Standard Minute Value: SMV in Garments, Calculation,
Importance
The term Standard Minute Value  SMV is mostly used in the garments industry. It is a process of
time study and measure standard minute and then calculates the SMV. The calculation of SMV is
actually done by the Industrial Engineer. Generally, SMV indicates the time taken to make garments
by the workers using the right types of machinery. In the garments factory, you may find that many
people used to the SAM  Standard Allowed Minute which is the same as SMV. SMV varies
garments to garments, style to style, factory to factory. Management and buyers ask for SMV and it is
the responsibility of the IE department to calculate SMV and give it to the respective parties. Here in
this article, I will share details of Standard Minute Value: SMV in Garments, Calculation, Importance
with a practical example.
Standard Minute Value: SMV in Garments, Calculation, Importance
Industrial Engineering is concerned with the design, improvement, and installation of an integrated
system of men, machinery, and materials. SMV is one of the most important tools used by IE.
The Main Objective of Industrial Engineering
 To Increase Productivity
 To eliminate waste and non-value added activities
 To come up with the optimum use of scarce resources that would bring out the best results.
Importance of SMV in the Apparel Industry
The reason Why we use SMV in Garments Factory is given below
 SMV is calculated for doing costing of garments
 It is used for calculation of target and set the right target
 For Calculating the Efficiency of workers
 SMV is calculated for making a plan and take effective factory production decisions.
For Calculating SMV  Standard Minute Value in Garments you must have a proper idea of machine
operating procedure and working process of workers. Close observation of Industrial Engineer is
required to calculate the right SMV for a particular product or style in your factory.
Basically, SMV is the sum of the basic time requirement and allowance applicable to it. Normally
allowance is given at the rate of 10% based on efficiency.
Formulas of Calculating SMV
Calculation of SMV in Garments
SMV = (Basic Time + Allocated Allowance)
The formula of Basic Time = Observe Time x Rating Factor
Basic Time
Basic time is the most likely time required to make garments considering observe time and applicable
rating factors.
Observe Time
Time is taken to do work when an observer is observing closely and record the workers work speed.
Calculation of Observe Time = Total Cycle Time is divided by Number of Cycle
Cycle Time
Cycle Time is the time between starting a garment manufacturing and finishing of those garments.
Rating Factor
The rating factor is assigned based on an evaluation of worker performance which is conducted
through eye judgment. A worker can be fast, slow and rating is on a scale of 100% to lower.
Costing SMV is calculated for sending SMV information to buyers. Normally 5% additional time is
added with the actual SMV.
Costing SMV = Actual SMV + (Actual SMV x 5%)
Example of Calculation of SMV in Garments
Suppose for making a product the following assumption is there
 Observe Time = 25 Minutes
 Rating of Operator = 80%
 Considering Allowance = 10%
 Basic Time = 25minutes x 80% = 20 minutes
 Allowance = 20 x 10% = 2 Minute
So, SMV = 20 minutes + 2 minutes = 22 minutes for making a particular garments product
SMV Calculator
You can use the following calculator to quickly calculate the SMV of garments.
Input
Observe Time*
Rating Factor*
Allowance*
Output
Standard Minute Value (SMV)
Calculation of Capacity of Single Operator in Garments
 If an operator works for 10 hours a day
 30 minutes to make a product
Capacity = (1 operator x 10 hours x 60 minutes)/30 Minutes = 20 Pieces of Garments by an operator
If you assign 100 operators then your capacity will be = 100 operators x 20 pieces = 2000 pieces a
day
Calculation of Efficiency Percent
 SMV 22 Minutes
 Working Hours 10 a Day
 Number of Operators 100 person
 Actual Production 2000 pieces
Efficiency (%) = (2000 pieces x 22 minute)/(100 operators x 10 hours x 60 minutes) x 100 = 73.33%
whereas,
Target = (10 hours x 60 minutes x 100 operators)/smv 22 minutes = 2727 Pieces of garments
Ad

