This document provides information about Imperative Engineering, including details about the company's establishment in 2005 and the services it provides in various engineering fields. It discusses the company's credentials and commitment to quality work. The following pages include a complete company profile with details of projects undertaken in the last eight years. The company is confident that potential clients will choose to work with Imperative Engineering after reviewing its profile.
1 of 20
Download to read offline
More Related Content
Update profile 2015
1. In the Name of ALLAH
the most Beneficent the most Merciful.
Introduction
IMPERATIVE ENGINEERING established in 2005, is a firm of Civil, Electrical,
Communication, Automation, mechanical and HVAC Engineers, which provides Engineering
services of high quality in the fields of Civil, Electrical, Communication, Automation, Air
conditioning & Mechanical works. It has reputed Engineers with allied staff having the necessary
experience and know-how in offering field. We offer most comprehensive contracting services
for efficient and economic handling and execution of all projects of importance, with major
emphasis in the offering fields.
The firm has outstanding credentials from both stand points of qualification and experience. The
Personnel working with us have vast experience of completing projects from planning stage to
commissioning. We base our policies on honesty and give foremost priority to maintain the
quality of work.
Following pages entails complete company profile of IMPERATIVE ENGINEERING
including details of projects undertaken during last eight years. We are confident that after going
through our profile you will enlist our company with your esteemed organization for all your
future Electrical, Communication, Automation, Mechanical, HVAC and allied works. We are
committed for executing the assignments most professionally.
For IMPERATIVE ENGINEERING
3. Bio data of Key Person
ABID ALI
ADDRESS:
House # 1170, Street # 5, L.A.C-II, K.A.E.C.H.S,
Karachi, Pakistan
( #: 0333-2312452 / 0300 8910589
PERSONAL:
NAME: ABID ALI
FATHER’S NAME: ASGHAR ALI
DATE OF BIRTH: 19th NOVEMBER 1969
N.I.C. #: 42101-7321213-7
DRIVING LIC. #: 42071 / ND
QUALIFICATION
Professional: 1- Bachelor of Technology in Electrical (B. Tech Honors).
2- Diploma of Associate Engineer in Electrical Technology with 1st.
Division from Government College of Engineering & Technology Site,
Karachi in 1992.
Planning: 1- Primavera Project Planner P3 in 2005
Computer: 2- Windows, Ms Word, and Ms Excel. In 1999
Design: 3- Auto CAD short course, in 2000
Training Program: 4- PLC. Programmable logic control in 2005
4. SUMMARY OF PROFESSIONAL EXPERIENCE:
About 18 years professional experience in the field of high profile Industrial Projects, Designing,
Planning & Monitoring and Project management of Operation & Maintenance of Steel Pipe Mill, Oil,
Fertilizer, Pharmaceutical, Textile, Sub Stations, Multistory Buildings, Hospitals, Hotel / Club etc.
RESPONSIBILITIES:
A. Project Costing & tendering
Ø Draw material quantity from drawing for costing
Ø Up date suppliers & manufacturer rates from market.
Ø Costing & estimation of project.
Ø Preparation of summary sheet of tender cost.
Ø Work out on individual head.
Ø Calculation of manpower hours of project.
Ø Preparation of running bill, final bill & extra item bills.
B. Project Planning, Scheduling & Monitoring
Ø Draw out all activities of project on Primavera P3.
Ø Schedule all activities as planning technique.
Ø Preparation of Project phases & levels.
Ø Preparation of Activities in different grouping or heads.
Ø Scheduling of material procurement & supply.
Ø Scheduling of engineering, construction, commissioning & testing.
Ø Preparation of Work Breakdown Structure. (WBS)
Ø Progress monitoring.
Ø Monitoring of project on daily, weekly & monthly bases.
Ø Review of schedule as per progress leading & lagging activities.
Ø Report writing of progress & meetings.
Ø Preparation of running bills & final bill through schedule.
DETAIL OF PROJECTS & ORGANIZATION:
1. PERIOD : August 30, 2005 to dated
POSITION : Chief Executive
ORGANIZATION: Imperative engineering
Mubarak Electrical Cont. & Suppliers
2. PERIOD : January 01, 2005 to August 28, 2005
POSITION : Project Manager
PROJECTS : Marion Laboratory (Pvt.) Ltd. Pakistan
(D-43 SITE) Karachi.
ORGANIZATION: Marion Laboratory (Pvt.) Ltd. Pakistan
5. 3. PERIOD : September 20, 2002 to May 31, 2005
POSITION : Electrical Manager
PROJECT : Shashi Steel Pipe Works (Pvt.) Ltd.
A Manufacturing Unit of White Oil Pipe Line
Project
ORGANIZATION: China Petroleum Engineering Construction
Corporation &
Techno Engineering Service (Pvt.) Ltd.
