ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Standard Operating Procedure
Title: Warehouse - Processing Issues, Returns and Rejects
______________________________________________________________________________________
            1.3.3. Use the forklift to retrieve the pallet located in the storage bin.
                 1.4.4.      Inspect each material to ensure the information on the goods corresponds to the
                             Material code, Description and Laboratory Batch no. written on the Transfer Order
                             Form. Take enough material from the source pallet to at least cover the quantity
                             required for the issue. NEVER undersupply production with materials, unless
                             Production has agreed.
                 1.4.5.    Using a Black marker, write the quantity removed from the source pallet on the
                            ISSUE column of the Bin Sheet (Form-020). Then calculate the quantity remaining
                           on the pallet and write the new quantity in the BALANCE column of the bin sheet.
                           The updated Bin sheet is then placed back onto pallet.
                 1.4.6.    Write down the quantity taken and pallet no. on the Issue for Production Form (Form-
                           030) using a Blue or Black pen. Leave the checked section blank for authorised
                           person to check and Initial.
                 1.4.7.    Put the remaining goods back into the original location.
                 1.4.8.    Repeat steps 1.4.1. to 1.4.7. until the Transfer Order Form is complete.
                 1.4.9.    Ensure the complete issue is very stable and is not overhanging the slip-sheet or
                           pallet. Note: Ensure all goods are free of dust and dirt, before sending into production.
                 1.4.10. When the requested Issue have been completed for a line, the component assembler
                         (Warehouse Store person) will give a count, write down the source and destination
                         Storage type and Storage bin, Reference GRS number of each material collected
                         form the warehouse GRS filing cabinet. The number of pallets used to complete the
                         issue is also added next to the initials on the Transfer Orders.
                 1.4.11. An Issue For Production form (Form-030) is fully filled up including the Process Line,
                         Person who requested goods through the Transfer Order, Date, Time materials
                         required, Batch Production Number, and the Number of the Pallet/s, (e.g. 1 of 3.).
                 1.4.12. Every Issue is to be checked by an authorised Store person before delivery into
                         production. The assembler will sign and date at the top section of TO and sign in the
                          Assembled By section. The checker will sign and initial on the Checked By
                         section of the TO and write a Y next to CHECKED on the Issue for Production
                         Form with a black marker. The authorized checker will then attach the Issue for
                         Production Form/s on all the pallets involved in the issue.
                 1.4.13. Place the completed Transfer Order into the Issues to be checked and confirmed
                         tray. One copy of the completed Transfer Order goes with the goods. The original
                         Transfer Order will be kept in the warehouse for filing. These MTO will be needed for
                         periodic inventory count. Issue For Production form will go with the pallets. Bin sheet
                         will stay with the sourced pallet/s.
                           Note: All raw materials will be dispensed through Intermediate Bulk Containers
                           (IBC) by the Dispensary. (i.e. imported bulk tablets)

2.        Issues of Production Consumables (Non Component Goods)
                   Production consumables are materials that are used in the production process, but not
                   directly with a particular BPN, such as cleaning cloths, sterile latex gloves, cleaning
                   solutions, and many more. Non component goods are transferred to the production
                   according to WAR-005 section 2.2.


3.        Materials Return From Production
          This is a brief rundown to what Production Operators do for the return of materials:
          3.1.     When returning Material/s from Production to Warehouse (PW-BS), or from Production to
                   Interim production area (PW-IP), an accurate count of the amount returned should be
                   obtained. Any partial boxes to be returned should carry a PARTIAL sticker.




This is not an approved copy unless stamped in red
File Location:                                          Date Printed:                           Page 4 of 7

More Related Content

Similar to Sop (20)

