際際滷

際際滷Share a Scribd company logo
Page 1 of 4
MOSTAFA SAYED SAYED
Location: Qatar  Contacts: +974 33775654 / +974 31580619 E-mail: mostafaennno@gmail.com
Presenting 9 years comprehensive experience in building MEP project management both
in EPC Contractor domain, and aspiring for the role of 
SENIOR MEP COORDINATOR / SENIOR TECHNICAL OFFICE ENGINEER / MEP PROJECT MANAGER
Construction industry professional capable of independently managing construction of building MEP
services for high rise and low rise buildings in residential and commercial space, through first stages till
successful handover. Well versed with project management, and hands on experience in
coordinating/controlling/delivering projects within deadlines with technical and commercial success, closely
working with client and project participants, while proactively managing external deliverables. Areas of
Expertise include
 Planning & Organization
 Project Programming
 Activities Scheduling
 Design & Engineering
 Procurement Planning
 Tendering & Contracting
 Submittals Management
 Construction Management
 Contracts & Claims Mgmt
 Cost & Quality Controls
 Site Administration
 Progress
Monitoring/Control
 Team Building & Leadership
 Estimation
 Documentation
Management
PROFILE SNAPSHOTS.
 Working with Ghantoot Construction & Transport Development, since Jan 2016, currently as Senior
MEP Coordinator.
 Extensive experience in HVAC, Firefighting, Plumbing, Electrical systems for buildings.
 Proven ability anchor all MEP activities of projects in terms of resources mobilization, project equipment
& logistics, planning, risk management, design, engineering, estimation, subcontracting, procurement,
MEP coordination, execution, QA/QC, interface management, cash flow management, as-built
documentation, handover and commercial closeout
 Skilled in preparation and review of technical submittals e.g. material submittals, method statements,
shop drawings, Quality procedures, etc., and preparing/replying to RFIs as required from time to time
 Highly effective in maintaining and enhancing project productivity by developing work procedures,
streamlining workflow, supervising & controlling work performance, and optimizing resources
(manpower/material/equipment) utilization.
 Influencing & decisive leader and strong team player with excellent communications, relationship
management and problem solving skills, and ability to manage team performance and work with people
at all levels.
Page 2 of 4
WORKING EXPERIENCE
Ghantoot Construction & Transport Development (Main Contractor) Jan 2016 Present
Sr. MEP Coordinator
Projects & Roles
Project : Al Matar Showroom Project
Client: MR: Adel Abdulla Al Naemi
Consultant: Arabian Architectural Group (AAG)
Roles: Senior MEP Coordinator
 Attending regular meetings (on work progress, coordination, design, etc. ) with Main Contractor
and Consultant to discuss key issues related to the project and take effective corrective actions.
 Monitoring project budgets and schedule and oversee performance to ensure on time, quality and
on budget project execution.
 Coordinate with the design team on all aspects of the design for MEP Systems to insure meeting
specification, standards and Authorities requirement.
 Coordinate with Authorities and Consultant to meet all requirements.
 Prepare periodic reports for management including status of budgets, variance/change claims,
schedules, disputes, up-coming activities & safety records.
 Ensure all technical aspects of the projects are strictly complied with and in conformity with
Conditions of Contract, Particular Specifications, General Specifications, Contract Drawings & BOQ.
 Evaluate the requirement of project resources (material, machinery, manpower) as per schedule
and arrange for the availability of the same.
 Plans and coordinate all on-site MEP activities in conformance with project specifications
 Follow up and monitor technical submission schedules and review weekly progress report
 Prepare/review all technical submittals prior to approval by client/consultant
 Ensure that MEP systems satisfy client objectives, and criteria for design, installation, commissioning,
and O&M
 Monitor design progress and development of tracking documents
 Attend meetings as required, and follow up project Schedule and look ahead program
 Review tender documents and report deficiencies and recommendation
 Monitor and control site work performance and the subcontractors activities, inspect quality and
report non-conformances.
 Attend Consultant's material & work inspections, local factory visits and Authorities Inspections
