際際滷

際際滷Share a Scribd company logo
DEVELOPMENT OF TABLET BASED 
SURVEY & WEB BASED 
MONITORING TOOLS 
FOR GENERAL HEALTH, NUTRITION, WATER & SANITATION 
AND HYGIENE (HNWASH) INFORMATION 
(Pregnant women/ Mothers of Children below Five Years / 
Adolescent Girls) 
Submitted on 16thOctober 2013 by Amit Samanta
Amit Samanta 
Signature 
World Bank 
Seal & Signature 
1 
TABLE OF CONTENTS 
1. Understanding of Software Development Requirement 
2. Logical Flow Chart 
3. Management Approach 
4. Technical Approach 
5. System Features 
6. Tools &Technology 
7. Proposed System Requirement 
8. Delivery Schedule 
9. Cost Breakup 
10. Payment Terms 
11. Terms & Condition 
12. Contract Details
Amit Samanta 
Signature 
World Bank 
Seal & Signature 
2 
1. Understanding of Software Development 
Requirement 
According to my understanding, the Application to be developed is a portable android tablet based solution. It is a 
Native app supported Android Operating System (Jelly Bean & Ice Cream Sandwich) under HCL ME Tablet Connect 
3G 2.0. During installation of software in every tablet, it will prompt for Name, Phone Number, Username & 
Password, with type of user (Surveyor/Supervisor). Based on user selection on SIGN UP app user screen will be 
changed. Username & Password will be required in future to send data in central MYSQL Database. It will be used 
for taking Survey using HCL ME Tablet Connect 3G 2.0 Android Tablet by multiple user. Entry can be made to the 
application during unavailability of Internet Connection. It will also be capable to store data in tablet storage, 
depending upon space availability. On final save of survey data the GPS will capture latitude and longitude 
depending on GPS availability. Surveyor will be able to send completed Survey Data from their tablet to Supervisor 
Tablet via Bluetooth for Review & approve. After that Supervisor will review and approve received survey with 
necessary modification. Approved survey data will be synced to server through Internet connectivity and get deleted 
from tablet simultaneously. Import Button will be available under Supervisor area. Which will track last transferred 
file & import survey data automatically to local tablet database. After successful import of data, file will be deleted 
from tablet memory to release space. But under Surveyor login survey data will be available until & unless manual 
delete button pressed after verification. Multiple Supervisor also linked with respective controller through the 
system. After sync to verified survey data through supervisor, linked controller can view through web based login. 
For any modification required as per last updated survey entry by supervisor, controller can be assigned to linked 
user for rectification process through Web Based System. Assigned user will be able to download assigned survey 
through their panel under Android App. After verification & necessary modification assigned user can sync survey 
data to central server. Until & unless data is verified by the controller, same process will be followed between 
controller & assigned user. After verification by the controller data will be considered as final & will be available for 
dashboard Monitoring Report Generation. Entry form label will support English & Oriya font, but Input fields will be 
in English only. Entry form contain two part, given as follows 
1) CCM Survey 
i. 14 no. of Sections 
ii. More than 600 fields 
2) FLW Survey 
i. 8 no. of Sections 
ii. More than 450 fields 
Web server database will be used to generate Report from various District & Block Wise. Multiple Level of Login will 
be provided to Monitor Data Entry through Tablet, Viewing of entered survey data. User can generate report & 
download in Excel / PDF Format.
Amit Samanta 
Signature 
World Bank 
Seal & Signature 
3 
START 
New Survey 
Survey Recorded 
Send 
Monitoring 
Login 
Sign up 
Export 
Login 
Assign Yes 
No 
Sync 
2. Logical Flow Chart 
Tablet 
Storage 
Screening 
Export 
completed 
survey 
Block 
Report 
Generation 
GP 
Super visor 
Contr oller 
Ent ry 
Person 
Modify Screening 
Modification Screening 
Required 
Modify 
Central 
Server 
Adm in
Amit Samanta 
Signature 
World Bank 
Seal & Signature 
4 
3. Management Approach 
I am dedicated to producing enterprise-wide, state-of-the-art business applications that will enable our clients to 
win the race by keeping pace with where their customers want to go. To that end I will create a standard 
development methodology. This two-step methodology is designed to create timely, effective, and efficient 
solutions that will achieve my clients goals. In this technical proposal, I will illustrate the use of our project 
development methodology to effectively manage and create the application modules, tools. 
