ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Resume: Mechanical Project Engineer; Rushikesh Desai
1
Rushikesh Desai
Mechanical project Engineer
Email: rndesai123@gmail.com
rushi502004@yahoo.co.in
+966-535938519
Passport: G 3891080
Current Location: Al Jubail, Eastern Province, Saudi Arabia
------------------------------------------------------------------------------------------------------------------------------
ï‚· CAREER OBJECTIVE
Working with Reputed and well established Organization at where I can share and gain Industrial
Experience and exposure to enhance the skills
ï‚· EDUCATION QUALIFICATION
Bachelor in Mechanical Engineering from Gujarat University in Year 2000.
ï‚· Technical SKILLS
Project Planning, Project Management, People management, Quality system
Project concept development, Front end loading, FEED development, Communication plan,
engineering coordination, monitoring and controlling, scheduling and costing, manage and handling
multi-disciplinary project.
ï‚· IT SKILLS:
Operating system: MS Office, MS Project. Other Microsoft Office tools, power Point
ERP/SAP-MM-: Material Management Module.
ERP/SAP-PS-: Project Management Module. (Version 4.6 C) User end
PMP: Under preparation
Resume: Mechanical Project Engineer; Rushikesh Desai
2
Project Handled:
 EPC Projects with Overseas Technology vendor/ Manufacturer/ Process licenser
 Local Engineering consultant
 Construction contractor
 Revamping projects
 Up gradation/ modification projects
 Green field projects
 Brown field projects
ï‚· Strength:
 Proven track record of effectively and independently managing production related capital and other
projects from concept to commissioning, including but not limited to conducting, supervising, and
participating in techno-economic feasibilities studies, defining scope and standards, writing of
technical specifications for project works, Equipment and materials as per the project’s design, pre-
tender, bid evaluation and award recommendation activities, supervision of contractor’s
construction related functions and managing contractor’s claims evaluation and post project
handover activities.
 Experienced in managing planning, monitoring, control, cost, quality, and HSE and risk aspects of
projects, including recommending new processes where needed to improve quality, cost or on-time
delivery of projects. Ability to recommend proactive management of project scope changes,
identifying potential issues and devising contingency plans to address them.
 Experienced in undertaking special assignments, studies, surveys, adhoc tasks or evaluation of
Company’s existing systems and processes through bench-marking assigned by Management,
which may also include chairing/ participating in Company’s committees and task force as and
when required.
Industrial Experience:
Current Employer: Maaden Aluminium Company; from: July 2015-Present
Position: Sr. Project Engineer (Refinery Area)
Responsibility and Duties:
 Develop the Front end loading for production/ quality enhancement or notice of deficiency projects.
 Develop business case and participate in project decision review board for project objectives and
requirements.
Resume: Mechanical Project Engineer; Rushikesh Desai
3
 Develop budget estimation and time schedule.
 Engage third party to develop engineering scope and design for the project.
 Devising Questionnaire and participating in pre-qualification/ evaluation of local and international
contractors and vendors.
 Follow up to contract for project delivery and project requirements in terms of quality and within time
frame.
 People management
 Coordination with engineering agencies and inter department for project concerns and corrective
action.
 Monitor and control the project by organizing progress meeting, reporting and addressing issues to
relevant agencies for assistance.
 Conduct HAZOP/ PHA and RACI Matrix for the project and delegate responsibilities.
ï‚· Previous Employer Details:
(SABIC)Saudi Basic industries Corporation, Saudi Arabia (2009- 2015)
Position: Mechanical Project Engineer
Division: (Engineering & Project Management Deptt.)
Responsibility and Duties:
 Extensive experience in engineering, design, Procurement and construction support.
 Interact with Client to understand User’s requirement and define the preliminary scope.
 Prepare and finalize project resources and allocation according to project phase.
 Identify and allocate project resources and their role and responsibilities.
 Coordinate with inter department and external agencies to develop the project Scope, role and
responsibility, execution plan and schedule.
