ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
656152044
MATLAB Based Project



Sr No.   Project Name                   Duration
1.       Implementation OFDM            2-3 Days
         System Using
         MATLAB/Simulink
2.       Image Processing Using         2-3 Days
         Neural Network Toolbox
3.       Image Compression Using        2-3 Days
         Wavelet Toolbox
4.       Implementation of CDMA         2-3 Days
         System in
         MATLAB/Simulink




VHDL Based Projects

Sr No.   Project Name                     Duration
1.       16-Bit Microprocessor            4-5 Days
2.       Microcontroller Design           5-6 Days
3.       Simulation of Huffman Coding     5-6 Days
4.       Landline Switching System        4-5 Days
         Design
5.       UART Design                      4-5 Days
6.       Neuron Design                    4-5 Days
7.       Digital Clock Design             2-3 Days
8.       16 Bit ALU Design                2-3 Days
EMBEDDED SYSTEM PROJECT:
S. no.   Project name                    Duration
1.       Digital Bus                     3-4 Days

2.       Metro Train Prototype           3-4 Days
3.       Automatic Lift System           3-4 Days
4.       Password Based Door             3-4 Days
         Locking System
5.       Electronic Voting Machine       3-4 Days
6.       Automatic Parking system        3-4 Days
7.       Temperature Sensing with        3-4 Days
         Buzzer
7.       Line follower robot             3-4 Days
8.       RF based robot                  4-5 Days
9.       RF based electrical appliance   4-5 Days
         control
10.      DTMF base projects              4-5days
11.      Frequency measurement           3-4days
12.      Relay base projects             3-4days

More Related Content

Summer training projects

  • 1. 656152044 MATLAB Based Project Sr No. Project Name Duration 1. Implementation OFDM 2-3 Days System Using MATLAB/Simulink 2. Image Processing Using 2-3 Days Neural Network Toolbox 3. Image Compression Using 2-3 Days Wavelet Toolbox 4. Implementation of CDMA 2-3 Days System in MATLAB/Simulink VHDL Based Projects Sr No. Project Name Duration 1. 16-Bit Microprocessor 4-5 Days 2. Microcontroller Design 5-6 Days 3. Simulation of Huffman Coding 5-6 Days 4. Landline Switching System 4-5 Days Design 5. UART Design 4-5 Days 6. Neuron Design 4-5 Days 7. Digital Clock Design 2-3 Days 8. 16 Bit ALU Design 2-3 Days
  • 2. EMBEDDED SYSTEM PROJECT: S. no. Project name Duration 1. Digital Bus 3-4 Days 2. Metro Train Prototype 3-4 Days 3. Automatic Lift System 3-4 Days 4. Password Based Door 3-4 Days Locking System 5. Electronic Voting Machine 3-4 Days 6. Automatic Parking system 3-4 Days 7. Temperature Sensing with 3-4 Days Buzzer 7. Line follower robot 3-4 Days 8. RF based robot 4-5 Days 9. RF based electrical appliance 4-5 Days control 10. DTMF base projects 4-5days 11. Frequency measurement 3-4days 12. Relay base projects 3-4days