Documentation in Pharmaceutical Industry
Documentation in Pharmaceutical IndustryDocumentation in Pharmaceutical Industry
Documentation in Pharmaceutical Industry
Pooja Harkal
Ìý
iso 9001 2008 Downstairs QC 9-2-15
iso 9001 2008 Downstairs QC  9-2-15 iso 9001 2008 Downstairs QC  9-2-15
iso 9001 2008 Downstairs QC 9-2-15
MICHAEL MORGAN
Ìý
Eresource nfra stores modulet
Eresource nfra stores moduletEresource nfra stores modulet
Eresource nfra stores modulet
eresourceerpuae
Ìý
UG_Receiving-OF_ESAB
UG_Receiving-OF_ESABUG_Receiving-OF_ESAB
UG_Receiving-OF_ESAB
Deb Martina
Ìý
PROCUREMENT
PROCUREMENTPROCUREMENT
PROCUREMENT
A.B.M RAZIKUR RAHMAN RAZIK
Ìý
Advanced inventory in tally erp 9
Advanced inventory in tally erp 9Advanced inventory in tally erp 9
Advanced inventory in tally erp 9
Accounts Arabia
Ìý
Documentation in pharmaceutical industry
Documentation in pharmaceutical industryDocumentation in pharmaceutical industry
Documentation in pharmaceutical industry
Pooja Harkal
Ìý
7 advanced inventory
7 advanced inventory7 advanced inventory
7 advanced inventory
MD. Monzurul Karim Shanchay
Ìý
Job-Order-Costing for the best ptt and making
Job-Order-Costing for the best ptt and makingJob-Order-Costing for the best ptt and making
Job-Order-Costing for the best ptt and making
macepe1
Ìý
SAP SD Training in Chennai Demo Part-4
SAP SD Training in Chennai Demo Part-4SAP SD Training in Chennai Demo Part-4
SAP SD Training in Chennai Demo Part-4
Thecreating Experts
Ìý
Stock transfer using stock transport order
Stock transfer using stock transport orderStock transfer using stock transport order
Stock transfer using stock transport order
Santhana Kishore
Ìý
Altec Core Yard Concepts
Altec Core Yard ConceptsAltec Core Yard Concepts
Altec Core Yard Concepts
metacomputer
Ìý
Altec Core Yard Concepts
Altec Core Yard ConceptsAltec Core Yard Concepts
Altec Core Yard Concepts
metacomputer
Ìý
Case study for business optimization of a paper distribution company
Case study for business optimization of a paper distribution companyCase study for business optimization of a paper distribution company
Case study for business optimization of a paper distribution company
Vivek Kedia
Ìý
FIRST ARTICLE INSPECTION
FIRST ARTICLE INSPECTIONFIRST ARTICLE INSPECTION
FIRST ARTICLE INSPECTION
Hindustan Aeronautics Limited
Ìý
Operations management
Operations managementOperations management
Operations management
Bharti Kumari
Ìý
Procedures in receiving and storing tools and materials
Procedures in receiving and storing tools and materialsProcedures in receiving and storing tools and materials
Procedures in receiving and storing tools and materials
Lynette Alcaide
Ìý
Order inventorysolution
Order inventorysolutionOrder inventorysolution
Order inventorysolution
Himanshu Hirwani
Ìý
Alteccoreyardconcept
AlteccoreyardconceptAlteccoreyardconcept
Alteccoreyardconcept
Robert Brown
Ìý
outbound_delivery_processing_for_stos_v1.1.pdf
outbound_delivery_processing_for_stos_v1.1.pdfoutbound_delivery_processing_for_stos_v1.1.pdf
outbound_delivery_processing_for_stos_v1.1.pdf
TahirZia9
Ìý
Documentation in Pharmaceutical Industry
Documentation in Pharmaceutical IndustryDocumentation in Pharmaceutical Industry
Documentation in Pharmaceutical Industry
Pooja Harkal
Ìý
iso 9001 2008 Downstairs QC 9-2-15
iso 9001 2008 Downstairs QC  9-2-15 iso 9001 2008 Downstairs QC  9-2-15
iso 9001 2008 Downstairs QC 9-2-15
MICHAEL MORGAN
Ìý
Eresource nfra stores modulet
Eresource nfra stores moduletEresource nfra stores modulet
Eresource nfra stores modulet
eresourceerpuae
Ìý
UG_Receiving-OF_ESAB
UG_Receiving-OF_ESABUG_Receiving-OF_ESAB
UG_Receiving-OF_ESAB
Deb Martina
Ìý
Advanced inventory in tally erp 9
Advanced inventory in tally erp 9Advanced inventory in tally erp 9
Advanced inventory in tally erp 9
Accounts Arabia
Ìý
Documentation in pharmaceutical industry
Documentation in pharmaceutical industryDocumentation in pharmaceutical industry
Documentation in pharmaceutical industry
Pooja Harkal
Ìý
Job-Order-Costing for the best ptt and making
Job-Order-Costing for the best ptt and makingJob-Order-Costing for the best ptt and making
Job-Order-Costing for the best ptt and making
macepe1
Ìý
SAP SD Training in Chennai Demo Part-4
SAP SD Training in Chennai Demo Part-4SAP SD Training in Chennai Demo Part-4
SAP SD Training in Chennai Demo Part-4
Thecreating Experts
Ìý
Stock transfer using stock transport order
Stock transfer using stock transport orderStock transfer using stock transport order
Stock transfer using stock transport order
Santhana Kishore
Ìý
Altec Core Yard Concepts
Altec Core Yard ConceptsAltec Core Yard Concepts
Altec Core Yard Concepts
metacomputer
Ìý
Altec Core Yard Concepts
Altec Core Yard ConceptsAltec Core Yard Concepts
Altec Core Yard Concepts
metacomputer
Ìý
Case study for business optimization of a paper distribution company
Case study for business optimization of a paper distribution companyCase study for business optimization of a paper distribution company
Case study for business optimization of a paper distribution company
Vivek Kedia
Ìý
Operations management
Operations managementOperations management
Operations management
Bharti Kumari
Ìý
Procedures in receiving and storing tools and materials
Procedures in receiving and storing tools and materialsProcedures in receiving and storing tools and materials
Procedures in receiving and storing tools and materials
Lynette Alcaide
Ìý
Order inventorysolution
Order inventorysolutionOrder inventorysolution
Order inventorysolution
Himanshu Hirwani
Ìý
Alteccoreyardconcept
AlteccoreyardconceptAlteccoreyardconcept
Alteccoreyardconcept
Robert Brown
Ìý
outbound_delivery_processing_for_stos_v1.1.pdf
outbound_delivery_processing_for_stos_v1.1.pdfoutbound_delivery_processing_for_stos_v1.1.pdf
outbound_delivery_processing_for_stos_v1.1.pdf
TahirZia9
Ìý