Recommended

Project Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
Amanuzzaman Aman
All in 1 IE
All in 1 IE
shakil tutul
Sewing line setting
Sewing line setting
SharifulHasan9
Calculation of standard minute value of T shirt
Calculation of standard minute value of T shirt
Azmir Latif Beg
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
Khairul Bashar
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floor
Rakibul Hasan
Presentation on time study of apparel industry
Presentation on time study of apparel industry
Tanmoy Antu
Capacity Planning In Garments Industry
Capacity Planning In Garments Industry
Shohag Ahammed
industrial engineering in sewing department
industrial engineering in sewing department
ShivamSagar13
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
Ariful Islam
Work study presentation
Work study presentation
Md. Mazadul Hasan Shishir
Line Balancing In Garments Industry
Line Balancing In Garments Industry
Md. Mazadul Hasan Shishir
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
Ankur Shukla
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a Garment
K.K.T Madhusanka
Garments costing
Garments costing
Khairul Bashar
IE Qu & Ans
IE Qu & Ans
shakil tutul
SMV & Benefits
SMV & Benefits
爨爭爨 爨爭爨萎爨鉦Θ 爨爨爭爨爨逗Θ 爨爭爭爭爨
Garment Merchandising 油
Garment Merchandising 油
Azmir Latif Beg
Consumption & costing of Apparels
Consumption & costing of Apparels
SAMultimedia
IE working procedure
IE working procedure
Safayet Dishan
Handbook of garments manufacturing technology
Handbook of garments manufacturing technology
Md. Mazadul Hasan Shishir
Garments related abbreviations
Garments related abbreviations
Bangladeshi Bangladeshi
Garment manufacturing process: from fabric to finished apparel products
Garment manufacturing process: from fabric to finished apparel products
Prasanta Sarkar
How to Improve Productivity
How to Improve Productivity
Sunjib Anwar; MBA,SCSS
Garment technology
Garment technology
nistha chandela
Work study
Work study
Saifur Rahman
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
Mazharul Islam
Sampling .presentration
Sampling .presentration
ahad003
Lets understand what are SAM and SMV
Lets understand what are SAM and SMV
ThreadSol
SMV VS CYCLE TIME
SMV VS CYCLE TIME
Liton Ahmed

More Related Content

What's hot (20)

industrial engineering in sewing department
industrial engineering in sewing department
ShivamSagar13
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
Ariful Islam
Work study presentation
Work study presentation
Md. Mazadul Hasan Shishir
Line Balancing In Garments Industry
Line Balancing In Garments Industry
Md. Mazadul Hasan Shishir
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
Ankur Shukla
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a Garment
K.K.T Madhusanka
Garments costing
Garments costing
Khairul Bashar
IE Qu & Ans
IE Qu & Ans
shakil tutul
SMV & Benefits
SMV & Benefits
爨爭爨 爨爭爨萎爨鉦Θ 爨爨爭爨爨逗Θ 爨爭爭爭爨
Garment Merchandising 油
Garment Merchandising 油
Azmir Latif Beg
Consumption & costing of Apparels
Consumption & costing of Apparels
SAMultimedia
IE working procedure
IE working procedure
Safayet Dishan
Handbook of garments manufacturing technology
Handbook of garments manufacturing technology
Md. Mazadul Hasan Shishir
Garments related abbreviations
Garments related abbreviations
Bangladeshi Bangladeshi
Garment manufacturing process: from fabric to finished apparel products
Garment manufacturing process: from fabric to finished apparel products
Prasanta Sarkar
How to Improve Productivity
How to Improve Productivity
Sunjib Anwar; MBA,SCSS
Garment technology
Garment technology
nistha chandela
Work study
Work study
Saifur Rahman
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
Mazharul Islam
Sampling .presentration
Sampling .presentration
ahad003
industrial engineering in sewing department
industrial engineering in sewing department
ShivamSagar13
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
Ariful Islam
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
Ankur Shukla
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a Garment
K.K.T Madhusanka
Garment Merchandising 油
Garment Merchandising 油
Azmir Latif Beg
Consumption & costing of Apparels
Consumption & costing of Apparels
SAMultimedia
IE working procedure
IE working procedure
Safayet Dishan
Handbook of garments manufacturing technology
Handbook of garments manufacturing technology
Md. Mazadul Hasan Shishir
Garment manufacturing process: from fabric to finished apparel products
Garment manufacturing process: from fabric to finished apparel products
Prasanta Sarkar
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
Mazharul Islam
Sampling .presentration
Sampling .presentration
ahad003

