The document presents 34 photos documenting the construction progress of various areas of Lakeview City Phase 2 from May 16th to 22nd, 2017. The photos show work ongoing on residential blocks EL1 through EL6 and CL2.1 through CL5.2, as well as the swimming pool, water retention pond, viewing plaza, walkways around the pond, viewing deck, and main entrance gate.
1 of 34
Download to read offline
More Related Content
Tiến độ xây dựng dự án Lakeview City ngày 24/05/2017
31. www.novaland.com.vn
31
LAKEVIEW CITY – PHASE 2
HÌNH ẢNH THI CÔNG LÁT GẠCH LỐI ĐI BỘ QUANH HỒ
Lát gạch lối đi bộ quanh hồ
Vị trí khu vực đã thi công lát gạch