際際滷

際際滷Share a Scribd company logo
Tel Aviv, 1st April 2013
To whom it may concern,
Stasik Nemirovsky has worked in the construction of the on shore and off shore
tunnels for the Sorek Desalination Plant from December 2011 to April 2013.
During this period Stasik Nemirovsky has worked as shaft manager, crane
operator, bentonite mixer operator and separator plant operator.
Stasiks performance in his job has been highly satisfactory. He has worked
professionally at all times and has great ability and potential to confront any
challenge in the field of construction, particularly in the tunneling area. His attitude
and willingness to work have been remarkable, showing a great capacity for
adaptability to the tasks of this job. I would highly recommend Stasik Nemirovsky
for other positions and wish him all the best for his future.
Sincerely,
Beatriz Arquero
Tunneling Site Manager
Ad

Recommended

Reference Letter - Frank Siep - Offshore Instalation Manage
Reference Letter - Frank Siep - Offshore Instalation Manage
Ivan Dragoslavic
K辿zimunka oll坦val, pap鱈rb坦l
K辿zimunka oll坦val, pap鱈rb坦l
Kapit叩n J坦zsef
The Birth of Kehfab
The Birth of Kehfab
Websites.ca
james_carter_recommendation
james_carter_recommendation
James Carter
Topology optimization - Metal Bracket
Topology optimization - Metal Bracket
Stasik Nemirovsky
Example 1 Engineeringtool
Example 1 Engineeringtool
Stasik Nemirovsky
EngineeringTool workshop example
EngineeringTool workshop example
Stasik Nemirovsky
Design and Fabrication of a 3U CubeSat - Capstone Project
Design and Fabrication of a 3U CubeSat - Capstone Project
Stasik Nemirovsky
Numerical Methods in Mechanical Engineering - Final Project
Numerical Methods in Mechanical Engineering - Final Project
Stasik Nemirovsky
FEA Analysis - Thin Plate
FEA Analysis - Thin Plate
Stasik Nemirovsky
Finite Element Analysis and Natural Modes Investigation
Finite Element Analysis and Natural Modes Investigation
Stasik Nemirovsky
Nemirovsky s affordable housing solutions
Nemirovsky s affordable housing solutions
Stasik Nemirovsky
Design Project - Front-rowing mechanism - MECH 292
Design Project - Front-rowing mechanism - MECH 292
Stasik Nemirovsky
Gearbox design - MECH 393 final project
Gearbox design - MECH 393 final project
Stasik Nemirovsky

More Related Content

More from Stasik Nemirovsky (6)

Numerical Methods in Mechanical Engineering - Final Project
Numerical Methods in Mechanical Engineering - Final Project
Stasik Nemirovsky
FEA Analysis - Thin Plate
FEA Analysis - Thin Plate
Stasik Nemirovsky
Finite Element Analysis and Natural Modes Investigation
Finite Element Analysis and Natural Modes Investigation
Stasik Nemirovsky
Nemirovsky s affordable housing solutions
Nemirovsky s affordable housing solutions
Stasik Nemirovsky
Design Project - Front-rowing mechanism - MECH 292
Design Project - Front-rowing mechanism - MECH 292
Stasik Nemirovsky
Gearbox design - MECH 393 final project
Gearbox design - MECH 393 final project
Stasik Nemirovsky
Numerical Methods in Mechanical Engineering - Final Project
Numerical Methods in Mechanical Engineering - Final Project
Stasik Nemirovsky
FEA Analysis - Thin Plate
FEA Analysis - Thin Plate
Stasik Nemirovsky
Finite Element Analysis and Natural Modes Investigation
Finite Element Analysis and Natural Modes Investigation
Stasik Nemirovsky
Nemirovsky s affordable housing solutions
Nemirovsky s affordable housing solutions
Stasik Nemirovsky
Design Project - Front-rowing mechanism - MECH 292
Design Project - Front-rowing mechanism - MECH 292
Stasik Nemirovsky
Gearbox design - MECH 393 final project
Gearbox design - MECH 393 final project
Stasik Nemirovsky

Stasik Nemirovsky

  • 1. Tel Aviv, 1st April 2013 To whom it may concern, Stasik Nemirovsky has worked in the construction of the on shore and off shore tunnels for the Sorek Desalination Plant from December 2011 to April 2013. During this period Stasik Nemirovsky has worked as shaft manager, crane operator, bentonite mixer operator and separator plant operator. Stasiks performance in his job has been highly satisfactory. He has worked professionally at all times and has great ability and potential to confront any challenge in the field of construction, particularly in the tunneling area. His attitude and willingness to work have been remarkable, showing a great capacity for adaptability to the tasks of this job. I would highly recommend Stasik Nemirovsky for other positions and wish him all the best for his future. Sincerely, Beatriz Arquero Tunneling Site Manager