 Process RFIs and change order requests through appropriate parties on a timely basis
 Ensure works are planned and executed strictly as per MEP coordination drawings to avoid any
conflicts
 Set up and manage documents and checking / auditing the documentation system
 Participate in reviewing purchase documents against approved BOQ & specs, and ensure materials
received meet specs
 Assist MEP manager in preparing periodical reports and other reports
 Review, analyze and process subcontractor/vendor invoices against actual work or supplies
 Develop action and recovery plans to support project delivery on time.
Page 3 of 4
(Cooling Technology by Natural Gas  GAS CHILL)  (Kharafi National K.S.C). Oct 2011 Jan 2016
MEP Project Manager ( Oct 2011 to Jan 2014 )
Technical Office Engineer ( Jan 2014 to Jan 2016 )
Projects & Roles
Projects.
 Execute for Cairo Festival City Project at (New Cairo City).
 Execute for Americana Plaza Village Project at (Sheikh Zayed City).
 Execute for cooling water Plant by natural gas at (Sheikh Zayed City).
 Execute for General Authority For Investment Project (GAFI) at (Cairo City).
 Execute for Cleopatra Plaza Mall Project at (Alexandria City).
 Execute for Neuron Spine Hospital Project at (6 of October City).
 Execute for Americana Plaza Village Project at (New Cairo City).
 Execute for Hanimex Mall Project at (New Cairo City).
Roles: MEP Project Manager
 Fully in-charge of an Electro/Mechanical Project.
 Evaluate the requirement of project resources (material, machinery, manpower) as per schedule and
arrange for the availability of the same.
 Maintain and manage all purchase and delivery schedules, change order processes, shop drawings,
document control logs, Owner, Architect and Subcontractor correspondence.
 Work with Purchasing in setting up/executing trade buyout including: defining scope of work, ensuring
scope coverage, coordinating buy and project schedules.
 Monitoring project budgets and schedule and oversee performance to ensure on time, quality and on
budget project execution.
 Ensure timely delivery of equipment, material & systems to support site installation works as
per approved work program.
Working at (HORSE COMPANY FOR ENGINEERING WORKS ALEX) August 2008  Sep 2011
MEP Executive Engineer
Projects & Roles.
Projects.
 Execute and start up for Elmaadi water treatment plant.
 Execute and start up for Abo Elnomres water treatment plant.
Project Description: The project consists of main building with external landscape and external
services areas (chiller yard, underground tanks, and sewerage treatment plant) with total building area
of 19607 m2. The main building consists of Basement, Ground, two floors and service floor with total
built up area 18092 m2. Facilities include Data Center, Substation, Generator Room, District Cooling
Plant, Sewage Treatment Plant, Elevators, AHUs Room, Pump Rooms (fire and domestic water),
Submersible Pumps, FCC Room, UBS Rooms, Irrigation system, 11KV Work infrastructure and Fiber
Optic infrastructure works.
Page 4 of 4
Roles: MEP Executive Engineer.
 Supervise Installation of HVAC & Chilled Water system, Plumbing system, Swimming Pool and irrigation
system
 Supervise Installation of firefighting system according to NFPA.
 Review and comment on material submittals, and ensure these meet project specifications.
 Check sub-contractors documents, shop drawings, material submittals and method of statements.
 Adhere to mechanical concepts on site and ensure that nominated sub- contractor is following the
right procedures.
 Implement the engineering practice, specification requirements, local rules and regulations.
 Monitor site work progress as per Baseline program.
 Preparation of snag list before commissioning.
Education.
-Bachelor (B.Sc.) in Electrical Engineering from Engineering College, Helwan University, 2008.
-Department: Electrical power and machines Department.
-Graduation Year: May 2008.
-Applied to master in utilization (generation and usage the electrical power) in Cairo University.
Personal Particulars.
 Full Name: Mostafa Sayed Sayed
 Date of Birth: 26th Sep 1983
 Nationality: Egyptian
 Marital Status: Married
 No. of Dependents: Two
 Driving License: Qatar-Egypt
Courses.
 Design of Distribution system course including.
 Lighting System.
 Wiring accessories.
 Panel Board & Panel Schedule.
 Cables & Circuit Breakers.
 Earthing System.
 Light Current (Fire Alarm System- Data and Telephone System- Sound System).
 AutoCAD distribution course. Out, in 2009.
All references Available upon request