 Develop project schedule and Budget for the project.
 Schedule project meeting for project FEED with client in to understand and finalize the FEED
document.
 Coordinated workflow within the engineering team, executed mechanical engineering package,
reviewed mechanical drawing content, reinforced and promoted quality and safety standards,
interfaced with client and vendor engineering staff of projects.
 Incorporation of QA/ QC, HSE and construction requirements in FEED.
 Review and finalize the FEED Package. Review and Approve the Technical Requisition for Long
lead items and Construction scope.
 Preparation of ITB document, Define the Delivery schedule and Deliverable list.
Resume: Mechanical Project Engineer; Rushikesh Desai
4
 Prepare technical Bid analysis and finalize the vendor/ contractor technically for the project.
 Follow up with Procurement Department for Issuing of Purchase Order
 Conducting the KOM with Successful supplier/ vendor / contractor to elaborate the project scope in
details.
 Prepare the project preliminary schedule considering long lead and bulk items discipline wise.
 Review & Approve the Project Schedule agreed Project schedule.
 Ensured successful completion of mechanical deliverables and monitoring of project performance
for mechanical tasks, schedules and costs.
 Hands on experience in preparation of Technical Requisition for project items and Participate in the
bid evaluations.
 Managed multiple projects and prioritized with changing requirements.
 Experienced with HSE procedures and requirements of the industry.
 Well familiar in Planning, organizational and time management abilities. Can work effectively as part
of a cohesive team or independently.
 Define project performance and guarantee parameters and clauses assuring the project objectives
obtained with Legal and Procurement department.
 Monitoring and controlling project budget and allocation of resources throughout project life cycle.
 Ensure the compliance of contract and follow up for the deliverables.
Essar projects India Ltd. (2008-2009)
Position: Dy. Project Manager. (Construction)
Role and Responsibilities:
 Perform Contact administration duties to ensure that consultants, construction and/or EPC
contracts are effectively and efficiently administered and that all contractual obligations are provided
in timely manner.
 Prepare construction activity schedule and arrange and finalize resources for construction Work.
 Prepare and review method statement of erection and installation of Equipment and Machines for
the Project.
 Perform Project Technical duties to plan, coordinate and manage project activities, to ensure that
works are implemented safely, to the specified requirement within schedule and in a cost-effective
manner and proper inputs from all concerned divisions have been properly address and
incorporated.
 Conduct Monthly progress meeting with client and contractor and finalize the strategy accordingly.
 Coordinate with QA/QC to prepare and finalize the Inspection test plan and Boundary Matrix for the
Construction Phase.
Resume: Mechanical Project Engineer; Rushikesh Desai
5
 Assure the Company HSE requirements and compliance accordingly.
Flat Products Equipment India Ltd (EPCM): India (2006-2008)
Position: Assistant Manager E&C (Engineering & Construction)
Role and Responsibilities:
 Perform the day-to-day execution of construction project in order to increase and promote safety
and compliance to environmental standards.
 Prepare/ review project construction plan.
 Participate in engineering meetings to review and feedback on project constructability concerns.
 Coordinate with client and contractor to discuss the project schedule and strategy. Prepare protocol
for inspection and alignment of equipment and machinery.
 Coordinate with planning section on project progress and report to management for any
discrepancy in progress and suggestions on improvement.
 Develop/review method statement, testing procedure of project tests.
 Coordinate with QA and QC for the project quality assurance and compliance.
 Supervise and Monitoring the site activity and workman ship of Contractor in order to achieve
Quality job and Inspecting of equipment alignment and leveling. Prepare the protocol of alignment
and leveling for equipment.
 Prepare the pre start up and pre commissioning documents for equipments.
 Coordinate with client and contractor to complete the project within time frame.
 Conduct periodic construction progress meeting for project progress, safety and concerns if any.
 Resolve the project conflicts and supervise the contractor site activity and quality and frequent
perform auditing for safe and quality job performed.