Sop

  • 1. Standard Operating Procedure Title: Warehouse - Processing Issues, Returns and Rejects ______________________________________________________________________________________ 1.3.3. Use the forklift to retrieve the pallet located in the storage bin. 1.4.4. Inspect each material to ensure the information on the goods corresponds to the Material code, Description and Laboratory Batch no. written on the Transfer Order Form. Take enough material from the source pallet to at least cover the quantity required for the issue. NEVER undersupply production with materials, unless Production has agreed. 1.4.5. Using a Black marker, write the quantity removed from the source pallet on the ISSUE column of the Bin Sheet (Form-020). Then calculate the quantity remaining on the pallet and write the new quantity in the BALANCE column of the bin sheet. The updated Bin sheet is then placed back onto pallet. 1.4.6. Write down the quantity taken and pallet no. on the Issue for Production Form (Form- 030) using a Blue or Black pen. Leave the checked section blank for authorised person to check and Initial. 1.4.7. Put the remaining goods back into the original location. 1.4.8. Repeat steps 1.4.1. to 1.4.7. until the Transfer Order Form is complete. 1.4.9. Ensure the complete issue is very stable and is not overhanging the slip-sheet or pallet. Note: Ensure all goods are free of dust and dirt, before sending into production. 1.4.10. When the requested Issue have been completed for a line, the component assembler (Warehouse Store person) will give a count, write down the source and destination Storage type and Storage bin, Reference GRS number of each material collected form the warehouse GRS filing cabinet. The number of pallets used to complete the issue is also added next to the initials on the Transfer Orders. 1.4.11. An Issue For Production form (Form-030) is fully filled up including the Process Line, Person who requested goods through the Transfer Order, Date, Time materials required, Batch Production Number, and the Number of the Pallet/s, (e.g. 1 of 3.). 1.4.12. Every Issue is to be checked by an authorised Store person before delivery into production. The assembler will sign and date at the top section of TO and sign in the Assembled By section. The checker will sign and initial on the Checked By section of the TO and write a Y next to CHECKED on the Issue for Production Form with a black marker. The authorized checker will then attach the Issue for Production Form/s on all the pallets involved in the issue. 1.4.13. Place the completed Transfer Order into the Issues to be checked and confirmed tray. One copy of the completed Transfer Order goes with the goods. The original Transfer Order will be kept in the warehouse for filing. These MTO will be needed for periodic inventory count. Issue For Production form will go with the pallets. Bin sheet will stay with the sourced pallet/s. Note: All raw materials will be dispensed through Intermediate Bulk Containers (IBC) by the Dispensary. (i.e. imported bulk tablets) 2. Issues of Production Consumables (Non Component Goods) Production consumables are materials that are used in the production process, but not directly with a particular BPN, such as cleaning cloths, sterile latex gloves, cleaning solutions, and many more. Non component goods are transferred to the production according to WAR-005 section 2.2. 3. Materials Return From Production This is a brief rundown to what Production Operators do for the return of materials: 3.1. When returning Material/s from Production to Warehouse (PW-BS), or from Production to Interim production area (PW-IP), an accurate count of the amount returned should be obtained. Any partial boxes to be returned should carry a PARTIAL sticker. This is not an approved copy unless stamped in red File Location: Date Printed: Page 4 of 7