More Related Content

What's hot (20)

Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
Jitendra Shende
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
Mohammed Akbar
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
Arun Arun
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
VEERAKAMU C
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
Mudassir Nazar Dabilkar
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineer
imran ahmed
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
Popovici Adrian
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad
Kashif CV PDF
Kashif CV PDFKashif CV PDF
Kashif CV PDF
MOHAMMED KASHIF ALI
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
Mohamed Diab
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
Deva Narayanan
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
RAMA KRISHNA T V V
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
NOORUDDIN SHAIKH
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
Mohamed Aboobakkar Sidiq
HVAC ENGINEER
HVAC ENGINEERHVAC ENGINEER
HVAC ENGINEER
CADD Centre Training Services Pvt Ltd.
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
Padmanabh Dhobale
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
Romy george
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
GOPAKUMAR BALAKRISHNA PILLAI
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
Jitendra Shende
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
Mohammed Akbar
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
Arun Arun
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
VEERAKAMU C
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
Mudassir Nazar Dabilkar
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineer
imran ahmed
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
Popovici Adrian
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
Mohamed Diab
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
Deva Narayanan
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
NOORUDDIN SHAIKH
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
Romy george

Viewers also liked (13)

Clase n1Clase n1
Clase n1
DiegoCervantes27
Mapa comunicacion (1)Mapa comunicacion (1)
Mapa comunicacion (1)
EVT
遺看馨顎稼庄界温界庄坦稼遺看馨顎稼庄界温界庄坦稼
遺看馨顎稼庄界温界庄坦稼
Gabriel Cabrera
El Proceso de comunicaci坦n 1尊 ParteEl Proceso de comunicaci坦n 1尊 Parte
El Proceso de comunicaci坦n 1尊 Parte
narabruz
Cultura jud鱈aCultura jud鱈a
Cultura jud鱈a
Sociedad Juvenil Iglesia Aposento Alto
La estimulaci坦n temprana y su relaci坦n en el 叩rea cognitiva del desarrollo de...La estimulaci坦n temprana y su relaci坦n en el 叩rea cognitiva del desarrollo de...
La estimulaci坦n temprana y su relaci坦n en el 叩rea cognitiva del desarrollo de...
TanniaCarrasco1994
Las cosas importantes de la vidaLas cosas importantes de la vida
Las cosas importantes de la vida
roxasantos
La comunicaci坦n para los sordomudosLa comunicaci坦n para los sordomudos
La comunicaci坦n para los sordomudos
maryde07
Sesi坦N 03: Comunicaci坦N No VerbalSesi坦N 03: Comunicaci坦N No Verbal
Sesi坦N 03: Comunicaci坦N No Verbal
Jonhy Leyva Aguilar
Sesi坦n 6 comunicaci坦n no verbalSesi坦n 6 comunicaci坦n no verbal
Sesi坦n 6 comunicaci坦n no verbal
JULIO CORDOVA
Telegrafo DiapositivaTelegrafo Diapositiva
Telegrafo Diapositiva
karenmercado
Tipos De Comunicaci坦N No Verbal KinesicaTipos De Comunicaci坦N No Verbal Kinesica
Tipos De Comunicaci坦N No Verbal Kinesica
educacion
La Comunicacion No VerbalLa Comunicacion No Verbal
La Comunicacion No Verbal
Bertha Elisa Garc鱈a Garza
Clase n1Clase n1
Clase n1
DiegoCervantes27
Mapa comunicacion (1)Mapa comunicacion (1)
Mapa comunicacion (1)
EVT
遺看馨顎稼庄界温界庄坦稼遺看馨顎稼庄界温界庄坦稼
遺看馨顎稼庄界温界庄坦稼
Gabriel Cabrera
El Proceso de comunicaci坦n 1尊 ParteEl Proceso de comunicaci坦n 1尊 Parte
El Proceso de comunicaci坦n 1尊 Parte
narabruz
La estimulaci坦n temprana y su relaci坦n en el 叩rea cognitiva del desarrollo de...La estimulaci坦n temprana y su relaci坦n en el 叩rea cognitiva del desarrollo de...
La estimulaci坦n temprana y su relaci坦n en el 叩rea cognitiva del desarrollo de...
TanniaCarrasco1994
Las cosas importantes de la vidaLas cosas importantes de la vida
Las cosas importantes de la vida
roxasantos
La comunicaci坦n para los sordomudosLa comunicaci坦n para los sordomudos
La comunicaci坦n para los sordomudos
maryde07
Sesi坦N 03: Comunicaci坦N No VerbalSesi坦N 03: Comunicaci坦N No Verbal
Sesi坦N 03: Comunicaci坦N No Verbal
Jonhy Leyva Aguilar
Sesi坦n 6 comunicaci坦n no verbalSesi坦n 6 comunicaci坦n no verbal
Sesi坦n 6 comunicaci坦n no verbal
JULIO CORDOVA
Telegrafo DiapositivaTelegrafo Diapositiva
Telegrafo Diapositiva
karenmercado
Tipos De Comunicaci坦N No Verbal KinesicaTipos De Comunicaci坦N No Verbal Kinesica
Tipos De Comunicaci坦N No Verbal Kinesica
educacion
La Comunicacion No VerbalLa Comunicacion No Verbal
La Comunicacion No Verbal
Bertha Elisa Garc鱈a Garza

