際際滷

際際滷Share a Scribd company logo
1
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
1
ROCKBURSTMANAGEMENTIN
DEEP SOUTHAFRICAN MINES
William Joughin
Shaun Murphy
Lindsay Linzer
Rock Dynamics and Applications 息 SRK Consulting (SA) Ltd 2018. All rights reserved.
RockDyn-3
2
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Overview
 Brief introduction to South African
deep mines
 Rockburst support systems
 Mine design
 Support design
 Seismic hazard assessment?
3
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Witwatersrand Goldfields
4
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Witwatersrand Geology
5
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Mining of narrow tabular reefs at depth
6
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Mining of narrow tabular reefs at depth
Pneumatic hand held drills
and airlegs
Scrapers pulled by winches
7
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (stope)
Engineered timber props (elongates)
Timber packs on gullies
Backfill
8
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (stope)
Engineered timber props (elongates)
Backfill
9
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Backfill
Yielding
support
element
Yield after 2.5 event
Rockburst support systems (stope)
Performance during a
seismic event
Footwall/floor
Hangingwall/roof
Total closure
(no backfill)
10
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Before After 2.8 event
Rockburst support systems (stope)
Performance during a seismic event
11
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (stope)
Hangingwall failure between support
12
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Bolts installed in 1m stope height
Rockburst support systems (stope)
13
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (stope)
High tensile steel netting
Rapid Yielding
Hydraulic Props
Extensions???
14
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (stope)
15
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (tunnel)
16
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (tunnel)
Chain link (diamond) mesh
and lacing (de-stranded
high tensile hoist rope)
17
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (tunnel)
Failed bolts
(insufficient
energy
absorption)
18
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (tunnel)
Extreme damage
19
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Tunnel after 2.8 mag. event in
close proximity
Rockburst support systems (tunnel)
20
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (tunnel)
Tunnel support with
circular sets and foam
cement (0.3 MPa strength
 shock absorber)
21
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Rockburst support systems (tunnel)
Tunnel support with
circular sets and foam
cement (0.3 MPa strength
 shock absorber)
22
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Mine Design (layouts)
Mined out
(green)
CLR Planned mining
Planned development
VCR Planned mining
West Section East Section
23
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Mine Design (limiting span  closure)
ERR = 遜 鰹
Mo  GA
24
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Mine Design (sequence)
25
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Support Design (tunnel stress)
Similar to CRH and Martin et. al. 1999
26
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Support design (geological structures)
Major faults and dykes
Circular sets and
foam cement
27
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Map PPV due to ML = 1.9 onto
excavation surfaces
PPV
(m/s)
Wesseloo 2012
Ground motion data
Support design (PPV)
28
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Support design (modelling of PPV)
Malovicho & Basson, 2014
Malovicho, 2017
Adaptation of Salamon-Linkov Method
29
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Support design (dynamic capacity)
30
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Support design (dynamic capacity)
31
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Seismic hazard (daily)
Prediction?
32
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Seismic hazard (daily)
Traffic light system
Red = withdrawal?
33
息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3)
Acknowledgements
 AngloGold Ashanti
 Australian Centre for Gomechanics (ACG)
 New Concept Mining (NCM)
 Institute of Mine Seismology (IMS)

More Related Content

Rockdyn3 Conference_William Joughin

  • 1. 1 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) 1 ROCKBURSTMANAGEMENTIN DEEP SOUTHAFRICAN MINES William Joughin Shaun Murphy Lindsay Linzer Rock Dynamics and Applications 息 SRK Consulting (SA) Ltd 2018. All rights reserved. RockDyn-3
  • 2. 2 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Overview Brief introduction to South African deep mines Rockburst support systems Mine design Support design Seismic hazard assessment?
  • 3. 3 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Witwatersrand Goldfields
  • 4. 4 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Witwatersrand Geology
  • 5. 5 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Mining of narrow tabular reefs at depth
  • 6. 6 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Mining of narrow tabular reefs at depth Pneumatic hand held drills and airlegs Scrapers pulled by winches
  • 7. 7 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (stope) Engineered timber props (elongates) Timber packs on gullies Backfill
  • 8. 8 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (stope) Engineered timber props (elongates) Backfill
  • 9. 9 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Backfill Yielding support element Yield after 2.5 event Rockburst support systems (stope) Performance during a seismic event Footwall/floor Hangingwall/roof Total closure (no backfill)
  • 10. 10 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Before After 2.8 event Rockburst support systems (stope) Performance during a seismic event
  • 11. 11 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (stope) Hangingwall failure between support
  • 12. 12 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Bolts installed in 1m stope height Rockburst support systems (stope)
  • 13. 13 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (stope) High tensile steel netting Rapid Yielding Hydraulic Props Extensions???
  • 14. 14 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (stope)
  • 15. 15 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (tunnel)
  • 16. 16 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (tunnel) Chain link (diamond) mesh and lacing (de-stranded high tensile hoist rope)
  • 17. 17 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (tunnel) Failed bolts (insufficient energy absorption)
  • 18. 18 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (tunnel) Extreme damage
  • 19. 19 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Tunnel after 2.8 mag. event in close proximity Rockburst support systems (tunnel)
  • 20. 20 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (tunnel) Tunnel support with circular sets and foam cement (0.3 MPa strength shock absorber)
  • 21. 21 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Rockburst support systems (tunnel) Tunnel support with circular sets and foam cement (0.3 MPa strength shock absorber)
  • 22. 22 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Mine Design (layouts) Mined out (green) CLR Planned mining Planned development VCR Planned mining West Section East Section
  • 23. 23 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Mine Design (limiting span closure) ERR = 遜 鰹 Mo GA
  • 24. 24 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Mine Design (sequence)
  • 25. 25 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Support Design (tunnel stress) Similar to CRH and Martin et. al. 1999
  • 26. 26 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Support design (geological structures) Major faults and dykes Circular sets and foam cement
  • 27. 27 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Map PPV due to ML = 1.9 onto excavation surfaces PPV (m/s) Wesseloo 2012 Ground motion data Support design (PPV)
  • 28. 28 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Support design (modelling of PPV) Malovicho & Basson, 2014 Malovicho, 2017 Adaptation of Salamon-Linkov Method
  • 29. 29 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Support design (dynamic capacity)
  • 30. 30 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Support design (dynamic capacity)
  • 31. 31 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Seismic hazard (daily) Prediction?
  • 32. 32 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Seismic hazard (daily) Traffic light system Red = withdrawal?
  • 33. 33 息 SRK Consulting (SA) Ltd 2018. All rights reserved.Rock Dynamics and Applications (RocDyn-3) Acknowledgements AngloGold Ashanti Australian Centre for Gomechanics (ACG) New Concept Mining (NCM) Institute of Mine Seismology (IMS)