The document summarizes the proposed power evacuation network for a 78 MW project in Rop. It will utilize a single circuit 132kV transmission line to evacuate power to the nearby Jadhol 132kV substation. Preliminary technical studies found the project feasible, but utility approval has not yet been applied for.
1 of 2
Download to read offline
More Related Content
Rj rop 78 mw
1. Summary on Power Evacuation Network Rop
Sl
No
Particulars Remarks
1 Proposed Capacity 78 MW
2 Voltage level for Evacuation 132 KV
3 a) No. of Circuits SC Line
b) Scheme of Connection 132KV SC Line to Jadhol 132KV SS
4 Preliminary Study results Technically Feasible
5 Utility Approval status Yet to Apply