 Conduct the project progress meeting with contractor and monitor the progress according to agreed
schedule.
 Participate in project safe walk through for testing and commissioning and prepare punch list.
 Follow up to contractor for punch point close out.
 Verify the mark up drawing and inform to management for As-builting.
Resume: Mechanical Project Engineer; Rushikesh Desai
6
SHAH Alloys Ltd, India (2000-2005)
Position: Project Engineer; Client End.
Role and Responsibilities:
 Participate in project execution strategy and monitor the milestone and project progress
accordingly.
 Participate in Engineering and design to comply the standards and Project requirements.
 Coordinate with Interdepartmental for review project deliverables for each Phase.
 Review and verify the method statement of Equipment Installation and for the Machine.
 Review and verify the protocol of alignment and inspection of equipment and piping Inline of
Approved IFC Drawings.
 Monitor and supervise contractor’s job quality and safe work procedures and practice to avoid any
unsafe act.
 Review and verify the Pre commissioning checklist and Procedures.
 Participate in Pre Start up Safety Review and ensuring Safe Commissioning of the Project.
 Participate in project meetings and address project concerns related to design, quality and work
progress.
 Review project testing and commissioning procedure and test plans and witness of.
 Participate in project walkthrough and ensure punch points closing prior to test.
 Coordinate with documentation for project documents and drawings.
ï‚· Personal Detail:
Full Name : Rushikesh Natvarlal Desai
Permanent Address : Rajkawada, Ramsheri, Opp. Ghanchi wadi
Patan (N.G.)-384265
Contact Details : (R) +91-2766-227192(India)
(M)+966-535938519(Saudi Arabia)
Marital Status : Married
Total Experience : 16 Years
Current Location : Al Jubail City, Saudi Arabia
Nationality : Indian
Skype ID : desaird

More Related Content

What's hot (20)

CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
Sankar Sundaram PMP
Ìý
Mohamad Seth Farabi - Resume
Mohamad Seth Farabi - ResumeMohamad Seth Farabi - Resume
Mohamad Seth Farabi - Resume
MohamadSethFarabi Is seth
Ìý
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
Khalid Masood Khan
Ìý
Mohammed Ameenuddin
Mohammed AmeenuddinMohammed Ameenuddin
Mohammed Ameenuddin
Mohammed Ameenuddin
Ìý
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddin
Fiazuddin Memon
Ìý
CV CIVIL ENGINEER
CV CIVIL ENGINEERCV CIVIL ENGINEER
CV CIVIL ENGINEER
Muhammed Shafi
Ìý
Aszem QS CV
Aszem QS CVAszem QS CV
Aszem QS CV
Athambawa Aszem
Ìý
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Rakesh Arora
Ìý
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay Analysis
Chris Carson
Ìý
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
SOHAIL SHAH
Ìý
CV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMARCV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMAR
Joemar Ramos
Ìý
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
Mudassir Nazar Dabilkar
Ìý
HVAC DRAFTSMAN CV
HVAC DRAFTSMAN CVHVAC DRAFTSMAN CV
HVAC DRAFTSMAN CV
FAISAL YUSUF
Ìý
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
Masood Baig Mirza
Ìý
CIVIL SITE ENGINEER
CIVIL SITE ENGINEERCIVIL SITE ENGINEER
CIVIL SITE ENGINEER
Durairaj Samikkannu
Ìý
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
Mohammad Issa
Ìý
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
Froilan Balanao
Ìý
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
karthikeyan ramamoorthy
Ìý
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
Popovici Adrian
Ìý
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGER
Khaled mohamed
Ìý
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
Sankar Sundaram PMP
Ìý
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
Khalid Masood Khan
Ìý
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddin
Fiazuddin Memon
Ìý
CV CIVIL ENGINEER
CV CIVIL ENGINEERCV CIVIL ENGINEER
CV CIVIL ENGINEER
Muhammed Shafi
Ìý
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Rakesh Arora
Ìý
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay Analysis
Chris Carson
Ìý
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
SOHAIL SHAH
Ìý
CV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMARCV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMAR
Joemar Ramos
Ìý
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
Mudassir Nazar Dabilkar
Ìý
HVAC DRAFTSMAN CV