These solutions will be developed using leading-edge technology and industry accepted, reliable, and scalable 
architectures. They are intended to leverage an organizations existing infrastructure, resources, and technologies to 
provide a solution that is both measurable and manageable. 
NOTE: While the methodology remains the same, individual processes are adapted to each clients particular needs, 
and deliverables are customized to achieve specific project objectives. Mymethodology represents an iterative 
development model in which the overall effort is broken into multiple releases. In each release, the Surveyproject 
team uses specific activities to achieve the goals outlined for that phase.
Amit Samanta 
Signature 
World Bank 
Seal & Signature 
5 
4. Technical Approach 
Design& Development 
This step is based on the Software Development Plan and the objectives outlined in the Define step. Detailed work 
plans will be developed during this stage that define the look and feel of the application. Concurrently, the team 
shall develop designs for the graphical user interface, application navigation, and system architecture. These will be 
spelled out in the resulting functional specifications and quality assurance plan. 
The process conducted by me directly responds to the clients requirements. Myproposed comprehensive, 
integrated solutions in response to our clients initiatives. My solutions include front-end interface design and 
development, database design, back-end integration and development (including testing), system architectural 
design (suggested 
Key solution components are listed below: 
 System architecture. 
 Front-end design and development. 
 Back-end integration and development. 
 Database design. 
 Packaged software selection APK. 
 QA and testing. 
 Maintenance plan and hosting. 
 Server Downtime Monitoring. 
 Web Monitoring Dashboard. 
 Backup System.
Amit Samanta 
Signature 
World Bank 
Seal & Signature 
6 
5. System Features 
Dash Board Type Search 
Facility 
Report 
Generation 
Survey 
wise 
report 
Assign to 
Verify / 
Modify 
Survey 
Admin Level Over all dash board 
District Level District level dash board 
Block Level Block level dash board 
GP Level GP level dash board 
Village Level Village level dash board 
Controller 
Verified Survey by linked 
supervisor Dashboard 
Tablet Survey 
 Sign up process 
 Survey Reporting 
 Survey Viewing 
 Bluetooth Export 
 Data sync with Central Server 
 Supervisor Login 
 Survey Screening & Modify 
 Software Update 
Web Tools 
 Overall Monitoring 
 Report Generation 
 Search Functionality 
 Generate User Level Credentials 
 Controller Area
Amit Samanta 
Signature 
World Bank 
Seal & Signature 
7 
6. Tools & Technology 
Database Development : SQL Lite , MY-SQL 
Client/Server GUI Development : Dreamweaver, Notepad++, Photoshop 
Web Technologies : PHP, HTML, CSS, AJAX, J-Query, JSON, FLEX 
Graph 
Development Tools : Eclipse, Android Studio, Zend Studio 
Server Type : Linux, Apache 
Server Operating System : Centos 6 or Higher 
RAM : 2 GB 
User Access Capability : 200 at a time 
Storage : 20 GB 
Bandwidth : 200 GB Per month 
Input Device : HCL ME Tablet Connect 3G 2.0 
Tablet Operating System : Ice Cream Sandwich or 
Jelly Bean 
RAM : 1 GB Minimum 
Storage Capacity : Internal / External
Amit Samanta 
Signature 
Linked with 
Supervisor 
World Bank 
Seal & Signature 
8 
7. Proposed System requirement 
This is a web based monitoring system for state of Orissa Survey through Android Portable Tablet system. Through 
this system a user can monitor the overall survey. This is divided into several levels like District (Blocks, Panchayats, 
Villages), Blocks (Panchayats, Villages), Gram Panchayats (Villages) and Villages. Each level has their own monitoring 
system to monitor all sub levels under it. 5 levels of access are giving below. 
Survey User 
System Features: 
Feature of this system is given below. 
