ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
CURRICULUM VITAE
Name : Tero Luoma Date of Birth : 21-03-1980
Address : 14 Reed Crescent Marital Status : Married
Laurencekirk Nationality : Finnish
Aberdeenshire, AB30 1EF Email : trluoma@gmail.com
Telephone : 07882343778 LinkedIN : uk.linkedin.com/in/LuomaTT
Executive Summary: An experienced Project Engineer with a flexible attitude and a high level of drive and commitment.
A clear thinker with good communication skills, who is able to develop relationships at all levels. Proven track record with
delivering projects under pressure, within deadlines as well as cost and planning requirements. Looking for a position
which offers an opportunity to develop new technology or systems. Open to both staff or contract positions. Re-location
be it international or nationwide is an option.
Profile:
Over 10 years of experience in working in Oil and Gas Industry, involved in the design, build and supply of small/medium
size instrumentation and controls systems mainly to be operated in hazardous area locations.
Key Experience:
ï‚· Skilled user of AutoCAD design tool
 Working knowledge of Codes/Standards – typically DNV 2.7.1, 2.7.2 & 2.7.3, NORSOK, API and BS EN 60079
ï‚· EEMUA Approved COMPEX, modules EX01, EX02, EX03 & EX04 (valid till March 2019)
Qualifications:
2000-2005 Central Ostrobothnia, University of Applied Sciences - Finland
BSc in Automation and Controls engineering
RELEVANT WORK EXPERIENCE :-
September 2015 to March 2016
National Oilwell Varco (DDS- Wellbore Technologies)
Role: Technical Sales Engineer
In this role my responsibilities were as identified below:
Producing detailed proposal drawings and other technical documents for tenders. I have acquired a reputation of
producing quality work and colleagues from other divisions regularly utilised my skills and willingness to help.
Served as an interface between the client, sales engineer and applications engineer to ensure client’s requirements wee
fully understood and met.
In this role I was at the forefront of rolling out DDS’s tiered optimisation solutions which enable automated drilling,
offering greatly improved Rate of Penetration for the operators, reducing drilling days.
I volunteered to take on quality improvement (on top of raising, tracking and closing out any non-conformances) and was
an integral part in creating project management documentation and procedures.
Due to my good track record of delivering projects with minimal supervision, I was assigned to project manage all the
projects during the sickness absence of our project manager.
I was the driving force behind organising a service plan for a new product launched from America. I, together with global
standards group, put together a top level quality plan and identified training requirements for the technicians to maintain
product competency.
Volunteered as First aider, safety committee representative as well as being included on the 24hr on-call rota.
November 2013 – September 2015
National Oilwell Varco (DDS- Wellbore Technologies)
Role: Project Engineer
In this role my responsibilities were as identified below:
I Produced engineering designs and associated engineering documents (such as drawings, calculations and reports) and
ensured that they were completed within the required timescales
Progress small and medium sized engineering projects, as allocated by the Regional/Sales Manager - Projects, or working
as part of a team on larger projects. Most work was carried out with minimal supervision, but with regular consultation
with the Regional Sales Manager and other team members.
Carried out Project work, which in addition to design, included all aspects of the design process such as drafting,
production of engineering documentation, FAT, packing & delivery where deemed appropriate.
Liaised with clients and suppliers as required and provided engineering support to Manufacturing, Sales and Service
Departments
Assisted in general clerical and administrative duties to ensure the smooth running of the Projects Department as well as
volunteered to be included on the on-call rota. I was also the first aider for our department.
December 2012 – November 2013
EFC GROUP
Role: Project Engineer
I took overall responsibility of the project, leading it from the sales handover all the way to close out meeting and
afterwards providing aftercare support to clients.
Besides being the interface between the client and EFC I worked closely with all the different departments (sales, design
office and workshop) to achieve good quality work.
I gave guidance for the more junior project engineers assigned with projects similar to those I had completed previously.
Sales department relied on the bills of materials from the projects I had carried out, knowing they were up to date and
therefore a good basis for quoting for repeat orders.
I was also the first aider.
Key projects delivered:
- A tank gauging system c/w hull draft measurement and 2-axis inclination metering.
- An air pressure vessel surface temperature monitoring system for an active heave compensator system
August 2012 - December 2012
LABTECH SERVICES LIMITED
Role: Project Engineer
I interfaced with the sales office to design A60 rated offshore
containers to meet client’s requirements
Ensured compliance to all applicable design standards [DNV 2.7-1 BS EN 12079 (structural) and DNV 2.7-2 and/or NORSOK]
As a project engineer I was responsible of on time and on budget delivery and ultimately client satisfaction. I was the first
point of contact for the client and an interface between all different disciplines and third party companies.
I was the first aider.
August 2010 - August 2012
OEG Offshore
Role: Project engineer, initially an electrical support engineer
In keeping within budget costs and man hours my main responsibilities were to take care of procurement and specification
of equipment installed into a module. Each module was a bespoke unit so electrical equipment and HVAC systems had to
be specified as per customer requirements each time.
My role as a support engineer was quite a diverse one and widened my skills to new directions. I did weight estimates
utilising structural drawings and steel books etc. I also spent a lot of time putting together document packages for clients
so I am familiar with document control processes, data sheets and certificates. More technical responsibilities involved
producing cable calculations, specifying correct cables and glands based on industry standards.
HVAC systems were an important part of modular design as well the fire and gas systems. I produced cause and effect
matrices and took part in Factory Acceptance Tests.
I was also the first aider.
August 2009 - June 2010
EnerMech Ltd
Role: Electrical projects engineer
In this role I acquired experience in creating cost reports, timing plans and work packs. My role included responding to
customers’ requests for quotations and taking charge of the project from there on. This involved creating a cost estimate
and a project timing plan as well as procurement of parts.
My main project was an operator’s cabin exchange from two of the cranes on an offshore oil platform. It was my
responsibility to create cable calculations and electrical equipment list and to liaise with mechanical engineers as well as
technicians offshore.
May 2006 - August 2009
National Oilwell Varco, Rig Solutions, Montrose
Role: Electrical projects engineer / designer
In collaboration with designers, technicians and document control department, my main responsibility was to upgrade
control systems and electrical equipment as per customer request.
This role involved creating quotes, doing the procurement all the way to the financial close outs. I was initially employed as
an electrical draftsman so I am an experienced user of AutoCAD design tool.
References: Available upon request.

