The operator was preparing to drill a well where low-gravity solids (LGS) had previously caused expensive problems in offset wells. M-I SWACO recommended using their new RHE-USE process to remove LGS and improve drilling efficiency. When applied in a 5,049-ft interval, the RHE-USE process saved an estimated $163,282 by reducing dilution needs and allowing reuse of drilling fluid. It also improved drilling performance by lowering downhole temperatures and reducing bit wear.
1 of 2
Download to read offline
More Related Content
rhe-use_haynesville_1
1. CASE STUDY
The Situation
The operator was prepared to drill a well in Caddo, LA where
low-gravity solids (LGS) had previously presented a host of
expensive problems. In offset wells, the operator had to contend
with the enormous costs and potential environmental liabilities
associated with hauling large volumes of contaminated cuttings
to distant disposal sites. In addition, the inability to remove
LGS restricted drilling performance, further increasing well
construction costs.
The Solution
Solids control/waste management specialists from M-I SWACO,
A Schlumberger Company, recommended the operator employ
their new-generation RHE-USE
process to completely remove
LGS to enhance drilling efficiency and reduce disposal costs.
The patent-pending, chemically-enhanced technology had
previously field-proven its capacity to optimize drilling while
delivering cuttings suitable for onsite disposal. With operator
approval, the process was used in a 5,049-ft (1,539 m) interval
from 10,768 to 15,817 ft TD (3,282-4,821 m).
The Results
By using the RHE-USE process, the operator saved an estimated $163,282, including the recovery of 1,045 bbl of reusable oil-base drilling
fluid through the use of dual MEERKAT
drying shakers. Total dilution amounted to 537 bbl of diesel, water and barite.
In comparison, at the 100% dilution rate previously required, up to 18,517 bbl would have been consumed to maintain 2.9% LGS. In
addition, the 5,049-ft interval was drilled in 12 days with generated hole volume of approximately 275.2 bbl based on a 6他 -in. bit
and 10% washout. Removing the bulk of the LGS concentration also reduced friction appreciably, thereby lowering downhole mud
temperature by 20 to 30属. Less abrasion meant the downhole motor and bit could drill longer without tripping for maintenance.
Haynesville Shale: RHE-USE saves operator
an estimated $163,282
2. 息2012 M-I L.L.C. All rights reserved.
Mark of M-I L.L.C.
DPR.1806a.1208.R1 (E)
Patent Pending
This information is supplied solely for informational purposes and M-I SWACO makes no guarantees or
warranties, either expressed or implied, with respect to the accuracy and use of this data. All product
warranties and guarantees shall be governed by the Standard Terms of Sale. Nothing in this document
is legal advice or is a substitute for competent legal advice.