Supervisor 
Linked with 
controller 
1. Total graphical user interface based monitoring system 
2. Admin could monitor whole state of Orissa 
3. Date wise monitoring system 
4. Detailed searching facility with following options 
a. Date wise 
b. District wise 
c. Block wise 
d. GP level 
e. Village level 
f. Type of Survey 
g. Indicator Based Custom Reporting (upto 10 nos. of indicators) 
5. Survey report generation in Excel / PDF format with following types 
a. CCM report 
b. FLW report 
6. Roll based user level access creation from admin panel 
Controller 
Can assign 
survey to 
individual 
user 
 District 
 Block 
 GP 
 Village 
Admin 
 Block 
 GP 
 Village 
District 
 GP 
 Village 
Block GP Village
Amit Samanta 
Signature 
World Bank 
Seal & Signature 
9 
8. Delivery Schedule 
Modules Features Timeframe 
1 CCM Survey Entry Version 
.APK file 
 Entry Form 
 Android Software Package (.APK 
File) 
 Software Update from Internet 
30 working days from the 
date of contract excluding of 
Sunday & Other National 
Holidays 
2 FLW Survey Entry Version 
.APK file 
 Entry Form 
 Android Software Package (.APK 
File) 
 Software Update from Internet 
30 working days from the 
date of contract excluding of 
Sunday & Other National 
Holidays 
3 Web Portal Login Admin 
Monitoring 
 Web Login 
 Monitoring Dash Board 
 Counter Graph for District, Block, 
GP 
Within 7 working days from 
the date of 1stModule 
Delivery 
4 Supervisor Survey 
Verification Module linked 
with Module 1 & 2 
 Download new Survey 
 Modify Survey 
 Verify Survey 
45 working days from the 
date of contract excluding of 
Sunday & Other National 
Holidays 
5 Controller Screening 
Verification Module linked 
with Module 4 
 View Survey 
 Verify Survey 
 Assign Survey 
60 working days from the 
date of contract excluding of 
Sunday & Other National 
Holidays 
6 Assigned user by Controller 
linked with module 5 
 Download assigned Survey 
 Modify Survey 
 Send for verification 
60 working days from the 
date of contract excluding of 
Sunday & Other National 
Holidays 
7 Web Portal Login Admin 
Monitoring 
 Details view for entered survey Within 20 working days from 
the date of contract 
8 Web Portal Login Admin 
Monitoring 
 Download reported survey to pdf 
/excel 
Within 30 working days from 
the date of contract 
9 Bug Fixing  Based on existing requirement 30 days after delivery of the 
application & Web 
Monitoring Dashboard 
10 Support & Maintenance  Server Status Monitoring 
 Server Downtime & fixing 
 Web Application Monitoring 
without Error 
 .APK file distribution process 
through Google Play 
8 Months From the date of 
1st Module delivery
Ad

Recommended

MAX State of the Nation: Recent and Upcoming Releases - Mark Petrie
MAX State of the Nation: Recent and Upcoming Releases - Mark Petrie
MAXfocus
Documentation
Documentation
Kalyan A
Webmars Presentation Ver2
Webmars Presentation Ver2
Rajeswaran Muthu Venkatachalam
3g 2 Audit Administration Software Webmars Features
3g 2 Audit Administration Software Webmars Features
Rajeswaran Muthu Venkatachalam
Security Testing In Application Authentication
Security Testing In Application Authentication
RapidValue
Online auction system srs riport
Online auction system srs riport
Dilip Prajapati
Bakery software proposal
Bakery software proposal
mindplanet14
Mobile App Design Proposal
Mobile App Design Proposal
Eze Ikedi
Online birth certificate system and management
Online birth certificate system and management
KARUPPUSAMYSAIPRASAT
OBCS-PPT-sehhia (1).pptx
OBCS-PPT-sehhia (1).pptx
Arunpandiyan20518
Online dating system management project report.pdf
Online dating system management project report.pdf
Kamal Acharya
Online-Voting-System.doc
Online-Voting-System.doc
ShangaviS2
ProjectPDF_pagenumber.docx project documentation
ProjectPDF_pagenumber.docx project documentation
komkar98230
E-Commerce Mobile Sale System
E-Commerce Mobile Sale System
Abhishek Kumar
ForwardMetrics Demo Presentation
ForwardMetrics Demo Presentation
tdaniel2000
Online Food Ordering Web- Application using python
Online Food Ordering Web- Application using python
THESHADOW26
Insurance management system project report.pdf
Insurance management system project report.pdf
Kamal Acharya
ProjectPDF_pagenumber.pdf documentation report
ProjectPDF_pagenumber.pdf documentation report
komkar98230
Online airline reservation system project report.pdf
Online airline reservation system project report.pdf
Kamal Acharya
Banking java project
Banking java project
Tutorial Learners
A Software Engineering Project on Cyber cafe management
A Software Engineering Project on Cyber cafe management
svrohith 9
travel portal for flights booking trave
travel portal for flights booking trave
GNaveenKanth
ghgh.pdf travel portal for flights booking right
ghgh.pdf travel portal for flights booking right
GNaveenKanth
project report on for travel portal for flights booking site
project report on for travel portal for flights booking site
GNaveenKanth
travel portal career flights booking site
travel portal career flights booking site
GNaveenKanth
travel portal for flights bookingn sbite
travel portal for flights bookingn sbite
GNaveenKanth
Shopping-Portal online shopping saystam.docx
Shopping-Portal online shopping saystam.docx
krushnaborade2
Shopping-Portal online shopping saystam.docx
Shopping-Portal online shopping saystam.docx
krushnaborade2
Key Requirements to Successfully Implement Generative AI in Edge DevicesOpt...