More Related Content

What's hot (20)

GEORGE CV
GEORGE CVGEORGE CV
GEORGE CV
George Alexander
Ìý
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updated
Mohammed Hashim
Ìý
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar Sheikh
Ìý
Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATOR
Hamza Aljabour
Ìý
Green line profile
Green line profile Green line profile
Green line profile
Greenline Technicals Works L.L.C
Ìý
Steve Clark CV 2015
Steve Clark CV 2015Steve Clark CV 2015
Steve Clark CV 2015
Stephen Clark
Ìý
O\'C&L Corporate Capabilities
O\'C&L Corporate CapabilitiesO\'C&L Corporate Capabilities
O\'C&L Corporate Capabilities
Michael Sallese, PSP, PMI-SP
Ìý
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
PMI Chennai Chapter
Ìý
CV sultan(Q)
CV sultan(Q)CV sultan(Q)
CV sultan(Q)
Md.Sultan Uddin
Ìý
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
Rajkumar Narayanan
Ìý
0 b a levine mfg qc eng resume
0 b a levine mfg   qc eng resume0 b a levine mfg   qc eng resume
0 b a levine mfg qc eng resume
Andy Levine
Ìý
Muhammad Khizir Ahmed
Muhammad Khizir AhmedMuhammad Khizir Ahmed
Muhammad Khizir Ahmed
Muhammad Khizir Ahmed
Ìý
SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14
Andrew Milota
Ìý
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling rendition
Jaswin Sood
Ìý
Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)
Ashraf Khan
Ìý
October 2015 resume kingshook
October 2015 resume kingshookOctober 2015 resume kingshook
October 2015 resume kingshook
kingshook mondal
Ìý
Roberts CV
Roberts CVRoberts CV
Roberts CV
Robert Jones
Ìý
Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract Risks
Pankaj K Sinha
Ìý
Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno Nobel
Paul Snyder
Ìý
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEW
fadi kuwaik
Ìý
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updated
Mohammed Hashim
Ìý
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar Sheikh
Ìý
Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATOR
Hamza Aljabour
Ìý
Steve Clark CV 2015
Steve Clark CV 2015Steve Clark CV 2015
Steve Clark CV 2015
Stephen Clark
Ìý
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
PMI Chennai Chapter
Ìý
0 b a levine mfg qc eng resume
0 b a levine mfg   qc eng resume0 b a levine mfg   qc eng resume
0 b a levine mfg qc eng resume
Andy Levine
Ìý
SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14
Andrew Milota
Ìý
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling rendition
Jaswin Sood
Ìý
Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)
Ashraf Khan
Ìý
October 2015 resume kingshook
October 2015 resume kingshookOctober 2015 resume kingshook
October 2015 resume kingshook
kingshook mondal
Ìý
Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract Risks
Pankaj K Sinha
Ìý
Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno Nobel
Paul Snyder
Ìý
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEW
fadi kuwaik
Ìý

