Phase 1 UpdatesCisco UCS ImplementationJerry BishopBlog.thehigheredcio.comAttribution-ShareAlike 3.0 Unported?(CC BY-SA 3.0)
Phase 1 Status SummaryInstalled (racked) March 8, 2011Read Private Clouds Here We Come for summary of installation and planMinor issues with firmware on UCS and NetApp and zoningMigrations completedESX cluster migrated and ~130 VM¡¯sMS Exchange & SharePoint clustersInfrastructure and domain services platformsSCCM etc¡­
Phase 2 ScopeCitrix (After Hyper-V Conversion)Production SQL clusterProduction SharePoint SQL clusterOCS & LiveMeetingCall ManagerIPCC & Unity VMWebWasher
Physical and power gainsFootprint and power savings at collocation site
Initial Rack Layout at Colo SiteColo Rental$600/mo each5 Racks 94% Full(14-U open)Colo Power$0.25 per KWH18,000 KWHColo Cost$7,500 per mo.
UCS Phase 1 (<30 Days) ProgressColo Rental$600/mo each5 Racks 66% Full(50-U open)Colo Power$0.25 per KWH13,600 KWHColo Cost$1,100 mo savings$13K annual
UCS Phase 2 (End of May) Rack PlanColo Rental$600/mo each4 Racks 73% Full(45-U open)Colo Power$0.25 per KWHTBD KWHColo Costs~$3,100  mo savings41%+ annual reduction
Cable plant
UCS Connectivity
UCS Wire Map
UCS Cabling
Ucs console imagesCIO Eye Candy from UCS Manager
UCS Logical Display
Chassis Display
Fabric Display
Performance gainsMore CIO Eye Candy
ESX Cluster CPU Utilization
Processor & Memory Utilization
Power Consumption
Questions?Jerry BishopBlog.thehigheredcio.com