HVAC DRAFTSMAN CVHVAC DRAFTSMAN CV
HVAC DRAFTSMAN CV
FAISAL YUSUF
Ìý
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
Masood Baig Mirza
Ìý
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
Mohammad Issa
Ìý
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
Froilan Balanao
Ìý
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
Popovici Adrian
Ìý
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGER
Khaled mohamed
Ìý

Viewers also liked (9)

Top 8 senior project engineer resume samples
Top 8 senior project engineer resume samplesTop 8 senior project engineer resume samples
Top 8 senior project engineer resume samples
porisjom
Ìý
Th Design Resume Xxxxxxxxx
Th Design Resume XxxxxxxxxTh Design Resume Xxxxxxxxx
Th Design Resume Xxxxxxxxx
gueste79ac87c
Ìý
Resume- Mechanical Design Engineer
Resume- Mechanical Design EngineerResume- Mechanical Design Engineer
Resume- Mechanical Design Engineer
Sandeep Bendre
Ìý
Top 8 mechanical project engineer resume samples
Top 8 mechanical project engineer resume samplesTop 8 mechanical project engineer resume samples
Top 8 mechanical project engineer resume samples
joycejames46
Ìý
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski
Ìý
Vijin resume mechanical design
Vijin resume mechanical designVijin resume mechanical design
Vijin resume mechanical design
Vijin p
Ìý
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
NOORUDDIN SHAIKH
Ìý
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
ali ibrahim
Ìý
experience certificates.PDF
experience  certificates.PDFexperience  certificates.PDF
experience certificates.PDF
Muhammad Aamir Shahzad
Ìý
Top 8 senior project engineer resume samples
Top 8 senior project engineer resume samplesTop 8 senior project engineer resume samples
Top 8 senior project engineer resume samples
porisjom
Ìý
Th Design Resume Xxxxxxxxx
Th Design Resume XxxxxxxxxTh Design Resume Xxxxxxxxx
Th Design Resume Xxxxxxxxx
gueste79ac87c
Ìý
Resume- Mechanical Design Engineer
Resume- Mechanical Design EngineerResume- Mechanical Design Engineer
Resume- Mechanical Design Engineer
Sandeep Bendre
Ìý
Top 8 mechanical project engineer resume samples
Top 8 mechanical project engineer resume samplesTop 8 mechanical project engineer resume samples
Top 8 mechanical project engineer resume samples
joycejames46
Ìý
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski
Ìý
Vijin resume mechanical design
Vijin resume mechanical designVijin resume mechanical design
Vijin resume mechanical design
Vijin p
Ìý
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
NOORUDDIN SHAIKH
Ìý
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
ali ibrahim
Ìý

Similar to Senior Project Engineer (20)

Hussam's CV
Hussam's CVHussam's CV
Hussam's CV
Hussam Alhaifi
Ìý
Resume to be printed
Resume to be printedResume to be printed
Resume to be printed
Venkatasubramanian Swaminathan PMP
Ìý
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
Sasikumar Essa
Ìý
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
Sohaib Safdar (PMP)
Ìý
IMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CVIMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CV
Imran Asghar Malik
Ìý
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
ALPESH CONTRACTOR
Ìý
Humayoun Rasheed (Geological Engineer)
Humayoun Rasheed (Geological Engineer)Humayoun Rasheed (Geological Engineer)
Humayoun Rasheed (Geological Engineer)
Humayoun Rasheed
Ìý
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
Sunil Mall
Ìý
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
Madhu Civil
Ìý
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY AROKIAM
Ìý
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
Sayantan Dhar
Ìý
resume
resumeresume
resume
rama koteswara rao bandlamudi
Ìý
Anson 090316
Anson 090316Anson 090316
Anson 090316
Anson Sam Philip
Ìý
cp civil (1)
cp civil (1)cp civil (1)
cp civil (1)
chandra prakash
Ìý
Faraz_Resume_Qatar
Faraz_Resume_QatarFaraz_Resume_Qatar
Faraz_Resume_Qatar
Faraz Nabi
Ìý
Thousiq Ahmed civil engineer
Thousiq Ahmed civil  engineerThousiq Ahmed civil  engineer
Thousiq Ahmed civil engineer
Thousiq Ahmed
Ìý
Sachin parab
Sachin parabSachin parab
Sachin parab
SACHIN PARAB
Ìý
New_Hissam_CV (3).PDF
New_Hissam_CV (3).PDFNew_Hissam_CV (3).PDF
New_Hissam_CV (3).PDF
Hissamullah Shah
Ìý
T. Story resume 2016
T. Story resume 2016T. Story resume 2016
T. Story resume 2016
Terrell Story
Ìý
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
Mohideen Sheik Asan
Ìý
IMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CVIMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CV
Imran Asghar Malik
Ìý
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
ALPESH CONTRACTOR
Ìý
Humayoun Rasheed (Geological Engineer)
Humayoun Rasheed (Geological Engineer)Humayoun Rasheed (Geological Engineer)
Humayoun Rasheed (Geological Engineer)
Humayoun Rasheed
Ìý
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
Sunil Mall
Ìý
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
Madhu Civil
Ìý
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY AROKIAM
Ìý
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
Sayantan Dhar
Ìý
Faraz_Resume_Qatar
Faraz_Resume_QatarFaraz_Resume_Qatar
Faraz_Resume_Qatar
Faraz Nabi
Ìý
Thousiq Ahmed civil engineer
Thousiq Ahmed civil  engineerThousiq Ahmed civil  engineer
Thousiq Ahmed civil engineer
Thousiq Ahmed
Ìý
Sachin parab
Sachin parabSachin parab
Sachin parab
SACHIN PARAB
Ìý
New_Hissam_CV (3).PDF
New_Hissam_CV (3).PDFNew_Hissam_CV (3).PDF
New_Hissam_CV (3).PDF
Hissamullah Shah
Ìý
T. Story resume 2016
T. Story resume 2016T. Story resume 2016
T. Story resume 2016
Terrell Story
Ìý
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
Mohideen Sheik Asan
Ìý

Senior Project Engineer

  • 1. Resume: Mechanical Project Engineer; Rushikesh Desai 1 Rushikesh Desai Mechanical project Engineer Email: rndesai123@gmail.com rushi502004@yahoo.co.in +966-535938519 Passport: G 3891080 Current Location: Al Jubail, Eastern Province, Saudi Arabia ------------------------------------------------------------------------------------------------------------------------------ ï‚· CAREER OBJECTIVE Working with Reputed and well established Organization at where I can share and gain Industrial Experience and exposure to enhance the skills ï‚· EDUCATION QUALIFICATION Bachelor in Mechanical Engineering from Gujarat University in Year 2000. ï‚· Technical SKILLS Project Planning, Project Management, People management, Quality system Project concept development, Front end loading, FEED development, Communication plan, engineering coordination, monitoring and controlling, scheduling and costing, manage and handling multi-disciplinary project. ï‚· IT SKILLS: Operating system: MS Office, MS Project. Other Microsoft Office tools, power Point ERP/SAP-MM-: Material Management Module. ERP/SAP-PS-: Project Management Module. (Version 4.6 C) User end PMP: Under preparation
  • 2. Resume: Mechanical Project Engineer; Rushikesh Desai 2 Project Handled:  EPC Projects with Overseas Technology vendor/ Manufacturer/ Process licenser  Local Engineering consultant  Construction contractor  Revamping projects  Up gradation/ modification projects  Green field projects  Brown field projects ï‚· Strength:  Proven track record of effectively and independently managing production related capital and other projects from concept to commissioning, including but not limited to conducting, supervising, and participating in techno-economic feasibilities studies, defining scope and standards, writing of technical specifications for project works, Equipment and materials as per the project’s design, pre- tender, bid evaluation and award recommendation activities, supervision of contractor’s construction related functions and managing contractor’s claims evaluation and post project handover activities.  Experienced in managing planning, monitoring, control, cost, quality, and HSE and risk aspects of projects, including recommending new processes where needed to improve quality, cost or on-time delivery of projects. Ability to recommend proactive management of project scope changes, identifying potential issues and devising contingency plans to address them.  Experienced in undertaking special assignments, studies, surveys, adhoc tasks or evaluation of Company’s existing systems and processes through bench-marking assigned by Management, which may also include chairing/ participating in Company’s committees and task force as and when required. Industrial Experience: Current Employer: Maaden Aluminium Company; from: July 2015-Present Position: Sr. Project Engineer (Refinery Area) Responsibility and Duties:  Develop the Front end loading for production/ quality enhancement or notice of deficiency projects.  Develop business case and participate in project decision review board for project objectives and requirements.