(A joint venture project)
4. PERIOD : January 1, 1999 to September 11, 2002
POSITION : Electrical & Planning Engineer
PROJECTS : 1. ZAFA Pharmaceutical (Pvt.) Ltd. Karachi.
(Sohrab Goth)
2. Harmonic Div. Famila – 28
(SITE-II Super H. way)
3. Soft Gelatin (SITE-II Super H. way)
4. Zafa Beta leucotom (SITE-II Super H.way)
5. Zafa Hub (Hub Ind. Estate)
6. Zafa F.B. Area (Federal B. Area)
ORGANIZATION: ZAFA Pharmaceutical (Pvt.) Ltd. Karachi.
5. PERIOD : 19 October 1996 to 11 December 1998.
POSITION : Electrical Supervisor (2nd In-charge)
PROJECT : FFC - Jordan Fertilizer Complex at Bin Qasim,
KARACHI. (Ammonia, Urea & DAP Plant)
ORGANIZATION: HABIB RAFIQ (Pvt.) Limited
(Partner of international consortium)
HABIB RAFIQ Pakistan
DESCON Pakistan
KLOCKNER Germany
KREBS France
6. PERIOD : 01 January 1995 to 30th September 1996
POSITION : Maintenance Supervisor.
ORGANIZATION: Karachi Club, Karachi.
7. PERIOD : 07th February 1993 to 11th August 1994
POSITION : Supervisor
PROJECT :
1. Lever Brother Pakistan (Pvt.) Limited (Oil Refinery SITE)
2. Sindh Institute of Urology Transplantation (SIUT) Karachi
ORGANIZATION: HI-LITE Electric Company & dmt. Engineering,
Karachi
6. Ø M/S. NOVARTIS PHARMACUTICAL PAKISTAN LTD.
INSTALLATION OF HVAC SYSTEM
Worth of Project : 8.50 Million
Consultant : A. Saadat & Co.
Nature of job : Installation of HVAC System in New
Expansion two story building,
Installation of AHUs, D-Humidifier,
Dust-collectors, Exhaust blower / Fan,
Pumps, Fir Dampers, Power panel, Cable
Try, Cables, General wiring, etc.
Ø M/S. PRIME TOOLING CO. (Pvt.) Ltd.
Supply & Installation of 250 kVA. PMT.
Worth of Project : 1.5 Million
Consultant : Clint Job.
Nature of job : Supply & Installation of 250 kVA PMT,
Including PMT structure, H.T Spain,
400 Amps. Breaker, DO cutout, Earthing,
Complete in all Respects. Supply &
Installation of LT Cable & PFI correction
Panel.
Ø M/S. FFBL (BIN QASIM)
SUPPLY & INSTALLATION OF FLOD LIGHTS
Worth of Project : 1.15 Million
Consultant : Trunkey bases Job
Nature of job : Dismantling of old 125 W Street lights &
Replacement of 250 W lights on Existing
poles.
7. Ø M/S. PAKHUA INDUSTRIES LTD.
Electrification of Three Story Building in EPZ. Karachi
Worth of Project : 3.68 Million
Consultant : Clint Job
Nature of job : Electrification of three story textile building,
Supply & Installation of power panel,
Cables, General wiring, lighting & fan etc.
Ø M/S. Brooks Pharmaceutical (Pvt.) Ltd.
Electrification of Air conditioning & Ventilation System
Worth of Project : 3.36 Million
Consultant : Y.H Associates
Nature of job : Supply & Installation of Power Panel /MCC,
Power wiring of Chiller, cooling tower,
Pump, AHU & Ex. fan etc.
Ø M/S. Nexus Pharmaceutical
Construction of Adjacent Ware House + 2 floors
Worth of Project : 10.25 Million
Consultant : Trunkey bases Job
Nature of Civil job : Designing & construction of G. floor as
ware house, F. floor as product storage &
quarantine, second floor as pray area,
recreation area & canteen etc.
8. Ø M/S. SUPARCO EMPLOYEES CO-OPERATIVE HOUSING SOCIETY LTD,
Karachi
Electrification Works of 30 acre housing Society
Worth of Electrification : 22.66 Million
Basic Design : KESC Ltd.
Major Equipment :
VCBs = 4 Nos. 11 kVA, 630 A,
Transformer=1 No. 500 kVA 11kVA/420V 3 Phase
Transformer=2 No. 250 kVA 11kVA/420V 3 Phase
Transformer=1 No. 200 kVA 11kVA/420V 3 Phase
H.T. Pole & L.T. Pole.
3000 Kg Copper & 4500 Kg
Aluminum conductor, Street
lighting, L.T. panel, Etc.