Key Requirements to Successfully Implement Generative AI in Edge DevicesOpt...
Edge AI and Vision Alliance
FIDO Alliance Seminar State of Passkeys.pptx
FIDO Alliance Seminar State of Passkeys.pptx
FIDO Alliance

More Related Content

Similar to Android Based Survey - Technical proposal (20)

Online birth certificate system and management
Online birth certificate system and management
KARUPPUSAMYSAIPRASAT
OBCS-PPT-sehhia (1).pptx
OBCS-PPT-sehhia (1).pptx
Arunpandiyan20518
Online dating system management project report.pdf
Online dating system management project report.pdf
Kamal Acharya
Online-Voting-System.doc
Online-Voting-System.doc
ShangaviS2
ProjectPDF_pagenumber.docx project documentation
ProjectPDF_pagenumber.docx project documentation
komkar98230
E-Commerce Mobile Sale System
E-Commerce Mobile Sale System
Abhishek Kumar
ForwardMetrics Demo Presentation
ForwardMetrics Demo Presentation
tdaniel2000
Online Food Ordering Web- Application using python
Online Food Ordering Web- Application using python
THESHADOW26
Insurance management system project report.pdf
Insurance management system project report.pdf
Kamal Acharya
ProjectPDF_pagenumber.pdf documentation report
ProjectPDF_pagenumber.pdf documentation report
komkar98230
Online airline reservation system project report.pdf
Online airline reservation system project report.pdf
Kamal Acharya
Banking java project
Banking java project
Tutorial Learners
A Software Engineering Project on Cyber cafe management
A Software Engineering Project on Cyber cafe management
svrohith 9
travel portal for flights booking trave
travel portal for flights booking trave
GNaveenKanth
ghgh.pdf travel portal for flights booking right
ghgh.pdf travel portal for flights booking right
GNaveenKanth
project report on for travel portal for flights booking site
project report on for travel portal for flights booking site
GNaveenKanth
travel portal career flights booking site
travel portal career flights booking site
GNaveenKanth
travel portal for flights bookingn sbite
travel portal for flights bookingn sbite
GNaveenKanth
Shopping-Portal online shopping saystam.docx
Shopping-Portal online shopping saystam.docx
krushnaborade2
Shopping-Portal online shopping saystam.docx
Shopping-Portal online shopping saystam.docx
krushnaborade2
Online birth certificate system and management
Online birth certificate system and management
KARUPPUSAMYSAIPRASAT
Online dating system management project report.pdf
Online dating system management project report.pdf
Kamal Acharya
Online-Voting-System.doc
Online-Voting-System.doc
ShangaviS2
ProjectPDF_pagenumber.docx project documentation
ProjectPDF_pagenumber.docx project documentation
komkar98230
E-Commerce Mobile Sale System
E-Commerce Mobile Sale System
Abhishek Kumar
ForwardMetrics Demo Presentation
ForwardMetrics Demo Presentation
tdaniel2000
Online Food Ordering Web- Application using python
Online Food Ordering Web- Application using python
THESHADOW26
Insurance management system project report.pdf
Insurance management system project report.pdf
Kamal Acharya
ProjectPDF_pagenumber.pdf documentation report
ProjectPDF_pagenumber.pdf documentation report
komkar98230
Online airline reservation system project report.pdf
Online airline reservation system project report.pdf
Kamal Acharya
A Software Engineering Project on Cyber cafe management
A Software Engineering Project on Cyber cafe management
svrohith 9
travel portal for flights booking trave
travel portal for flights booking trave
GNaveenKanth
ghgh.pdf travel portal for flights booking right
ghgh.pdf travel portal for flights booking right
GNaveenKanth
project report on for travel portal for flights booking site
project report on for travel portal for flights booking site
GNaveenKanth
travel portal career flights booking site
travel portal career flights booking site
GNaveenKanth
travel portal for flights bookingn sbite
travel portal for flights bookingn sbite
GNaveenKanth
Shopping-Portal online shopping saystam.docx
Shopping-Portal online shopping saystam.docx
krushnaborade2
Shopping-Portal online shopping saystam.docx
Shopping-Portal online shopping saystam.docx
krushnaborade2

Recently uploaded (20)

Key Requirements to Successfully Implement Generative AI in Edge DevicesOpt...
