ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Städtebau 2 Projekt  (Final)
Heng Jia Wang
Bronislava Hubová
   Lukáš Lechman
  Er Zhuan Zhuan
Deutschland
               Essen




  Nordrhein-Westfalen
Essen - Grünstenscheid
    Essen-Rüttenscheid
Städtebau 2 Projekt  (Final)
¶Ùü²õ²õ±ð±ô»å´Ç°ù´Ú   Hauptbahnhof
Städtebau 2 Projekt  (Final)
Städtebau 2 Projekt  (Final)
Städtebau 2 Projekt  (Final)
Städtebau 2 Projekt  (Final)
Städtebau 2 Projekt  (Final)
Städtebau 2 Projekt  (Final)
Städtebau 2 Projekt  (Final)
Solution
Create a staircase at the
location which only allows
pedestrian to go through, but
not a vehicle
Lack of
 Community
  green area
  within the
planning area   Solution
                Create an integrated housing
                properties with more private
                green space and public green
                space.
Solution
Therefore our objective of the
development project will high green
area and relatively low density
Städtebau 2 Projekt  (Final)
Solution
- Parking area will prepared along the road site for
the truck and lorry coming for exhibition.
- Additional parking area will be prepared in the
green circle area.
- People are encourage to arrive at Messe Essen by
public transport (U Bahan- Gruga/Messe) rather than
by own transport.
Solution
Football field and wall will be removed:
- No barrier between the new planning area and existing
housing area.
- Suit to the planning which more focus on Green housing
development.
- Overcome the problem of noise.
ï‚ž More  Green, low density
ï‚ž Normal, Medium and High Class Housing
ï‚ž More public space
ï‚ž More out door activity facilities
 Connection to Rüttenschied Straße and area
  nearby
ï‚ž Environmental friendly, with walk way and
  bicycle way
Städtebau 2 Projekt  (Final)
Medium Cost
Normal Cost                  Housing
 Housing




            Sport and                     High Class
          Recreation Area                  Housing
- 4 Block with a total of xx units
                        - Bicycle way and walk way connecting




- Parking area are prepared along the
  road side
- Public green area
-   A total of 7 blocks and xx units
-   Parkings prepared at road side
-   Green area in between each blocks
-   Semi-private green area
-   Walk way and bicycle way connecting
-   A total of 3 blocks, with xx units
-   Private green area
-   Walk way and bicycle way provided
-   Parking prepared at road side
Extreme
             Sport Area   Tennis Court




                                              Basket Ball
Badminton                                       Field
  Court




                                         Recreation
      Foot Ball                            Area
        Field
Städtebau 2 Projekt  (Final)
- Connecting to Rüttenschiedstraße




    - Connecting to Witterkindstraße

More Related Content

Städtebau 2 Projekt (Final)

  • 2. Heng Jia Wang Bronislava Hubová Lukáš Lechman Er Zhuan Zhuan
  • 3. Deutschland Essen Nordrhein-Westfalen Essen - Grünstenscheid Essen-Rüttenscheid
  • 13. Solution Create a staircase at the location which only allows pedestrian to go through, but not a vehicle
  • 14. Lack of Community green area within the planning area Solution Create an integrated housing properties with more private green space and public green space.
  • 15. Solution Therefore our objective of the development project will high green area and relatively low density
  • 17. Solution - Parking area will prepared along the road site for the truck and lorry coming for exhibition. - Additional parking area will be prepared in the green circle area. - People are encourage to arrive at Messe Essen by public transport (U Bahan- Gruga/Messe) rather than by own transport.
  • 18. Solution Football field and wall will be removed: - No barrier between the new planning area and existing housing area. - Suit to the planning which more focus on Green housing development. - Overcome the problem of noise.
  • 19. ï‚ž More Green, low density ï‚ž Normal, Medium and High Class Housing ï‚ž More public space ï‚ž More out door activity facilities ï‚ž Connection to Rüttenschied Straße and area nearby ï‚ž Environmental friendly, with walk way and bicycle way
  • 21. Medium Cost Normal Cost Housing Housing Sport and High Class Recreation Area Housing
  • 22. - 4 Block with a total of xx units - Bicycle way and walk way connecting - Parking area are prepared along the road side - Public green area
  • 23. - A total of 7 blocks and xx units - Parkings prepared at road side - Green area in between each blocks - Semi-private green area - Walk way and bicycle way connecting
  • 24. - A total of 3 blocks, with xx units - Private green area - Walk way and bicycle way provided - Parking prepared at road side
  • 25. Extreme Sport Area Tennis Court Basket Ball Badminton Field Court Recreation Foot Ball Area Field
  • 27. - Connecting to Rüttenschiedstraße - Connecting to Witterkindstraße