Viewers also liked (15)

Critical writing on presentations
Critical writing on presentationsCritical writing on presentations
Critical writing on presentations
Joshua Norris
Ìý
Ciclo contable 2 (2)Ciclo contable 2 (2)
Ciclo contable 2 (2)
Caperios
Ìý
6A Christina Sagnimeni
6A Christina Sagnimeni6A Christina Sagnimeni
6A Christina Sagnimeni
Christina Sagnimeni
Ìý
Credito agrario2.01Credito agrario2.01
Credito agrario2.01
JOSE MIGUEL CORRALES MEZA
Ìý
13 a finalportfolio-christinasagnimeni
13 a finalportfolio-christinasagnimeni13 a finalportfolio-christinasagnimeni
13 a finalportfolio-christinasagnimeni
Christina Sagnimeni
Ìý
Edición de-presentaciones-electrónicas-lindaEdición de-presentaciones-electrónicas-linda
Edición de-presentaciones-electrónicas-linda
Linda Martinez
Ìý
Visio academygenelhizmettanıtımı
Visio academygenelhizmettanıtımıVisio academygenelhizmettanıtımı
Visio academygenelhizmettanıtımı
Visio Academy
Ìý
Organizational Management
Organizational ManagementOrganizational Management
Organizational Management
Joshua Norris
Ìý
13 a finalportfolio
13 a finalportfolio13 a finalportfolio
13 a finalportfolio
Christina Sagnimeni
Ìý
Intel International Business case study
Intel International Business case studyIntel International Business case study
Intel International Business case study
Joshua Norris
Ìý
Government engineering college bhavnagar
Government engineering college   bhavnagarGovernment engineering college   bhavnagar
Government engineering college bhavnagar
Aesha Modi
Ìý
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
Ravi Shankar
Ìý
Cirque du Soleil_Final Case Analysis
Cirque du Soleil_Final Case AnalysisCirque du Soleil_Final Case Analysis
Cirque du Soleil_Final Case Analysis
Joshua Norris
Ìý
Tema 3 dossierTema 3 dossier
Tema 3 dossier
Oriol Cervera
Ìý
BranqueamentoBranqueamento
Branqueamento
RÚBIA CRUZ
Ìý
Critical writing on presentations
Critical writing on presentationsCritical writing on presentations
Critical writing on presentations
Joshua Norris
Ìý
Ciclo contable 2 (2)Ciclo contable 2 (2)
Ciclo contable 2 (2)
Caperios
Ìý
Credito agrario2.01Credito agrario2.01
Credito agrario2.01
JOSE MIGUEL CORRALES MEZA
Ìý
13 a finalportfolio-christinasagnimeni
13 a finalportfolio-christinasagnimeni13 a finalportfolio-christinasagnimeni
13 a finalportfolio-christinasagnimeni
Christina Sagnimeni
Ìý
Edición de-presentaciones-electrónicas-lindaEdición de-presentaciones-electrónicas-linda
Edición de-presentaciones-electrónicas-linda
Linda Martinez
Ìý
Visio academygenelhizmettanıtımı
Visio academygenelhizmettanıtımıVisio academygenelhizmettanıtımı
Visio academygenelhizmettanıtımı
Visio Academy
Ìý
Organizational Management
Organizational ManagementOrganizational Management
Organizational Management
Joshua Norris
Ìý
Intel International Business case study
Intel International Business case studyIntel International Business case study
Intel International Business case study
Joshua Norris
Ìý
Government engineering college bhavnagar
Government engineering college   bhavnagarGovernment engineering college   bhavnagar
Government engineering college bhavnagar
Aesha Modi
Ìý
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
Ravi Shankar
Ìý
Cirque du Soleil_Final Case Analysis
Cirque du Soleil_Final Case AnalysisCirque du Soleil_Final Case Analysis
Cirque du Soleil_Final Case Analysis
Joshua Norris
Ìý
Tema 3 dossierTema 3 dossier
Tema 3 dossier
Oriol Cervera
Ìý
BranqueamentoBranqueamento
Branqueamento
RÚBIA CRUZ
Ìý

Similar to T. Luoma_project_engineer_Instrumentation_Automation_controls (20)