Key Requirements to Successfully Implement Generative AI in Edge DevicesOpt...
Edge AI and Vision Alliance
FIDO Alliance Seminar State of Passkeys.pptx
FIDO Alliance Seminar State of Passkeys.pptx
FIDO Alliance
ReSTIR [DI]: Spatiotemporal reservoir resampling for real-time ray tracing ...
ReSTIR [DI]: Spatiotemporal reservoir resampling for real-time ray tracing ...
revolcs10
A Constitutional Quagmire - Ethical Minefields of AI, Cyber, and Privacy.pdf
A Constitutional Quagmire - Ethical Minefields of AI, Cyber, and Privacy.pdf
Priyanka Aash
AI VIDEO MAGAZINE - June 2025 - r/aivideo
AI VIDEO MAGAZINE - June 2025 - r/aivideo
1pcity Studios, Inc
"How to survive Black Friday: preparing e-commerce for a peak season", Yurii ...
"How to survive Black Friday: preparing e-commerce for a peak season", Yurii ...
Fwdays
FIDO Seminar: New Data: Passkey Adoption in the Workforce.pptx
FIDO Seminar: New Data: Passkey Adoption in the Workforce.pptx
FIDO Alliance
Powering Multi-Page Web Applications Using Flow Apps and FME Data Streaming
Powering Multi-Page Web Applications Using Flow Apps and FME Data Streaming
Safe Software
Tech-ASan: Two-stage check for Address Sanitizer - Yixuan Cao.pdf
Tech-ASan: Two-stage check for Address Sanitizer - Yixuan Cao.pdf
caoyixuan2019
War_And_Cyber_3_Years_Of_Struggle_And_Lessons_For_Global_Security.pdf
War_And_Cyber_3_Years_Of_Struggle_And_Lessons_For_Global_Security.pdf
biswajitbanerjee38
Raman Bhaumik - Passionate Tech Enthusiast
Raman Bhaumik - Passionate Tech Enthusiast
Raman Bhaumik
CapCut Pro Crack For PC Latest Version {Fully Unlocked} 2025
CapCut Pro Crack For PC Latest Version {Fully Unlocked} 2025
pcprocore
Information Security Response Team Nepal_npCERT_Vice_President_Sudan_Jha.pdf
Information Security Response Team Nepal_npCERT_Vice_President_Sudan_Jha.pdf
ICT Frame Magazine Pvt. Ltd.
AI vs Human Writing: Can You Tell the Difference?
AI vs Human Writing: Can You Tell the Difference?
Shashi Sathyanarayana, Ph.D
Securing Account Lifecycles in the Age of Deepfakes.pptx
Securing Account Lifecycles in the Age of Deepfakes.pptx
FIDO Alliance
Security Tips for Enterprise Azure Solutions
Security Tips for Enterprise Azure Solutions
Michele Leroux Bustamante
The Future of Data, AI, and AR: Innovation Inspired by You.pdf
The Future of Data, AI, and AR: Innovation Inspired by You.pdf
Safe Software
Connecting Data and Intelligence: The Role of FME in Machine Learning
Connecting Data and Intelligence: The Role of FME in Machine Learning
Safe Software
FIDO Seminar: Authentication for a Billion Consumers - Amazon.pptx
FIDO Seminar: Authentication for a Billion Consumers - Amazon.pptx
FIDO Alliance
Enhance GitHub Copilot using MCP - Enterprise version.pdf
Enhance GitHub Copilot using MCP - Enterprise version.pdf
Nilesh Gule
Key Requirements to Successfully Implement Generative AI in Edge DevicesOpt...
