF
DOC
Instrument Supervisor CV
Athmanathan SwamiPrahadeeswaran
DOC
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem
DOC
Resume Nazrul Mazdi Mokhtar - Piping Designer
Nazrul Mokhtar
DOC
Resume electrical & instrumentation engg 10+ yrs exp
Sudipto Majumder
DOC
hari_new resume
hariseshukumar Tenali
PDF
NDT Resume
suresh ndt
DOC
SUDHEESH CV .
sudheesh karuvath
DOC
00-Mechanical Technician---
rohan contractor
RTF
Electrical Engineer Resume
Abdul Rahiman
DOCX
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
muhammad jamil
DOCX
Mechanical Technician
Rashid Minhas
DOCX
gopi chandra sahu, Resume
Gopi Chandra sahu
DOC
CV _Rizwan
Muhammad Rizwan Nazir
DOC
Surajit cv.doc
surajit das

More Related Content

What's hot (20)

PDF
Karthik Resume
KARTHIK NATARAJAN
DOC
Engr,imran cv.cement.
M Imran Ali Khan Imran
DOCX
resume krishna electrical engineer
KRISHNAMOORTHY A
DOC
DVenkatesh Rotating Equip cv 2016
D Venkatesh
DOCX
Electrical and Instrumentation Engineer (Offshore/Onshore)
Kiran Y V N Rao
DOCX
Electrical Engineer C.V
Jujare Visvesvara Rao
DOC
Lokman's Resume-Rotating Equipment
Lokman Ali P.Eng.
DOC
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
MOHAMMED ASLAM SHAREEF
DOC
Instrument Supervisor CV
Athmanathan SwamiPrahadeeswaran
DOC
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem
DOC
Resume Nazrul Mazdi Mokhtar - Piping Designer
Nazrul Mokhtar
DOC
Resume electrical & instrumentation engg 10+ yrs exp
Sudipto Majumder
DOC
hari_new resume
hariseshukumar Tenali
PDF
NDT Resume
suresh ndt
DOC
SUDHEESH CV .
sudheesh karuvath
DOC
00-Mechanical Technician---
rohan contractor
RTF
Electrical Engineer Resume
Abdul Rahiman
DOCX
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
muhammad jamil
DOCX
Mechanical Technician
Rashid Minhas
DOCX
gopi chandra sahu, Resume
Gopi Chandra sahu
Karthik Resume
KARTHIK NATARAJAN
Engr,imran cv.cement.
M Imran Ali Khan Imran
resume krishna electrical engineer
KRISHNAMOORTHY A
DVenkatesh Rotating Equip cv 2016
D Venkatesh
Electrical and Instrumentation Engineer (Offshore/Onshore)
Kiran Y V N Rao
Electrical Engineer C.V
Jujare Visvesvara Rao
Lokman's Resume-Rotating Equipment
Lokman Ali P.Eng.
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
MOHAMMED ASLAM SHAREEF
Instrument Supervisor CV
Athmanathan SwamiPrahadeeswaran
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem
Resume Nazrul Mazdi Mokhtar - Piping Designer
Nazrul Mokhtar
Resume electrical & instrumentation engg 10+ yrs exp
Sudipto Majumder
hari_new resume
hariseshukumar Tenali
NDT Resume
suresh ndt
SUDHEESH CV .
sudheesh karuvath
00-Mechanical Technician---
rohan contractor
Electrical Engineer Resume
Abdul Rahiman
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
muhammad jamil
Mechanical Technician
Rashid Minhas
gopi chandra sahu, Resume
Gopi Chandra sahu

Similar to RESUME (20)

DOC
CV _Rizwan
Muhammad Rizwan Nazir
DOC
Surajit cv.doc
surajit das
DOCX
Sharma Resume
Aman Sharma
DOCX
Sharma Resume
Aman Sharma
RTF
Satyajit Mishra (1) (1) (1)
satyajit mishra
PDF
Resume ravindra
Ravindra Singh
PDF
Resume_Ravindra
Ravindra Singh
DOC
P.V. Hari Prasad resume photo
hari prasad
DOC
paramasivam resume
Paramasivam .G
DOC
nazeemres
nazeemuddin Mohammad
DOCX
Sadanand dubey
Be 9777443413
DOC
Resume UAE
santosh pawar
DOC
Bitu.word
Prasanna kumar Jena
DOC
Sushil podia Ahm
Sushil Podia
DOC
My resume
Er Malay samir
DOCX
Satish_Reddy_resume
Satish Pydimarla
DOC
nasrulla resume
Goreba Nasrulla
DOCX
Resume avinash 142015
Avinash Bigbags
DOC
mahaprabu resume 18.10.2016
Mahaprabu A.S.
DOC
Sarvesh_CV (2)
Sarvesh Deshmukh
Surajit cv.doc
surajit das
Sharma Resume
Aman Sharma
Sharma Resume
Aman Sharma
Satyajit Mishra (1) (1) (1)
satyajit mishra
Resume ravindra
Ravindra Singh
Resume_Ravindra
Ravindra Singh
P.V. Hari Prasad resume photo
hari prasad
paramasivam resume
Paramasivam .G
Sadanand dubey
Be 9777443413
Resume UAE
santosh pawar
Sushil podia Ahm
Sushil Podia
My resume
Er Malay samir
Satish_Reddy_resume
Satish Pydimarla
nasrulla resume
Goreba Nasrulla
Resume avinash 142015
Avinash Bigbags
mahaprabu resume 18.10.2016
Mahaprabu A.S.
Sarvesh_CV (2)
Sarvesh Deshmukh
Ad