Similar to Resume - MOSTAFA SAYED (C.V) (20)

Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
Vikram Prabhakar
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
vilwanathan maripitchai
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
Ravi Shankar
ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
Alaa Abughaidah
Henry CV
Henry CVHenry CV
Henry CV
Henry Jayahar
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
Ismail Shaikh
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar Profile
Shailesh Pawar
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
Samrat Khanorkar
Sachin parab
Sachin parabSachin parab
Sachin parab
SACHIN PARAB
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Abd~el Hakim mohamed izran
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
Amol Kulkarni
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
Mohideen Sheik Asan
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
Sasikumar Essa
CV
CVCV
CV
Ghufran Ali Khan
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
Sidharth Sunny
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
Sidharth Sunny
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
Benjan Amtipuesto
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
Vikram Prabhakar
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
Ravi Shankar
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
Ismail Shaikh
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar Profile
Shailesh Pawar
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
Samrat Khanorkar
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Abd~el Hakim mohamed izran
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
Amol Kulkarni
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
Mohideen Sheik Asan
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
Sidharth Sunny
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
Sidharth Sunny
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
Benjan Amtipuesto

Resume - MOSTAFA SAYED (C.V)

  • 1. Page 1 of 4 MOSTAFA SAYED SAYED Location: Qatar Contacts: +974 33775654 / +974 31580619 E-mail: mostafaennno@gmail.com Presenting 9 years comprehensive experience in building MEP project management both in EPC Contractor domain, and aspiring for the role of SENIOR MEP COORDINATOR / SENIOR TECHNICAL OFFICE ENGINEER / MEP PROJECT MANAGER Construction industry professional capable of independently managing construction of building MEP services for high rise and low rise buildings in residential and commercial space, through first stages till successful handover. Well versed with project management, and hands on experience in coordinating/controlling/delivering projects within deadlines with technical and commercial success, closely working with client and project participants, while proactively managing external deliverables. Areas of Expertise include Planning & Organization Project Programming Activities Scheduling Design & Engineering Procurement Planning Tendering & Contracting Submittals Management Construction Management Contracts & Claims Mgmt Cost & Quality Controls Site Administration Progress Monitoring/Control Team Building & Leadership Estimation Documentation Management PROFILE SNAPSHOTS. Working with Ghantoot Construction & Transport Development, since Jan 2016, currently as Senior MEP Coordinator. Extensive experience in HVAC, Firefighting, Plumbing, Electrical systems for buildings. Proven ability anchor all MEP activities of projects in terms of resources mobilization, project equipment & logistics, planning, risk management, design, engineering, estimation, subcontracting, procurement, MEP coordination, execution, QA/QC, interface management, cash flow management, as-built documentation, handover and commercial closeout Skilled in preparation and review of technical submittals e.g. material submittals, method statements, shop drawings, Quality procedures, etc., and preparing/replying to RFIs as required from time to time Highly effective in maintaining and enhancing project productivity by developing work procedures, streamlining workflow, supervising & controlling work performance, and optimizing resources (manpower/material/equipment) utilization. Influencing & decisive leader and strong team player with excellent communications, relationship management and problem solving skills, and ability to manage team performance and work with people at all levels.
  • 2. Page 2 of 4 WORKING EXPERIENCE Ghantoot Construction & Transport Development (Main Contractor) Jan 2016 Present Sr. MEP Coordinator Projects & Roles Project : Al Matar Showroom Project Client: MR: Adel Abdulla Al Naemi Consultant: Arabian Architectural Group (AAG) Roles: Senior MEP Coordinator Attending regular meetings (on work progress, coordination, design, etc. ) with Main Contractor and Consultant to discuss key issues related to the project and take effective corrective actions. Monitoring project budgets and schedule and oversee performance to ensure on time, quality and on budget project execution. Coordinate with the design team on all aspects of the design for MEP Systems to insure meeting specification, standards and Authorities requirement. Coordinate with Authorities and Consultant to meet all requirements. Prepare periodic reports for management including status of budgets, variance/change claims, schedules, disputes, up-coming activities & safety records. Ensure all technical aspects of the projects are strictly complied with and in conformity with Conditions of