Similar to Smv (16)

Lets understand what are SAM and SMV
Lets understand what are SAM and SMV
ThreadSol
SMV VS CYCLE TIME
SMV VS CYCLE TIME
Liton Ahmed
Finishing section training module for r&d
Finishing section training module for r&d
md.najmul huda hemel
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
Line balancing
Line balancing
Md. Mazadul Hasan Shishir
Common terms in garmetns industry
Common terms in garmetns industry
azmatzubair
Operation bulletin of dungaree
Operation bulletin of dungaree
ShamimaAkter41
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
MdRakibHasan27
Garment Industries Industrial Engineering
Garment Industries Industrial Engineering
sanjeevSingla10
To estimate the standard minute value (SMV) of a polo shirt by work study
To estimate the standard minute value (SMV) of a polo shirt by work study
Shyamoli Textile Engineering College
Common terms in garmetns industry
Common terms in garmetns industry
Azmat Zubair
Introduction to Work Study .ppt
Introduction to Work Study .ppt
AryaRukmana1
IE TECHNICAL TRAINING.pptx
IE TECHNICAL TRAINING.pptx
babu947412
Effect of time and motion study
Effect of time and motion study
Ankur Shukla
Effect of time and motion study
Effect of time and motion study
Ankur Shukla
Garments Supervisor Soft skill
Garments Supervisor Soft skill
Ariful Haque milon
Lets understand what are SAM and SMV
Lets understand what are SAM and SMV
ThreadSol
SMV VS CYCLE TIME
SMV VS CYCLE TIME
Liton Ahmed
Finishing section training module for r&d
Finishing section training module for r&d
md.najmul huda hemel
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
Common terms in garmetns industry
Common terms in garmetns industry
azmatzubair
Operation bulletin of dungaree
Operation bulletin of dungaree
ShamimaAkter41
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
MdRakibHasan27
Garment Industries Industrial Engineering
Garment Industries Industrial Engineering
sanjeevSingla10
To estimate the standard minute value (SMV) of a polo shirt by work study
To estimate the standard minute value (SMV) of a polo shirt by work study
Shyamoli Textile Engineering College
Common terms in garmetns industry
Common terms in garmetns industry
Azmat Zubair
Introduction to Work Study .ppt
Introduction to Work Study .ppt
AryaRukmana1
IE TECHNICAL TRAINING.pptx
IE TECHNICAL TRAINING.pptx
babu947412
Effect of time and motion study
Effect of time and motion study
Ankur Shukla
Effect of time and motion study
Effect of time and motion study
Ankur Shukla
Garments Supervisor Soft skill
Garments Supervisor Soft skill
Ariful Haque milon
Ad

Recently uploaded (20)