Key Requirements to Successfully Implement Generative AI in Edge DevicesOpt...
Edge AI and Vision Alliance
FIDO Alliance Seminar State of Passkeys.pptx
FIDO Alliance Seminar State of Passkeys.pptx
FIDO Alliance
ReSTIR [DI]: Spatiotemporal reservoir resampling for real-time ray tracing ...
ReSTIR [DI]: Spatiotemporal reservoir resampling for real-time ray tracing ...
revolcs10
A Constitutional Quagmire - Ethical Minefields of AI, Cyber, and Privacy.pdf
A Constitutional Quagmire - Ethical Minefields of AI, Cyber, and Privacy.pdf
Priyanka Aash
AI VIDEO MAGAZINE - June 2025 - r/aivideo
AI VIDEO MAGAZINE - June 2025 - r/aivideo
1pcity Studios, Inc
"How to survive Black Friday: preparing e-commerce for a peak season", Yurii ...
"How to survive Black Friday: preparing e-commerce for a peak season", Yurii ...
Fwdays
FIDO Seminar: New Data: Passkey Adoption in the Workforce.pptx
FIDO Seminar: New Data: Passkey Adoption in the Workforce.pptx
FIDO Alliance
Powering Multi-Page Web Applications Using Flow Apps and FME Data Streaming
Powering Multi-Page Web Applications Using Flow Apps and FME Data Streaming
Safe Software
Tech-ASan: Two-stage check for Address Sanitizer - Yixuan Cao.pdf
Tech-ASan: Two-stage check for Address Sanitizer - Yixuan Cao.pdf
caoyixuan2019
War_And_Cyber_3_Years_Of_Struggle_And_Lessons_For_Global_Security.pdf
War_And_Cyber_3_Years_Of_Struggle_And_Lessons_For_Global_Security.pdf
biswajitbanerjee38
Raman Bhaumik - Passionate Tech Enthusiast
Raman Bhaumik - Passionate Tech Enthusiast
Raman Bhaumik
CapCut Pro Crack For PC Latest Version {Fully Unlocked} 2025
CapCut Pro Crack For PC Latest Version {Fully Unlocked} 2025
pcprocore
Information Security Response Team Nepal_npCERT_Vice_President_Sudan_Jha.pdf
Information Security Response Team Nepal_npCERT_Vice_President_Sudan_Jha.pdf
ICT Frame Magazine Pvt. Ltd.
AI vs Human Writing: Can You Tell the Difference?
AI vs Human Writing: Can You Tell the Difference?
Shashi Sathyanarayana, Ph.D
Securing Account Lifecycles in the Age of Deepfakes.pptx
Securing Account Lifecycles in the Age of Deepfakes.pptx
FIDO Alliance
Security Tips for Enterprise Azure Solutions
Security Tips for Enterprise Azure Solutions
Michele Leroux Bustamante
The Future of Data, AI, and AR: Innovation Inspired by You.pdf
The Future of Data, AI, and AR: Innovation Inspired by You.pdf
Safe Software
Connecting Data and Intelligence: The Role of FME in Machine Learning
Connecting Data and Intelligence: The Role of FME in Machine Learning
Safe Software
FIDO Seminar: Authentication for a Billion Consumers - Amazon.pptx
FIDO Seminar: Authentication for a Billion Consumers - Amazon.pptx
FIDO Alliance
Enhance GitHub Copilot using MCP - Enterprise version.pdf
Enhance GitHub Copilot using MCP - Enterprise version.pdf
Nilesh Gule
Ad

Android Based Survey - Technical proposal

  • 1. DEVELOPMENT OF TABLET BASED SURVEY & WEB BASED MONITORING TOOLS FOR GENERAL HEALTH, NUTRITION, WATER & SANITATION AND HYGIENE (HNWASH) INFORMATION (Pregnant women/ Mothers of Children below Five Years / Adolescent Girls) Submitted on 16thOctober 2013 by Amit Samanta
  • 2. Amit Samanta Signature World Bank Seal & Signature 1 TABLE OF CONTENTS 1. Understanding of Software Development Requirement 2. Logical Flow Chart 3. Management Approach 4. Technical Approach 5. System Features 6. Tools &Technology 7. Proposed System Requirement 8. Delivery Schedule 9. Cost Breakup 10. Payment Terms 11. Terms & Condition 12. Contract Details
  • 3. Amit Samanta Signature World Bank Seal & Signature 2 1. Understanding of Software Development Requirement According to my understanding, the Application to be developed is a portable android tablet based solution. It is a Native app supported Android Operating System (Jelly Bean & Ice Cream Sandwich) under HCL ME Tablet Connect 3G 2.0. During installation of software in every tablet, it will prompt for Name, Phone Number, Username & Password, with type of user (Surveyor/Supervisor). Based on user selection on SIGN UP app user screen will be changed. Username & Password will be required in future to send data in central MYSQL Database. It will be used for taking Survey using HCL ME Tablet Connect 3G 2.0 Android Tablet by multiple user. Entry can be made to the application during unavailability of Internet Connection. It will also be capable to store data in tablet storage, depending upon space availability. On final save of survey data the GPS will capture latitude and longitude depending on GPS availability. Surveyor will be able to send completed Survey Data from their tablet to Supervisor Tablet via Bluetooth for Review & approve. After that Supervisor will review and approve received survey