Rajesh Kumar Mahana has over 8 years of experience in hydrodynamic and sediment transport modeling using software like Mike 11, Mike 21C, Mike Flood, HEC-RAS, HEC-HMS, and HEC-SSP. He has extensive experience modeling reservoir sedimentation, flood inundation, river morphology, and dam break scenarios. Some of his major projects include preparation of a master plan for flood and sediment management of the Kosi River basin in Bihar, India; flood inundation modeling of the Adhiya River Flood Protection project in Gujarat, India; and mathematical modeling of reservoir sedimentation for hydropower projects in Bhutan, Jammu and Kashmir, and Himach
1 of 1
More Related Content
Short CV-Rajesh
1. Rajesh Kumar Mahana (M. Tech, Water Resources, IIT Kharagpur)
Mr. Mahana has extensive experience in hydrodynamic and Sediment Transport modelling, both one and two
dimensional, including hydrological and hydraulics analysis for more than 8 years. He had been involved in many
consultancy projects involving estimation of High Flood Levels (HFL), flood inundation simulation, River
morphology and Reservoir sedimentation modelling and dam break modelling, water availability analysis and
rainfall-runoff modelling, design flood estimation (PMF, SPF and different return period) using the state of art
approach like hydro-meteorological and flood frequency approach. Mr. Mahana was involved in mathematical
modelling of reservoir sedimentation of Kuri-1 Hydro-electric project (Bhutan), Thana Plaun HEP on Beas River
in Himachal Pradesh, Upper Karnali HEP, Nepal, Kirthai-I HEP, J&K, Morphological study of Vansadhara river,
Odisha, Flood inundation modelling of Adhiya River Flood protection project in Gujarat, preparation of master
plan for flood and sediment management of Kosi river basin, setting up the 1D and 2D Flood hydrodynamic and
flood forecasting including inundation mapping models, setting up 1D and 2D morphological sediment transport
models, calibrating and validating the established models using historical data etc. He has well versed in
softwares like Mike 11, Mike 21C, Mike Flood, HEC RAS, HEC HMS, HEC SSP etc.
Few Major Assignment
Name of assignment or project: Preparation of Master Plan for Flood and Sediment Management of Kosi
River Basin, Year: 2015 – 2016, Client: FMISC, Govt of Bihar. Position & Activities: Morphological Modeller - 1D
& 2D Hydrodynamic model and Sediment Transport model (Mike 11 & Mike 21C) set up and analysis.
Name of assignment or project: Consultancy services for Adhiya River Flood Protection for DSIR region.
Client: GICC, Gujarat. Positions & Activities: Water Resources Engineer/Modeller - Data Analysis, river
hydrology, channel design and flood inundation modelling using Mike Flood, Client meetings.
Name of assignment or project: Mathematical Model Study for Reservoir Sedimentation Study of Kuri-1 HEP,
Bhutan. Client: DGPC, Bhutan. Position & Activities: Water Resources Engineer/ Modeller – Reservoir
Sedimentation study using Mike 11 and Mike 21C, Client meetings and presentations.
Name of assignment or project: Mathematical Model Study for Reservoir Sedimentation Study of Kirthai-1
HEP, J&K. Client: J&K Power Corporation Ltd. Position & Activities: Water Resources Engineer/ Modeller –
Reservoir Sedimentation study using Mike 11 and Mike 21C, Client meetings and presentations.
Name of assignment or project: Mathematical Model Study for Reservoir Sedimentation Study of Thana Plaun
HEP on Beas River in HP, India. Client: HPPCL. Position & Activities: Morphological Modeller: – Reservoir
sedimentation study using Mike 11 and Mike 21C, estimation of life of reservoir, Client meetings.
Name of assignment or project: Morphological Study for Vansadhara River using Mike 21C Software. Client:
WRD, Govt. of Odisha, Positions & Activities: Morphological Modeller/Water Resources Engineer - Data
Analysis, MIKE 21C Model setup for hydrodynamic and sediment transport, Client meetings.
Name of assignment or project: Consultancy Services for Sediment Modelling Study of Upper Karnali Hydro-
electric Project. Client: GMR Group, India, Position & Activities: Water Resources Engineer/Modeller - Data
Analysis, MIKE 11 Model setup for hydrodynamic and sediment transport modelling,
Name of assignment or project: Lots of hydropower projects for hydrological Study including water availability,
design flood estimation, sedimentation etc. Like Pare (110 MW), Etalin HEP (3197MW), Attunli HEP (680MW),
Hutong-II (1250MW), Subansiri Middle (1600 MW), Bhasmey (54 MW), Sikkim Birahi Ganga (Stage I) (24 MW),
Kabu 16 (20 MW) HEP, Africa, Super Trishuli (40MW) HEP, Nepal etc to name a few. Position & Activities: Dy.
Manager (Hydrology & Hydraulics) – Detailed Hydrological study and technical Due-diligence, CWC clearance, dam
break and sediment modelling using HEC-RAS, rainfall-runoff and design flood estimation using HEC-HMS & HEC-
SSP, client meetings and presentations etc.