How we can implement Safety Barrier in Revit, what are the advantages of having an Add-In and what are the procedures to have a successful BIM project, hope you enjoy it
1 of 29
Downloaded 22 times
More Related Content
Safety implementation in BIM
1. BIM (BUILDING
INFORMATION MODELING)
DONE BY: ZAIN JURATLI
FACULTY IN CHARGE: PROF. ALAN
HOBACK
DEPARTMENT CIVIL,
ARCHITECTURAL &
ENVIRONMENTAL ENGINEERING,
UNIVERSITY OF DETROIT MERCY
2. ABOUT
ZAIN JURATLI
? GEORGE P. JOHNSON, INTERN 07/2017- 10/2017
GEORGE P. JOHNSON IS GPJ HAS A RIGOROUS, PROGRAMMATIC
APPROACH TO CREATING BRAND EXPERIENCES. EXPERIENCE DESIGN
UNITES ALL OF OUR DISCIPLINES - STRATEGY, CREATIVE,
TECHNOLOGY AND PRODUCTION - AND FOCUSES THOSE TALENTS
TO ADDRESS AND
ENGAGE THE PERSONAS OF OUR CLIENTS' TARGET AUDIENCES.
? CIVIL ENGINEER DESIGNER, INTERN 05/2017- 08/2017
FUTURE FENCE FABRICATING, WARREN, MI
FUTURE FABRICATING IS AN AISC CERTIFIED COMMERCIAL
ORNAMENTAL FABRICATION COMPANY, SPECIALIZE IN RAILINGS
AND ORNATE
FABRICATED ARCHITECTURAL DETAILS FOR BUILDINGS, BRIDGES,
PARKS AND STREETSCAPES.
? PROJECT ENGINEER, 03/2015 ¨C 08/2016
AL MASSA DECORATION AND GYPSUM WORK, AL AIN, UNITED ARAB
EMIRATES
NATIONAL FIRM COMPLETING CONSTRUCTION PROJECTS ACROSS
UAE
? BIM MODELER ¨C STRUCTURAL TECHNOLOGIST 02/2015 ¨C
? Master of Science in Civil Engineering 08/2016 ¨C
Present
University of Detroit Mercy Expected Graduation Dec.
2017
? Bachelor of Science (BS), Civil Engineering 01/2015
3. TABLE OF CONTENT
? PROBLEM IN ANY CONSTRUCTION SITE
? WHAT IS BIM?
? BIM PROCESS
? BIM APPLICATION
? SAFETY IMPLEMENTATION IN BIM
? ADD-IN
? FUTURE OF BIM
? CONCLUSION
5. TYPICAL PROBLEMS IN CONSTRUCTION
INDUSTRY
? Lack Of Proper Planning
? Lack Of Coordination
? Lack Of Professional Education
? Poor Decision Making
? Lowest Bidding Procurement Method
? Inefficient Cost Control
? Lack Of Project Monitoring/Program Monitoring
? Lack Of Project Delivery
? Frustrated Owners
? Etc¡
? 30% OF PROJECTS DO NOT MEET ORIGINAL
PROGRAM OR BUDGET
? 92% OF CLIENT SAID THE DESIGNERS
DRAWINGS ARE TYPICALLY NOT SUFFICIENT
FOR CONSTRUCTION
? 37% OF MATERIAL USED IN CONSTRUCTION
BECAME WASTE
? 10% OF THE COST OF A PROJECT IS TYPICALLY
DUE TO CHANGE ORDERS
? 38% OF CARBON EMISSIONS ARE FROM
BUILDINGS NOT CAR
Reasons Results
CMAA Owners survey, CMAA Industry Report, Economist
Magazine
6. TYPICAL PROBLEMS IN CONSTRUCTION
INDUSTRY
? Inability to visualize the final product
at design phase leads to changes in
design in the construction phase
causing delays and extra cost.
LOUVER ¨C ABU DHABI
? LABOR
? MATERIAL
? TIME
? COST
Change Orders ¨C Variations
7. TYPICAL PROBLEMS IN CONSTRUCTION
INDUSTRY
? Over the wall syndrome, less
coordination between the
design team is resulting in poor
quality of the work.
Communication Within Teams
8. TYPICAL PROBLEMS IN CONSTRUCTION
INDUSTRY
? Current tools and workflow
does not support coordinated
work which increase cost and
time of the project as well as
decrease of quality.
? Ex. Masder City ¨C Abu Dhabi
Communication
10. TYPICAL PROBLEMS IN CONSTRUCTION
INDUSTRY
? 2D Drawings causes
miscommunication
Communication
12. WHAT IS BIM?
BIM is the next generation of 4d
visualizing and creation. since the
era of architect, the movement of
BIM was predicted, they used to
draw with stones, pencils, now we
use computers, inside the
computers every year they create a
new software to make engineers
life easier and to minimize errors
on site.
18. ABSTRACT
? Safety is a major issue on construction sites. people work high in the air on
buildings. unless proper safety equipment is installed, workers may fall from
the open edges of a building. Therefore, timely erection of barriers is essential.
? Since modern construction for large-buildings is managed through computer
platforms, a tool was created that simplifies the model creation and tracking of
installation of the barricades.
UNFORTUNATELY WITH THE MODERN SOFTWARES WE HAVE, STILL THERE IS ZERO
CONCERN IN SAFETY.
19. ? BIM can provide us the tools to get the perfect result and to minimize mistakes
as well as time management, the idea of it is to create a 3D world to the
customer, engineer, and to the client.
? Movement of BIM is what we should be focusing in, what does it do, what kind
of task it could do, why BIM is the ideal program of all, and how we can
implement our safety into BIM?
20. There are many different risks that construction workers face on the job. the occupational
safety & health administration (osha) has identified the top causes of injuries on
construction sites, which include:
? Falling from heights during construction ¨C a worker may fall from a building, scaffolding
or piece of machinery to the ground below. workers can also fall into holes or ditches on
construction sites.
? Trench collapse ¨C when a trench collapses, a worker¡¯s air supply can be cut off, and the
worker can be buried alive or suffer crushing injuries.
? Collapsed scaffolding ¨C osha has strict rules to ensure the safety and stability of
scaffolding, but things can still go wrong, causing a worker to plunge to his death or to fall
and sustain serious injury.
? Electric shock and or arc flash/blast ¨C working with generators, power tools, machinery
21. STATISTICS
Distribution of fatal injuries in construction, by event, 2011-2013
?Total: 2,486 fatalities
?Exposure: 13.2 %
?Contact w/objects: 16.8%
?Falls, slips, trips: 34.9%
?Transportation: 29.2%
?Other: 5.8%
29. REFERENCES
SOURCE: U.S. BUREAU OF LABOR STATISTICS, 2011-2013 CENSUS OF FATAL
OCCUPATIONAL INJURIES. NUMBERS ARE FROM THE ONLINE CFOI DATABASE..
OSHA. (1999, JAN). WORKER SAFETY SERIES. RETRIEVED FROM UNITED STATES
DEPARTMENT OF LABOR:
HTTPS://WWW.OSHA.GOV/PUBLICATIONS/OSHA3252/3252.HT ML
ENGINEERS, H. A. (2015, DECEMBER 17). HEALTH AND SAFETY ENGINEERS. RETRIEVED
FROM HTTPS://WWW.BLS.GOV/OOH/ARCHITECTURE-ANDENGINEERING/ HEALTH-
AND-SAFETY-ENGINEERS.HTM
/VULCANSMARTSERVICES/BUILDING-INFORMATION-
MODELING-BIM-48320625