with necessary modification. Approved survey data will be synced to server through Internet connectivity and get deleted from tablet simultaneously. Import Button will be available under Supervisor area. Which will track last transferred file & import survey data automatically to local tablet database. After successful import of data, file will be deleted from tablet memory to release space. But under Surveyor login survey data will be available until & unless manual delete button pressed after verification. Multiple Supervisor also linked with respective controller through the system. After sync to verified survey data through supervisor, linked controller can view through web based login. For any modification required as per last updated survey entry by supervisor, controller can be assigned to linked user for rectification process through Web Based System. Assigned user will be able to download assigned survey through their panel under Android App. After verification & necessary modification assigned user can sync survey data to central server. Until & unless data is verified by the controller, same process will be followed between controller & assigned user. After verification by the controller data will be considered as final & will be available for dashboard Monitoring Report Generation. Entry form label will support English & Oriya font, but Input fields will be in English only. Entry form contain two part, given as follows 1) CCM Survey i. 14 no. of Sections ii. More than 600 fields 2) FLW Survey i. 8 no. of Sections ii. More than 450 fields Web server database will be used to generate Report from various District & Block Wise. Multiple Level of Login will be provided to Monitor Data Entry through Tablet, Viewing of entered survey data. User can generate report & download in Excel / PDF Format.
  • 4. Amit Samanta Signature World Bank Seal & Signature 3 START New Survey Survey Recorded Send Monitoring Login Sign up Export Login Assign Yes No Sync 2. Logical Flow Chart Tablet Storage Screening Export completed survey Block Report Generation GP Super visor Contr oller Ent ry Person Modify Screening Modification Screening Required Modify Central Server Adm in
  • 5. Amit Samanta Signature World Bank Seal & Signature 4 3. Management Approach I am dedicated to producing enterprise-wide, state-of-the-art business applications that will enable our clients to win the race by keeping pace with where their customers want to go. To that end I will create a standard development methodology. This two-step methodology is designed to create timely, effective, and efficient solutions that will achieve my clients goals. In this technical proposal, I will illustrate the use of our project development methodology to effectively manage and create the application modules, tools. These solutions will be developed using leading-edge technology and industry accepted, reliable, and scalable architectures. They are intended to leverage an organizations existing infrastructure, resources, and technologies to provide a solution that is both measurable and manageable. NOTE: While the methodology remains the same, individual processes are adapted to each clients particular needs, and deliverables are customized to achieve specific project objectives. Mymethodology represents an iterative development model in which the overall effort is broken into multiple releases. In each release, the Surveyproject team uses specific activities to achieve the goals outlined for that phase.
  • 6. Amit Samanta Signature World Bank Seal & Signature 5 4. Technical Approach Design& Development This step is based on the Software Development Plan and the objectives outlined in the Define step. Detailed work plans will be developed during this stage that define the look and feel of the application. Concurrently, the team shall develop designs for the graphical user interface, application navigation, and system architecture. These will be spelled out in the resulting functional specifications and quality assurance plan. The process conducted by me directly responds to the clients requirements. Myproposed comprehensive, integrated solutions in response to our clients initiatives. My solutions include front-end interface design and development, database design, back-end integration and development (including testing), system architectural design (suggested Key solution components are listed below: System architecture. Front-end design and development. Back-end integration and development. Database design. Packaged software selection APK. QA and testing. Maintenance plan and hosting. Server Downtime Monitoring. Web Monitoring Dashboard. Backup System.