Henry CV
Henry CVHenry CV
Henry CV
Henry Jayahar
Ìý
Pramod Kumar Das
Pramod Kumar Das Pramod Kumar Das
Pramod Kumar Das
Pramod Kumar Das
Ìý
Christian Lee Jumamil
Christian Lee JumamilChristian Lee Jumamil
Christian Lee Jumamil
Christian Lee Jumamil
Ìý
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
PERWEZ AKHTAR
Ìý
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
PERWEZ AKHTAR
Ìý
MEP procurement engineer
MEP procurement engineerMEP procurement engineer
MEP procurement engineer
Raymond Espiritu
Ìý
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
rias ahamed
Ìý
Kannan PEM
Kannan PEMKannan PEM
Kannan PEM
Kannan Kamala
Ìý
YANG XIANGJI_CV
YANG XIANGJI_CVYANG XIANGJI_CV
YANG XIANGJI_CV
Xiangji Yang
Ìý
Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15
Javier Davila
Ìý
Jai Townsend - CV
Jai Townsend - CVJai Townsend - CV
Jai Townsend - CV
Jai Townsend
Ìý
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
NITIN AGGRAWAL
Ìý
Francisco Cortez Resume 2015
Francisco Cortez Resume 2015Francisco Cortez Resume 2015
Francisco Cortez Resume 2015
Francisco Cortez
Ìý
CHRISTIAN LEE JUMAMIL
CHRISTIAN LEE JUMAMILCHRISTIAN LEE JUMAMIL
CHRISTIAN LEE JUMAMIL
Christian Lee Jumamil
Ìý
Mark O
Mark OMark O
Mark O
Mark O'Leary
Ìý
Resume_Mallanagouda Patil
Resume_Mallanagouda PatilResume_Mallanagouda Patil
Resume_Mallanagouda Patil
mallanagouda patil
Ìý
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers
Ìý
Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)
Azhar Abdul Hameed
Ìý
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
Bassam Shamkhi
Ìý
RIJO GEORGE CV
RIJO GEORGE CVRIJO GEORGE CV
RIJO GEORGE CV
Rijo George
Ìý
MEP procurement engineer
MEP procurement engineerMEP procurement engineer
MEP procurement engineer
Raymond Espiritu
Ìý
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
rias ahamed
Ìý
YANG XIANGJI_CV
YANG XIANGJI_CVYANG XIANGJI_CV
YANG XIANGJI_CV
Xiangji Yang
Ìý
Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15
Javier Davila
Ìý
Jai Townsend - CV
Jai Townsend - CVJai Townsend - CV
Jai Townsend - CV
Jai Townsend
Ìý
Francisco Cortez Resume 2015
Francisco Cortez Resume 2015Francisco Cortez Resume 2015
Francisco Cortez Resume 2015
Francisco Cortez
Ìý
Resume_Mallanagouda Patil
Resume_Mallanagouda PatilResume_Mallanagouda Patil
Resume_Mallanagouda Patil
mallanagouda patil
Ìý
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers
Ìý
Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)
Azhar Abdul Hameed
Ìý
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
Bassam Shamkhi
Ìý
RIJO GEORGE CV
RIJO GEORGE CVRIJO GEORGE CV
RIJO GEORGE CV
Rijo George
Ìý