RESUME

  • 1. RESUME SHISHIR KUMAR JHA Q. No- G/VI-8, Jharnadih, D.V.C Colony, Chandrapura, Bokaro, Jharkhand - 828403 Contact: 09430293921,08800231980 E-mail: shishircit@gmail.com Date of Birth: 21st Aug 1983 Nationality: Indian Gender: Male Total Experience: 07+ Years Notice Period: 15 days MECHANICAL ENGINEER- EPC PROJECTS CONSTRUCTION & MAINTENANCE Aspiring to work with a growing and reputed organization with over 7+ Years of impressive experience in Construction, Maintenance & Execution Turnkey Projects of power plant and Management of Maintenance operations with effective Technical & Managerial Inputs across the power plant industry. Possess sound Knowledge of Erection, Maintenance & Pre- Commissioning of Power Plant of ESP (Electrostatic Precipitator), Boiler & Turbine of 15 MW to 210 MW. PROFILE EPC PROJECTS CONSTRUCTION & MAINTENANCE OF POWER PLANT PROJECTS 7+ years experience in power Plant Project erection & fabrication of power plant projects . Erection & Maintenance work of Electrostatic Precipitator (ESP). Structural Erection & Fabrication of ESP & Boiler. Erection, Maintenance & Fabrication work of Boiler & its Auxiliaries. Overhauling Of Steam Turbine. Overhauling of boiler & its Auxiliaries. Inspection and quality. Procurement and Material Management. Installation & Pre-Commissioning. Project Execution /management. MAIN ACTIVITIES AND RESPONSIBILITIES In depth understanding and expertise in Planning, Resources Management, Monitoring and documentation. Studying of order clauses & battery limits and coordinating with client/ customer, Internal Engineering departments, Project sites and Vendors / Equipment suppliers. Coordinating and resolving Engineering issues address site requirement and ensure timely supply of deliverables from Vendors. Assisting in procurement and inspection of engineering items, managing Interface between different groups, Input requirement, sequencing and parallel activities.
  • 2. Responsible for Documenting and Drawing Control, Revision Control, Approval process, Tracking of Vendor Documents, Ensuring latest revision availability etc. Maintaining all records necessary for documenting of various stages of a project such as project development, tender reviews, internal strategy discussions, client meeting notes etc for every project. ORGANATION EXPERIENCE Working as FREELANCER IN SINCE September, 2015 TO TILL, as PROJECT ENGINEER (MECHANICAL) for erection, maintenance fabrication, & pre-commissioning of ESP, turbine and Boiler & their auxiliaries in power plant projects. PROJECTS ACCOMPLISHED Site:- 125 MW Re-Erection & Maintenance work of ESP in KLTPS Gujarat . ROLE & RESPONSIBILITY Check and Maintain All Quality Measurement for ESP. Check Erection & Fabrication of Structure Part Of ESP. Check Erection, fabrication & Alignment of Collecting & Discharge Electrode of all Three Field of ESP. Check Erection & Installation of Rapping System, TR Set & Rapping Motors of ESP. Successfully Done GD Test, Rapping Test & Air Load Test of ESP. ORGANATION EXPERIENCE 12th Aug13 to 31st Aug15 CHEEMA BOILERS LTD, Mohali, Punjab as Project Engineer. PROJECTS ACCOMPLISHED Site: - 20 MW Travelling Grate Boiler, Nawanshar power plant ltd Punjab. Site: - 15 MW Travelling Grate Boiler, Kashyap Sweeteners Ltd. Madhya Pradesh. Site: - 20 MW Travelling Grate Boiler, Sainsons Paper Industries Ltd. Haryana. ROLE & RESPONSIBILITY Check and Maintain All Quality Measurement For Boiler Auxiliaries. Check Erection & Fabrication of Structure Part Of Boiler & ESP. Check Erection, fabrication & Alignment of Boiler Drum & Travelling Grate. Check Erection, Fabrication & Alignment of Air-preheater (APH), Pressure Parts & Flue gas Ducting. Check Erection ,installation & Alignment of Boiler Feed pump ,ID & FD Fans Check Erection, fabrication & Alignment of Collecting & Discharge Electrode of all Three Field of ESP. Check Erection, fabrication & Installation of Rapping System, TR Set & Rapping Motors of ESP. Successfully Done GD Test ,Rapping Test & Air Load Test of ESP