Deep Learning for Image Processing on 16 June 2025 MITS.pptx
Deep Learning for Image Processing on 16 June 2025 MITS.pptx
resming1
Complete University of Calculus :: 2nd edition
Complete University of Calculus :: 2nd edition
Shabista Imam
May 2025: Top 10 Read Articles in Data Mining & Knowledge Management Process
May 2025: Top 10 Read Articles in Data Mining & Knowledge Management Process
IJDKP
Abraham Silberschatz-Operating System Concepts (9th,2012.12).pdf
Abraham Silberschatz-Operating System Concepts (9th,2012.12).pdf
Shabista Imam
362 Alec Data Center Solutions-Slysium Data Center-AUH-Adaptaflex.pdf
362 Alec Data Center Solutions-Slysium Data Center-AUH-Adaptaflex.pdf
djiceramil
Fundamentals of Digital Design_Class_21st May - Copy.pptx
Fundamentals of Digital Design_Class_21st May - Copy.pptx
drdebarshi1993
Solar thermal Flat plate and concentrating collectors .pptx
Solar thermal Flat plate and concentrating collectors .pptx
jdaniabraham1
special_edition_using_visual_foxpro_6.pdf
special_edition_using_visual_foxpro_6.pdf
Shabista Imam
DESIGN OF REINFORCED CONCRETE ELEMENTS S
DESIGN OF REINFORCED CONCRETE ELEMENTS S
prabhusp8
(Continuous Integration and Continuous Deployment/Delivery) is a fundamental ...
(Continuous Integration and Continuous Deployment/Delivery) is a fundamental ...
ketan09101
Structural Wonderers_new and ancient.pptx
Structural Wonderers_new and ancient.pptx
nikopapa113
Rapid Prototyping for XR: Lecture 6 - AI for Prototyping and Research Directi...
Rapid Prototyping for XR: Lecture 6 - AI for Prototyping and Research Directi...
Mark Billinghurst
Industrial internet of things IOT Week-3.pptx
Industrial internet of things IOT Week-3.pptx
KNaveenKumarECE
Learning Types of Machine Learning Supervised Learning Unsupervised UNI...
Learning Types of Machine Learning Supervised Learning Unsupervised UNI...
23Q95A6706
Microwatt: Open Tiny Core, Big Possibilities
Microwatt: Open Tiny Core, Big Possibilities
IBM
Mechanical Vibration_MIC 202_iit roorkee.pdf
Mechanical Vibration_MIC 202_iit roorkee.pdf
isahiliitr
How to Un-Obsolete Your Legacy Keypad Design
How to Un-Obsolete Your Legacy Keypad Design
Epec Engineered Technologies
Modern multi-proposer consensus implementations
Modern multi-proposer consensus implementations
Fran巽ois Garillot
Tally.ERP 9 at a Glance.book - Tally Solutions .pdf
Tally.ERP 9 at a Glance.book - Tally Solutions .pdf
Shabista Imam
362 Alec Data Center Solutions-Slysium Data Center-AUH-Adaptaflex.pdf
362 Alec Data Center Solutions-Slysium Data Center-AUH-Adaptaflex.pdf
djiceramil
Deep Learning for Image Processing on 16 June 2025 MITS.pptx
Deep Learning for Image Processing on 16 June 2025 MITS.pptx
resming1
Complete University of Calculus :: 2nd edition
Complete University of Calculus :: 2nd edition
Shabista Imam
May 2025: Top 10 Read Articles in Data Mining & Knowledge Management Process
May 2025: Top 10 Read Articles in Data Mining & Knowledge Management Process
IJDKP
Abraham Silberschatz-Operating System Concepts (9th,2012.12).pdf
Abraham Silberschatz-Operating System Concepts (9th,2012.12).pdf
Shabista Imam
362 Alec Data Center Solutions-Slysium Data Center-AUH-Adaptaflex.pdf
362 Alec Data Center Solutions-Slysium Data Center-AUH-Adaptaflex.pdf
djiceramil
Fundamentals of Digital Design_Class_21st May - Copy.pptx
Fundamentals of Digital Design_Class_21st May - Copy.pptx
drdebarshi1993
Solar thermal Flat plate and concentrating collectors .pptx
Solar thermal Flat plate and concentrating collectors .pptx
jdaniabraham1
special_edition_using_visual_foxpro_6.pdf
special_edition_using_visual_foxpro_6.pdf
Shabista Imam
DESIGN OF REINFORCED CONCRETE ELEMENTS S
DESIGN OF REINFORCED CONCRETE ELEMENTS S
prabhusp8
(Continuous Integration and Continuous Deployment/Delivery) is a fundamental ...
(Continuous Integration and Continuous Deployment/Delivery) is a fundamental ...
ketan09101
Structural Wonderers_new and ancient.pptx
Structural Wonderers_new and ancient.pptx
nikopapa113
Rapid Prototyping for XR: Lecture 6 - AI for Prototyping and Research Directi...
Rapid Prototyping for XR: Lecture 6 - AI for Prototyping and Research Directi...
Mark Billinghurst
Industrial internet of things IOT Week-3.pptx
Industrial internet of things IOT Week-3.pptx
KNaveenKumarECE
Learning Types of Machine Learning Supervised Learning Unsupervised UNI...
Learning Types of Machine Learning Supervised Learning Unsupervised UNI...
23Q95A6706
Microwatt: Open Tiny Core, Big Possibilities
Microwatt: Open Tiny Core, Big Possibilities
IBM
Mechanical Vibration_MIC 202_iit roorkee.pdf
Mechanical Vibration_MIC 202_iit roorkee.pdf
isahiliitr
Modern multi-proposer consensus implementations
Modern multi-proposer consensus implementations
Fran巽ois Garillot
Tally.ERP 9 at a Glance.book - Tally Solutions .pdf
Tally.ERP 9 at a Glance.book - Tally Solutions .pdf
Shabista Imam
362 Alec Data Center Solutions-Slysium Data Center-AUH-Adaptaflex.pdf
362 Alec Data Center Solutions-Slysium Data Center-AUH-Adaptaflex.pdf
djiceramil
Ad

