1. The document discusses issues with existing EHV circuit breaker closing interlocks and proposes additional logic to improve safety.
2. Case studies describe instances where circuit breakers closed unexpectedly due to failures in the closing interlock circuits, posing dangers to equipment and the power system.
3. To address this, the authors propose adding a normally open contact in the negative side of the closing coil circuit. Additional logic would prevent the contact from unexpectedly closing, while allowing operators to override if needed. This aims to cut power to the closing coil if the interlock circuits fail.
1 of 10
Download to read offline
More Related Content
Time to think for ehv cb interlocks
1. TIME TO THINK FOR EXTRA CLOSING
INTERLOCK FOR EHV CIRCUIT BREAKERS
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 1
12th IndiaDoble Power Forum, 2014
Niraj Agrawal & Chetan Shete
ADANI POWER LIMITED , TIRORA
D
oble
Engineering
2. PRESENT SITUATION
FOLLOWING ARE COVERED IN EHV CB
CLOSING INTERLOCK
1. TRIP CIRCUIT SUPERVISION
2. LOCKOUT RELAY RESET
3. ALL PROTECTION RELAY RESET
4. SF6 LEVEL OK & SPRING IS CHARGED
5. BOTH DC HEATHY
6. AC SUPPLY OK
7. PDR NOR OPERATED
8. ADJACENT ISOLATOR CLOSED.
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 2
D
oble
Engineering
3. CASE STUDY-1
ON 4TH JULY 2013 , CB OF 400KV WARORA-
TIRORA LINE CLOSED & OPENED > 20 TIMES.
1. 400KV WARORA TIRORA LINE HAND TRIPED FROM TIRORA END .
2. 400KV TIE & MAIN CB AT WARORA OPENED SUCCESFULLY BUT MAIN
CB CLOSED FREQUENTLY SUBSEQUENT TO OPENING OF CB POLES.
3. RESULTING IN FREQUENT CHARGING OF OPEN-ENDED LINE FOR TWO
PHASES ( R & B).
4. FLICKRING OF LIGHTS & CHARGING DISCHARGING SOUND WAS
NOTED.
5. OVERVOLTAGE STAGES TRIGGRED NO OF TIMES ..DANGER TO EHV
EQUIPMENTS.
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 3
D
oble
Engineering
4. CASE STUDY-1
FINDINGS.
1. MOISTURE INGRESS IN MECHANISM BOX , SPRING CHARGE LIMIT
SWITCH OF Y -POLE.
2. CB CLOSE INTERLOCK & CB HEALTHY CONTACTS GOT SHORTED DUE TO
MOISTURE INGRESS. RESULTING IN FAILURE OF CLOSING COIL , DUE
TO CONTINEOUS DC POSITIVE TO COIL.
3. CONTROL CIRCUITARY IS RESPONSIBLE FOR FREQUENT CLOSE /OPEN
OPERATION OF CB AFTER SHORTING OF CONTACTS.
4. CB POLES WERE OPENING ON PDR & AGAIN CLOSING FOR ONLY TWO
PHASES (R &B).
5. CONTINUES UNTILL MANUAL DC OFF BY OPERATOR.
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 4
D
oble
Engineering
5. CASE STUDY-2
ON 17TH JAN 2014 , 400KV CB OF GT#3
CLOSED ON FAULT.
1. GT#3 , 400KV CB TRIPPED ON FAILURE OF B-PHASE GT HV BUSHING .
2. ALL CONTROL CABLES FROM NEAR BY TRENCHES BURNT DUE OIL
SPILLAGE & FIRE.
3. 400KV MAIN CB CLOSED ON FAULT DUE TO SHORTING OF CLOSING
COMMAND CONTROL CABLE.
4. RESULTING IN MORE DANGEROUS CONDITION FOR SYSTEM.
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 5
D
oble
Engineering
6. WHAT CAN BE DONE ?
1. SEGREGATE AUXILLIARY CONTACTS RELATING TO CB CLOSING CIRCUIT
APART FROM OTHER CONTACTS CARRYING DC +VE SUPLY.
2. ROUTE CB CLOSING CIRCUIT CABLES AWAY FROM GT AREA .
ABOVE SOLUTIONS ARE NOT 100% FULL PROOF , CAN WE CUT CLOSING
CIRCUIT AT TWO POINTS 1. +VE SIDE ( USUALLY DONE) 2. VE SIDE
(INTENDED) ?.....
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 6
D
oble
Engineering
7. PROPOSED INTERLOCK IN CB CLOSING
CIRCUIT
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 7
BCU OUTPUT
CONTACT TO CUT
NEGATIVE OF
CLOSING COIL
D
oble
Engineering
8. LOGIC FOR CB CLOSING CIRCUIT
PROPOSED INTERLOCK
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 8
Reset Logic
(Except Line)
Reset Logic for Lines.
( Considering Auto
Reclose Operation)
D
oble
Engineering
9. PROPOSED INTERLOCK IN CLOSING
CIRCUIT
12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 9
Possibility of unwanted SET ON of Negative
Break contact for closing circuit is as follows
1. Restarting of BCU/IED/ SAS Server
a. Normally Open contact is used .
b. All inputs for logic are normally in reset condition (No internally
inverted signal is used), so possibility of closing of contact during
restarting of IED/BCU/SAS server is NIL.
2. SET & RESET control for same is given to Shift
engineer through OWS ( Operating work station ) ,
which helps during on time change in decision of
closing of circuit breaker.
D
oble
Engineering
10. 12th IndiaDoble Power Forum, 2014,
Vadodara, Gujarat, INDIA 10