Contract, Particular Specifications, General Specifications, Contract Drawings & BOQ. Evaluate the requirement of project resources (material, machinery, manpower) as per schedule and arrange for the availability of the same. Plans and coordinate all on-site MEP activities in conformance with project specifications Follow up and monitor technical submission schedules and review weekly progress report Prepare/review all technical submittals prior to approval by client/consultant Ensure that MEP systems satisfy client objectives, and criteria for design, installation, commissioning, and O&M Monitor design progress and development of tracking documents Attend meetings as required, and follow up project Schedule and look ahead program Review tender documents and report deficiencies and recommendation Monitor and control site work performance and the subcontractors activities, inspect quality and report non-conformances. Attend Consultant's material & work inspections, local factory visits and Authorities Inspections Process RFIs and change order requests through appropriate parties on a timely basis Ensure works are planned and executed strictly as per MEP coordination drawings to avoid any conflicts Set up and manage documents and checking / auditing the documentation system Participate in reviewing purchase documents against approved BOQ & specs, and ensure materials received meet specs Assist MEP manager in preparing periodical reports and other reports Review, analyze and process subcontractor/vendor invoices against actual work or supplies Develop action and recovery plans to support project delivery on time.
  • 3. Page 3 of 4 (Cooling Technology by Natural Gas GAS CHILL) (Kharafi National K.S.C). Oct 2011 Jan 2016 MEP Project Manager ( Oct 2011 to Jan 2014 ) Technical Office Engineer ( Jan 2014 to Jan 2016 ) Projects & Roles Projects. Execute for Cairo Festival City Project at (New Cairo City). Execute for Americana Plaza Village Project at (Sheikh Zayed City). Execute for cooling water Plant by natural gas at (Sheikh Zayed City). Execute for General Authority For Investment Project (GAFI) at (Cairo City). Execute for Cleopatra Plaza Mall Project at (Alexandria City). Execute for Neuron Spine Hospital Project at (6 of October City). Execute for Americana Plaza Village Project at (New Cairo City). Execute for Hanimex Mall Project at (New Cairo City). Roles: MEP Project Manager Fully in-charge of an Electro/Mechanical Project. Evaluate the requirement of project resources (material, machinery, manpower) as per schedule and arrange for the availability of the same. Maintain and manage all purchase and delivery schedules, change order processes, shop drawings, document control logs, Owner, Architect and Subcontractor correspondence. Work with Purchasing in setting up/executing trade buyout including: defining scope of work, ensuring scope coverage, coordinating buy and project schedules. Monitoring project budgets and schedule and oversee performance to ensure on time, quality and on budget project execution. Ensure timely delivery of equipment, material & systems to support site installation works as per approved work program. Working at (HORSE COMPANY FOR ENGINEERING WORKS ALEX) August 2008 Sep 2011 MEP Executive Engineer Projects & Roles. Projects. Execute and start up for Elmaadi water treatment plant. Execute and start up for Abo Elnomres water treatment plant. Project Description: The project consists of main building with external landscape and external services areas (chiller yard, underground tanks, and sewerage treatment plant) with total building area of 19607 m2. The main building consists of Basement, Ground, two floors and service floor with total built up area 18092 m2. Facilities include Data Center, Substation, Generator Room, District Cooling Plant, Sewage Treatment Plant, Elevators, AHUs Room, Pump Rooms (fire and domestic water), Submersible Pumps, FCC Room, UBS Rooms, Irrigation system, 11KV Work infrastructure and Fiber Optic infrastructure works.
  • 4. Page 4 of 4 Roles: MEP Executive Engineer. Supervise Installation of HVAC & Chilled Water system, Plumbing system, Swimming Pool and irrigation system Supervise Installation of firefighting system according to NFPA. Review and comment on material submittals, and ensure these meet project specifications. Check sub-contractors documents, shop drawings, material submittals and method of statements. Adhere to mechanical concepts on site and ensure that nominated sub- contractor is following the right procedures. Implement the engineering practice, specification requirements, local rules and regulations. Monitor site work progress as per Baseline program. Preparation of snag list before commissioning. Education. -Bachelor (B.Sc.) in Electrical Engineering from Engineering College, Helwan University, 2008. -Department: Electrical power and machines Department. -Graduation Year: May 2008. -Applied to master in utilization (generation and usage the electrical power) in Cairo University. Personal Particulars. Full Name: Mostafa Sayed Sayed Date of Birth: 26th Sep 1983 Nationality: Egyptian Marital Status: Married No. of Dependents: Two Driving License: Qatar-Egypt Courses. Design of Distribution system course including. Lighting System. Wiring accessories. Panel Board & Panel Schedule. Cables & Circuit Breakers. Earthing System. Light Current (Fire Alarm System- Data and Telephone System- Sound System). AutoCAD distribution course. Out, in 2009. All references Available upon request