  • 3. Resume: Mechanical Project Engineer; Rushikesh Desai 3  Develop budget estimation and time schedule.  Engage third party to develop engineering scope and design for the project.  Devising Questionnaire and participating in pre-qualification/ evaluation of local and international contractors and vendors.  Follow up to contract for project delivery and project requirements in terms of quality and within time frame.  People management  Coordination with engineering agencies and inter department for project concerns and corrective action.  Monitor and control the project by organizing progress meeting, reporting and addressing issues to relevant agencies for assistance.  Conduct HAZOP/ PHA and RACI Matrix for the project and delegate responsibilities. ï‚· Previous Employer Details: (SABIC)Saudi Basic industries Corporation, Saudi Arabia (2009- 2015) Position: Mechanical Project Engineer Division: (Engineering & Project Management Deptt.) Responsibility and Duties:  Extensive experience in engineering, design, Procurement and construction support.  Interact with Client to understand User’s requirement and define the preliminary scope.  Prepare and finalize project resources and allocation according to project phase.  Identify and allocate project resources and their role and responsibilities.  Coordinate with inter department and external agencies to develop the project Scope, role and responsibility, execution plan and schedule.  Develop project schedule and Budget for the project.  Schedule project meeting for project FEED with client in to understand and finalize the FEED document.  Coordinated workflow within the engineering team, executed mechanical engineering package, reviewed mechanical drawing content, reinforced and promoted quality and safety standards, interfaced with client and vendor engineering staff of projects.  Incorporation of QA/ QC, HSE and construction requirements in FEED.  Review and finalize the FEED Package. Review and Approve the Technical Requisition for Long lead items and Construction scope.  Preparation of ITB document, Define the Delivery schedule and Deliverable list.
  • 4. Resume: Mechanical Project Engineer; Rushikesh Desai 4  Prepare technical Bid analysis and finalize the vendor/ contractor technically for the project.  Follow up with Procurement Department for Issuing of Purchase Order  Conducting the KOM with Successful supplier/ vendor / contractor to elaborate the project scope in details.  Prepare the project preliminary schedule considering long lead and bulk items discipline wise.  Review & Approve the Project Schedule agreed Project schedule.  Ensured successful completion of mechanical deliverables and monitoring of project performance for mechanical tasks, schedules and costs.  Hands on experience in preparation of Technical Requisition for project items and Participate in the bid evaluations.  Managed multiple projects and prioritized with changing requirements.  Experienced with HSE procedures and requirements of the industry.  Well familiar in Planning, organizational and time management abilities. Can work effectively as part of a cohesive team or independently.  Define project performance and guarantee parameters and clauses assuring the project objectives obtained with Legal and Procurement department.  Monitoring and controlling project budget and allocation of resources throughout project life cycle.  Ensure the compliance of contract and follow up for the deliverables. Essar projects India Ltd. (2008-2009) Position: Dy. Project Manager. (Construction) Role and Responsibilities:  Perform Contact administration duties to ensure that consultants, construction and/or EPC contracts are effectively and efficiently administered and that all contractual obligations are provided in timely manner.  Prepare construction activity schedule and arrange and finalize resources for construction Work.  Prepare and review method statement of erection and installation of Equipment and Machines for the Project.  Perform Project Technical duties to plan, coordinate and manage project activities, to ensure that works are implemented safely, to the specified requirement within schedule and in a cost-effective manner and proper inputs from all concerned divisions have been properly address and incorporated.  Conduct Monthly progress meeting with client and contractor and finalize the strategy accordingly.  Coordinate with QA/QC to prepare and finalize the Inspection test plan and Boundary Matrix for the Construction Phase.
