際際滷

際際滷Share a Scribd company logo
Smart grid final presentation
≒≒University of and Years Study
    Designing  Preparation
     EnergyHub Washington
     Methodology Surveys
      Phase 1 Next
  Residence  Deployment
    Managing Hall EnergyStudy
     Quantitative Data
      Phase 2 Next Years
  ConservationData Collection
      Phase 3  Study
     Qualitative Data
 ≒Project Partners
      EnergyHubs
     Data Analysis Role
 ≒Pilot Study  Device Collection
      Phase 4
      and Project Completion
Smart grid final presentation
Smart grid final presentation
Elm Hall                                   Poplar Hall
                                                Floor 6

   Floor 3                                      Floor 5
                  Floor-by-Floor
   Floor 2          Energy Use                  Floor 4

                                                Floor 3



                *Both the Pilot Study and
                Continuing Study involve
                these two Residence Halls
Energy Hub                                     Dashboard
(Individuals)                                   (Group)
Elm Hall               Poplar Hall
   6 Floors
   Resident capacity 533
   Adjoining bathrooms
   Individual thermostats
Elm Hall                                   Poplar Hall

An energy monitoring system that allows individuals to view and control their
energy use.
    System Components:
         Power Strip                      Website
         Outlets                          Smart Phone
         Dashboard                        Application
         Thermostat (Not Used
         in the Study)
Elm Hall   Poplar Hall


                   7 Floors
                   Resident Capacity 271
                   Adjoining bathrooms
                   Individual thermostats
Elm Hall              Poplar Hall



           A group energy monitoring system that
           displays aggregated floor data on monitors
           and online.

           Will use educational materials to influence
           group behavior
Smart grid final presentation
Elm Hall       Poplar Hall

Quantitative    Qualitative
Elm Hall                   Poplar Hall

Quantitative   Energy Use
                 Measuring Energy Use

                 EnergyHub Device

                 Floor-by-Floor
Elm Hall            Poplar Hall


Surveys                Qualitative
 Demographics

 Attitudes

 Personal Behavior

 EnergyHub Use
Elm Hall       Poplar Hall

Quantitative    Qualitative
Smart grid final presentation

    
    
    



Elm Hall (Floor)   Opt-In    Opted-In/Did   Opt-Out   Total
                              Not Set-Up
        3            39          21           73      112
                   (34.8%)     (18.8%)      (65.2%)
        4            66          37           38      104
                   (63.4%)     (35.6%)      (36.5%)
Smart grid final presentation
Smart grid final presentation

                      
                      
           
           
           




                              
Phase 1   Phase 2   Phase 3   EnergyHub   Phase 4



                        
          

                    


                                  
Phase 1   Phase 2       Phase 3       EnergyHub   Phase 4
Phase 1
Phase 2




            
                 
                 
  Phase 3




            
            
EnergyHub




                                 Week 1 average    Week 2 average    Week 3 average    Week 4 average

            Target floors Elm             88 kWh            83 kWh            85 kWh            80 kWh

            Control floors Elm            88 kWh           87 kWh             89 kWh            89 kWh
Phase 4




            Difference                        0%               -5%               -5%              -10%

          
          
          
Phase 1   Phase 2   Phase 3   EnergyHub   Phase 4

          
          
          
Phase 1   Phase 2   Phase 3   EnergyHub   Phase 4
Smart grid final presentation

More Related Content

Smart grid final presentation

  • 2. ≒≒University of and Years Study Designing Preparation EnergyHub Washington Methodology Surveys Phase 1 Next Residence Deployment Managing Hall EnergyStudy Quantitative Data Phase 2 Next Years ConservationData Collection Phase 3 Study Qualitative Data ≒Project Partners EnergyHubs Data Analysis Role ≒Pilot Study Device Collection Phase 4 and Project Completion
  • 4.
  • 5.
  • 7. Elm Hall Poplar Hall Floor 6 Floor 3 Floor 5 Floor-by-Floor Floor 2 Energy Use Floor 4 Floor 3 *Both the Pilot Study and Continuing Study involve these two Residence Halls Energy Hub Dashboard (Individuals) (Group)
  • 8. Elm Hall Poplar Hall 6 Floors Resident capacity 533 Adjoining bathrooms Individual thermostats
  • 9. Elm Hall Poplar Hall An energy monitoring system that allows individuals to view and control their energy use. System Components: Power Strip Website Outlets Smart Phone Dashboard Application Thermostat (Not Used in the Study)
  • 10. Elm Hall Poplar Hall 7 Floors Resident Capacity 271 Adjoining bathrooms Individual thermostats
  • 11. Elm Hall Poplar Hall A group energy monitoring system that displays aggregated floor data on monitors and online. Will use educational materials to influence group behavior
  • 13. Elm Hall Poplar Hall Quantitative Qualitative
  • 14. Elm Hall Poplar Hall Quantitative Energy Use Measuring Energy Use EnergyHub Device Floor-by-Floor
  • 15. Elm Hall Poplar Hall Surveys Qualitative Demographics Attitudes Personal Behavior EnergyHub Use
  • 16. Elm Hall Poplar Hall Quantitative Qualitative
  • 18. Elm Hall (Floor) Opt-In Opted-In/Did Opt-Out Total Not Set-Up 3 39 21 73 112 (34.8%) (18.8%) (65.2%) 4 66 37 38 104 (63.4%) (35.6%) (36.5%)
  • 20.
  • 21.
  • 23. Phase 1 Phase 2 Phase 3 EnergyHub Phase 4
  • 24. Phase 1 Phase 2 Phase 3 EnergyHub Phase 4
  • 25. Phase 1 Phase 2 Phase 3 EnergyHub Week 1 average Week 2 average Week 3 average Week 4 average Target floors Elm 88 kWh 83 kWh 85 kWh 80 kWh Control floors Elm 88 kWh 87 kWh 89 kWh 89 kWh Phase 4 Difference 0% -5% -5% -10%
  • 26. Phase 1 Phase 2 Phase 3 EnergyHub Phase 4
  • 27. Phase 1 Phase 2 Phase 3 EnergyHub Phase 4