T. Luoma_project_engineer_Instrumentation_Automation_controls

  • 1. CURRICULUM VITAE Name : Tero Luoma Date of Birth : 21-03-1980 Address : 14 Reed Crescent Marital Status : Married Laurencekirk Nationality : Finnish Aberdeenshire, AB30 1EF Email : trluoma@gmail.com Telephone : 07882343778 LinkedIN : uk.linkedin.com/in/LuomaTT Executive Summary: An experienced Project Engineer with a flexible attitude and a high level of drive and commitment. A clear thinker with good communication skills, who is able to develop relationships at all levels. Proven track record with delivering projects under pressure, within deadlines as well as cost and planning requirements. Looking for a position which offers an opportunity to develop new technology or systems. Open to both staff or contract positions. Re-location be it international or nationwide is an option. Profile: Over 10 years of experience in working in Oil and Gas Industry, involved in the design, build and supply of small/medium size instrumentation and controls systems mainly to be operated in hazardous area locations. Key Experience: ï‚· Skilled user of AutoCAD design tool ï‚· Working knowledge of Codes/Standards – typically DNV 2.7.1, 2.7.2 & 2.7.3, NORSOK, API and BS EN 60079 ï‚· EEMUA Approved COMPEX, modules EX01, EX02, EX03 & EX04 (valid till March 2019) Qualifications: 2000-2005 Central Ostrobothnia, University of Applied Sciences - Finland BSc in Automation and Controls engineering
  • 2. RELEVANT WORK EXPERIENCE :- September 2015 to March 2016 National Oilwell Varco (DDS- Wellbore Technologies) Role: Technical Sales Engineer In this role my responsibilities were as identified below: Producing detailed proposal drawings and other technical documents for tenders. I have acquired a reputation of producing quality work and colleagues from other divisions regularly utilised my skills and willingness to help. Served as an interface between the client, sales engineer and applications engineer to ensure client’s requirements wee fully understood and met. In this role I was at the forefront of rolling out DDS’s tiered optimisation solutions which enable automated drilling, offering greatly improved Rate of Penetration for the operators, reducing drilling days. I volunteered to take on quality improvement (on top of raising, tracking and closing out any non-conformances) and was an integral part in creating project management documentation and procedures. Due to my good track record of delivering projects with minimal supervision, I was assigned to project manage all the projects during the sickness absence of our project manager. I was the driving force behind organising a service plan for a new product launched from America. I, together with global standards group, put together a top level quality plan and identified training requirements for the technicians to maintain product competency. Volunteered as First aider, safety committee representative as well as being included on the 24hr on-call rota. November 2013 – September 2015 National Oilwell Varco (DDS- Wellbore Technologies) Role: Project Engineer In this role my responsibilities were as identified below: I Produced engineering designs and associated engineering documents (such as drawings, calculations and reports) and ensured that they were completed within the required timescales Progress small and medium sized engineering projects, as allocated by the Regional/Sales Manager - Projects, or working as part of a team on larger projects. Most work was carried out with minimal supervision, but with regular consultation with the Regional Sales Manager and other team members. Carried out Project work, which in addition to design, included all aspects of the design process such as drafting, production of engineering documentation, FAT, packing & delivery where deemed appropriate. Liaised with clients and suppliers as required and provided engineering support to Manufacturing, Sales and Service Departments Assisted in general clerical and administrative duties to ensure the smooth running of the Projects Department as well as volunteered to be included on the on-call rota. I was also the first aider for our department.
  • 3. December 2012 – November 2013 EFC GROUP Role: Project Engineer I took overall responsibility of the project, leading it from the sales handover all the way to close out meeting and afterwards providing aftercare support to clients. Besides being the interface between the client and EFC I worked closely with all the different departments (sales, design office and workshop) to achieve good quality work. I gave guidance for the more junior project engineers assigned with projects similar to those I had completed previously. Sales department relied on the bills of materials from the projects I had carried out, knowing they were up to date and therefore a good basis for quoting for repeat orders. I was also the first aider. Key projects delivered: - A tank gauging system c/w hull draft measurement and 2-axis inclination metering. - An air pressure vessel surface temperature monitoring system for an active heave compensator system August 2012 - December 2012 LABTECH SERVICES LIMITED Role: Project Engineer I interfaced with the sales office to design A60 rated offshore containers to meet client’s requirements Ensured compliance to all applicable design standards [DNV 2.7-1 BS EN 12079 (structural) and DNV 2.7-2 and/or NORSOK] As a project engineer I was responsible of on time and on budget delivery and ultimately client satisfaction. I was the first point of contact for the client and an interface between all different disciplines and third party companies. I was the first aider. August 2010 - August 2012 OEG Offshore Role: Project engineer, initially an electrical support engineer In keeping within budget costs and man hours my main responsibilities were to take care of procurement and specification of equipment installed into a module. Each module was a bespoke unit so electrical equipment and HVAC systems had to be specified as per customer requirements each time. My role as a support engineer was quite a diverse one and widened my skills to new directions. I did weight estimates utilising structural drawings and steel books etc. I also spent a lot of time putting together document packages for clients so I am familiar with document control processes, data sheets and certificates. More technical responsibilities involved producing cable calculations, specifying correct cables and glands based on industry standards. HVAC systems were an important part of modular design as well the fire and gas systems. I produced cause and effect matrices and took part in Factory Acceptance Tests. I was also the first aider.
  • 4. August 2009 - June 2010 EnerMech Ltd Role: Electrical projects engineer In this role I acquired experience in creating cost reports, timing plans and work packs. My role included responding to customers’ requests for quotations and taking charge of the project from there on. This involved creating a cost estimate and a project timing plan as well as procurement of parts. My main project was an operator’s cabin exchange from two of the cranes on an offshore oil platform. It was my responsibility to create cable calculations and electrical equipment list and to liaise with mechanical engineers as well as technicians offshore. May 2006 - August 2009 National Oilwell Varco, Rig Solutions, Montrose Role: Electrical projects engineer / designer In collaboration with designers, technicians and document control department, my main responsibility was to upgrade control systems and electrical equipment as per customer request. This role involved creating quotes, doing the procurement all the way to the financial close outs. I was initially employed as an electrical draftsman so I am an experienced user of AutoCAD design tool. References: Available upon request.