  • 7. Amit Samanta Signature World Bank Seal & Signature 6 5. System Features Dash Board Type Search Facility Report Generation Survey wise report Assign to Verify / Modify Survey Admin Level Over all dash board District Level District level dash board Block Level Block level dash board GP Level GP level dash board Village Level Village level dash board Controller Verified Survey by linked supervisor Dashboard Tablet Survey Sign up process Survey Reporting Survey Viewing Bluetooth Export Data sync with Central Server Supervisor Login Survey Screening & Modify Software Update Web Tools Overall Monitoring Report Generation Search Functionality Generate User Level Credentials Controller Area
  • 8. Amit Samanta Signature World Bank Seal & Signature 7 6. Tools & Technology Database Development : SQL Lite , MY-SQL Client/Server GUI Development : Dreamweaver, Notepad++, Photoshop Web Technologies : PHP, HTML, CSS, AJAX, J-Query, JSON, FLEX Graph Development Tools : Eclipse, Android Studio, Zend Studio Server Type : Linux, Apache Server Operating System : Centos 6 or Higher RAM : 2 GB User Access Capability : 200 at a time Storage : 20 GB Bandwidth : 200 GB Per month Input Device : HCL ME Tablet Connect 3G 2.0 Tablet Operating System : Ice Cream Sandwich or Jelly Bean RAM : 1 GB Minimum Storage Capacity : Internal / External
  • 9. Amit Samanta Signature Linked with Supervisor World Bank Seal & Signature 8 7. Proposed System requirement This is a web based monitoring system for state of Orissa Survey through Android Portable Tablet system. Through this system a user can monitor the overall survey. This is divided into several levels like District (Blocks, Panchayats, Villages), Blocks (Panchayats, Villages), Gram Panchayats (Villages) and Villages. Each level has their own monitoring system to monitor all sub levels under it. 5 levels of access are giving below. Survey User System Features: Feature of this system is given below. Supervisor Linked with controller 1. Total graphical user interface based monitoring system 2. Admin could monitor whole state of Orissa 3. Date wise monitoring system 4. Detailed searching facility with following options a. Date wise b. District wise c. Block wise d. GP level e. Village level f. Type of Survey g. Indicator Based Custom Reporting (upto 10 nos. of indicators) 5. Survey report generation in Excel / PDF format with following types a. CCM report b. FLW report 6. Roll based user level access creation from admin panel Controller Can assign survey to individual user District Block GP Village Admin Block GP Village District GP Village Block GP Village
  • 10. Amit Samanta Signature World Bank Seal & Signature 9 8. Delivery Schedule Modules Features Timeframe 1 CCM Survey Entry Version .APK file Entry Form Android Software Package (.APK File) Software Update from Internet 30 working days from the date of contract excluding of Sunday & Other National Holidays 2 FLW Survey Entry Version .APK file Entry Form Android Software Package (.APK File) Software Update from Internet 30 working days from the date of contract excluding of Sunday & Other National Holidays 3 Web Portal Login Admin Monitoring Web Login Monitoring Dash Board Counter Graph for District, Block, GP Within 7 working days from the date of 1stModule Delivery 4 Supervisor Survey Verification Module linked with Module 1 & 2 Download new Survey Modify Survey Verify Survey 45 working days from the date of contract excluding of Sunday & Other National Holidays 5 Controller Screening Verification Module linked with Module 4 View Survey Verify Survey Assign Survey 60 working days from the date of contract excluding of Sunday & Other National Holidays 6 Assigned user by Controller linked with module 5 Download assigned Survey Modify Survey Send for verification 60 working days from the date of contract excluding of Sunday & Other National Holidays 7 Web Portal Login Admin Monitoring Details view for entered survey Within 20 working days from the date of contract 8 Web Portal Login Admin Monitoring Download reported survey to pdf /excel Within 30 working days from the date of contract 9 Bug Fixing Based on existing requirement 30 days after delivery of the application & Web Monitoring Dashboard 10 Support & Maintenance Server Status Monitoring Server Downtime & fixing Web Application Monitoring without Error .APK file distribution process through Google Play 8 Months From the date of 1st Module delivery