  • 5. Resume: Mechanical Project Engineer; Rushikesh Desai 5  Assure the Company HSE requirements and compliance accordingly. Flat Products Equipment India Ltd (EPCM): India (2006-2008) Position: Assistant Manager E&C (Engineering & Construction) Role and Responsibilities:  Perform the day-to-day execution of construction project in order to increase and promote safety and compliance to environmental standards.  Prepare/ review project construction plan.  Participate in engineering meetings to review and feedback on project constructability concerns.  Coordinate with client and contractor to discuss the project schedule and strategy. Prepare protocol for inspection and alignment of equipment and machinery.  Coordinate with planning section on project progress and report to management for any discrepancy in progress and suggestions on improvement.  Develop/review method statement, testing procedure of project tests.  Coordinate with QA and QC for the project quality assurance and compliance.  Supervise and Monitoring the site activity and workman ship of Contractor in order to achieve Quality job and Inspecting of equipment alignment and leveling. Prepare the protocol of alignment and leveling for equipment.  Prepare the pre start up and pre commissioning documents for equipments.  Coordinate with client and contractor to complete the project within time frame.  Conduct periodic construction progress meeting for project progress, safety and concerns if any.  Resolve the project conflicts and supervise the contractor site activity and quality and frequent perform auditing for safe and quality job performed.  Conduct the project progress meeting with contractor and monitor the progress according to agreed schedule.  Participate in project safe walk through for testing and commissioning and prepare punch list.  Follow up to contractor for punch point close out.  Verify the mark up drawing and inform to management for As-builting.
  • 6. Resume: Mechanical Project Engineer; Rushikesh Desai 6 SHAH Alloys Ltd, India (2000-2005) Position: Project Engineer; Client End. Role and Responsibilities:  Participate in project execution strategy and monitor the milestone and project progress accordingly.  Participate in Engineering and design to comply the standards and Project requirements.  Coordinate with Interdepartmental for review project deliverables for each Phase.  Review and verify the method statement of Equipment Installation and for the Machine.  Review and verify the protocol of alignment and inspection of equipment and piping Inline of Approved IFC Drawings.  Monitor and supervise contractor’s job quality and safe work procedures and practice to avoid any unsafe act.  Review and verify the Pre commissioning checklist and Procedures.  Participate in Pre Start up Safety Review and ensuring Safe Commissioning of the Project.  Participate in project meetings and address project concerns related to design, quality and work progress.  Review project testing and commissioning procedure and test plans and witness of.  Participate in project walkthrough and ensure punch points closing prior to test.  Coordinate with documentation for project documents and drawings. ï‚· Personal Detail: Full Name : Rushikesh Natvarlal Desai Permanent Address : Rajkawada, Ramsheri, Opp. Ghanchi wadi Patan (N.G.)-384265 Contact Details : (R) +91-2766-227192(India) (M)+966-535938519(Saudi Arabia) Marital Status : Married Total Experience : 16 Years Current Location : Al Jubail City, Saudi Arabia Nationality : Indian Skype ID : desaird