Smv

  • 1. Standard Minute Value: SMV in Garments, Calculation, Importance The term Standard Minute Value SMV is mostly used in the garments industry. It is a process of time study and measure standard minute and then calculates the SMV. The calculation of SMV is actually done by the Industrial Engineer. Generally, SMV indicates the time taken to make garments by the workers using the right types of machinery. In the garments factory, you may find that many people used to the SAM Standard Allowed Minute which is the same as SMV. SMV varies garments to garments, style to style, factory to factory. Management and buyers ask for SMV and it is the responsibility of the IE department to calculate SMV and give it to the respective parties. Here in this article, I will share details of Standard Minute Value: SMV in Garments, Calculation, Importance with a practical example. Standard Minute Value: SMV in Garments, Calculation, Importance Industrial Engineering is concerned with the design, improvement, and installation of an integrated system of men, machinery, and materials. SMV is one of the most important tools used by IE. The Main Objective of Industrial Engineering To Increase Productivity To eliminate waste and non-value added activities To come up with the optimum use of scarce resources that would bring out the best results. Importance of SMV in the Apparel Industry The reason Why we use SMV in Garments Factory is given below SMV is calculated for doing costing of garments It is used for calculation of target and set the right target For Calculating the Efficiency of workers SMV is calculated for making a plan and take effective factory production decisions.
  • 2. For Calculating SMV Standard Minute Value in Garments you must have a proper idea of machine operating procedure and working process of workers. Close observation of Industrial Engineer is required to calculate the right SMV for a particular product or style in your factory. Basically, SMV is the sum of the basic time requirement and allowance applicable to it. Normally allowance is given at the rate of 10% based on efficiency. Formulas of Calculating SMV Calculation of SMV in Garments SMV = (Basic Time + Allocated Allowance) The formula of Basic Time = Observe Time x Rating Factor Basic Time Basic time is the most likely time required to make garments considering observe time and applicable rating factors. Observe Time Time is taken to do work when an observer is observing closely and record the workers work speed. Calculation of Observe Time = Total Cycle Time is divided by Number of Cycle Cycle Time Cycle Time is the time between starting a garment manufacturing and finishing of those garments. Rating Factor
  • 3. The rating factor is assigned based on an evaluation of worker performance which is conducted through eye judgment. A worker can be fast, slow and rating is on a scale of 100% to lower. Costing SMV is calculated for sending SMV information to buyers. Normally 5% additional time is added with the actual SMV. Costing SMV = Actual SMV + (Actual SMV x 5%) Example of Calculation of SMV in Garments Suppose for making a product the following assumption is there Observe Time = 25 Minutes Rating of Operator = 80% Considering Allowance = 10% Basic Time = 25minutes x 80% = 20 minutes Allowance = 20 x 10% = 2 Minute So, SMV = 20 minutes + 2 minutes = 22 minutes for making a particular garments product SMV Calculator You can use the following calculator to quickly calculate the SMV of garments. Input Observe Time* Rating Factor* Allowance* Output Standard Minute Value (SMV) Calculation of Capacity of Single Operator in Garments If an operator works for 10 hours a day 30 minutes to make a product Capacity = (1 operator x 10 hours x 60 minutes)/30 Minutes = 20 Pieces of Garments by an operator If you assign 100 operators then your capacity will be = 100 operators x 20 pieces = 2000 pieces a day Calculation of Efficiency Percent SMV 22 Minutes Working Hours 10 a Day Number of Operators 100 person
  • 4. Actual Production 2000 pieces Efficiency (%) = (2000 pieces x 22 minute)/(100 operators x 10 hours x 60 minutes) x 100 = 73.33% whereas, Target = (10 hours x 60 minutes x 100 operators)/smv 22 minutes = 2727 Pieces of garments