際際滷

際際滷Share a Scribd company logo
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
Design
Site Survey
Civil Structure
Mechanical
Structure
Module Selection
Cable Selection
Electrical
Equipmet
Implementation
Civil
Mechanical
Electrical
Project
Management
Site Supervision
O&M
Module Level
Monitoring
Inverter Level
Monitoring
Soiling Losses
SeasonalTilt
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015
REtopia 2015

More Related Content

REtopia 2015

Editor's Notes

  1. Site Topography and Contour Survey The most important here in this segment is to review the strata of the land and thus design the structure foundations as per it. Say if you are planning a project in rocky terrain, make sure that the excavation for foundation of building or array structure will be easily done up to the designed depth. If the terrain is undulated or with dune soil strata, it is recommended to properly water bound it and compact the land before starting work. To avoid undulations the soil cutting can be done yet it is a cost effective step. If the arrays are not properly designed on undulated land plant will not generate power effectively.