  • 3. ORGANATION EXPERIENCE 02nd Aug10 to 07th Aug13 SWATI ENERGY & PROJECTS (p). LTD, New Delhi, as Project Engineer. Site:- 75 MW & 70 MW Kutch Lignite Thermal power plant ,Gujarat. Erection, Fabrication & pre-Commissioning of Electro Static Precipitator (ESP) of 75 MW. Erection, Fabrication & Commissioning of Electro Static Precipitator (ESP) of 70 MW. Erection, Fabrication, Installation & Pre-Commissioning of APH capacity of 75 MW. ROLE & RESPONSIBILITY Supervision of work along with the RAFAKO (POLAND) Experts. Check and Maintain All Quality Measurement of ESP. Check Erection & Alignment of Collecting & Discharge Electrode of all Five Field of ESP. Check Erection & Installation of Rapping System, TR Set & Rapping Motors of ESP. Check Erection & Alignment of Supporting Structure & Bottom Ash hopper of ESP. Successfully done GD test, rapping test & Air load test of ESP. Check Erection & installation of APH & their gear motor. Site:- 210 MW Ukai Thermal Power Plant. Ukai, Gujarat. Capital Overhauling & Pre- commissioning of HP Turbine & Bearings of capacity of 210 MW LMZ Design of UTPS. Site: - 210 MW Bhusawal Thermal Power Plant. Bhusawal, Maharashtra. Capital Overhauling & Pre- commissioning of Turbine of capacity of 210 MW LMZ Design of BTPS. Site: - 60 MW Birla copper plant, Dahej, Gujarat. Capital Overhauling & pre-Commissioning of Turbine of capacity of 60 MW LMZ Design of Birla Copper, Dahej, Gujarat. ROLE & RESPONSIBILITY Supervision of work along with the RUSSIAN Experts. Check and maintain all Quality, Measuring, Alignment & reading of Turbine. Check & Note Alignment Reading of Turbine Rotor, Bearing, Diaphragms Liner of HP Turbine. Check Sand blasting of Diaphragms, Liner & Turbine Rotor. Check the Alignment of all Bearings. Check Seal Cutting, Tape checking & Swing check of rotor. Check the Centering of bottom diaphragms and Liner of HP turbine. Check parting plane matching of HP casing. Checking of Rotor Balancing of LP Turbine. ORGANATION EXPERIENCE 01st may08 to 25th July 10 ASPIRE POWER PROJECTS (P).LTD, Ranchi, Jharkhand as Engineer. Site:- 15MW WHRB, Bengal Energy Ltd. Kharagpur ,West Bengal. ROLE & RESPONSIBILITY
  • 4. Check and Maintain All Quality Measurement for Boiler and Auxiliaries. Check Fabrication, Erection & Alignment of 50 TPH Boiler structure. Check Fabrication, Erection & Alignment of APH & flue gas of ducting. SITE & ROLE- Re-Erection & overhauling work of boiler pressure part and their auxiliaries of 140 MW in CTPS, DVC, Jharkhand. Re-Erection & overhauling work of ESP of 125 MW in Jindal Power plant Jajpur, Orissa. Re-Erection work of boiler pressure part & their auxiliaries of 60 MW in BPSCL, Bokaro Jharkhand. EDUCATIONAL CREDENTIALS B.E. (Mechanical Engineering) with 70% marks from Cambridge Institute of Technology, Ranchi University in 2006. 12th standard Passed with 47% marks from D.V.C+2 High School Chandrapura, Bokaro, Jharkhand 10th standard Passed with 63% marks from D.V.C + High School Chandrapura, Bokaro, Jharkhand. COMPUTER PROFICIENCY Windows XP, MSOffice, Power point, MS Project and Internet. OTHER DETAILS Fathers Name: Shri Rabindra Nath Jha Mothers Name: Smt. Krishna Jha Passport No: J8945514 Languages known: Hindi, English. Interest: Playing Cricket & football, watching movies & news channel.