Distribution Elec. Load : 1 Mega Watt
9. Ø M/S. NATIONAL INDUSTRIAL PARK BIN QASIM (BQIP)
Electrification of Gate Office & Road Lighting works
Worth of Electrification : 10.4 Million
Distribution Elect. Load : 50 Kilo Watt
Consultant : Engineering Associates
Nature of job : Supply & Installation of Power Panel / DBs
Power feeder, Sub feeder of Street light pole (make
Petit jon France) wiring of office building, wiring of
voice & data etc.
10. Ø M/S. HI-TECH ENGINEERING (PVT.) LTD.
A unit of Steel Pipe mill & Polyethylene Pipe Engineering Industries
Installation & Networking of Ultrasonic Unit (online & off line)
Worth of Project : 2.5 Lac
Consultant : Clint job
Major Equipment : 16 Probe & 8 Probe units.
Ø M/S. MEHRUNNISA WELFARE TRUST (HOSPITAL)
Air conditioning & Ventilation System
Worth of Project : 9.36 Million
Consultant : Y.H Associates
Major Equipment : Supply & Installation of 130 Nos.
Split Type Unit
Ø M/S. INDIAN EMBASSY – KARACHI
Electrification of Air Conditioning & Ventilation Systems
Worth of Electrification : 4.5 Lac
Consultant : Y.H. Associates.
Nature of job : Supply & Installation of / MCCs
Power wiring of 11 AHU’s, 1 Absorption Chiller,
Split Units, MCCs, etc.
Ø M/S. MERCK MARKER (PVT.) LTD, QUETTA
Electrification & BMS networking of HVAC systems of soft foam
Worth of Electrification : 9 Lac
Consultant : Maam Associates
Nature of job : Installation of MCC, Power wiring of
dust collector, AHU & ex. fan, control
wiring of BMS etc.
11. Ø M/S. BOSCH PHARMA (PVT.) LTD.
Electrification of HVAC Systems
Worth of Electrification : 21 Lac
Consultant : Y.H Associates
Nature of job : Supply & Installation of Power Panel / MCC
Power wiring of Chiller, Pump,
AHU & E. fan etc.
Ø M/S. MEMON MEDICAL INSTITUTE (Safura Goth, Karachi)
Electrification of Air Conditioning & Ventilation Systems
Worth of Electrification : 12 Million
Consultant : Y.H. Associates.
Nature of job : Supply & Installation of Power Panel / MCC
Power wiring of 23 AHU’s 2 Chillers 870 ton, Up
to 120 Hp. Pumps, 185 FCU’s MCCs 29 No. Ex.
Fans, etc.
Distribution Elect. Load : 750 K Watt
Ø M/S. INDUS MOTOR COMPANY (PVT.) LIMITED
Electrification of Compressed Air & Fire Fighting Systems
Worth of Electrification : 8 Lac
Consultant : Y.H. Associates.
Nature of job : Supply & Installation of / MCCs
power wiring of compressors.
12. Ø M/S. UBL (Latifabad Hyderabad Branch)
Electrification & Air Conditioning Systems (Including Designing)
C/O. Ziauddin Ahmed & Company.
Worth of Electrification : 1.5 Million
Nature of job : Turnkey basis Job
Ø M/S. UBL (Karachi Stock Exchange Branch)
Electrification & Air Conditioning Systems (Including Designing)
C/O. Ziauddin Ahmed & Company.
Worth of Electrification : 1.9 Million
Nature of job : Turnkey basis Job
Ø M/S. UBL (Port Qasim Branch)
Electrification of Air Conditioning Systems (Including Designing)
C/O. Ziauddin Ahmed & Company.
Worth of Electrification : 1.2 Million
Nature of job : Turnkey basis Job
Ø M/S. ZIAUDDIN AHMED & COMPANY (Head Office)
Electrification & Air Conditioning Systems (Including Designing)
C/O. Ziauddin Ahmed & Company.
Worth of Electrification : 2.1 Million
Nature of job : Turnkey basis Job
Ø M/S. CREEK MARINA LTD. (DHA City Karachi)
Electrification of Security Lighting
Worth of Electrification : 4.4 Million
Consultant : Clint Job.
Nature of job : Supply & installation of Power cabling,
pole & high bay Lights with cabling.
13. Ø M/S. ZIAUDDIN HOSPITAL (Clifton Karachi)
Electrification of HVAC Systems
Worth of Electrification : 14 Lac
Consultant : Y.H. Associates.
Nature of job : Supply & Installation of Power Panel / MCC
Power wiring of 4 AHU’s 1 Chillers 300 ton, up to
60 Hp Pumps, 185 FCU’s, Ex. Fans, etc.
Ø M/S. GLAXO SMITH KLINE OF PAKISTAN LTD.
Electrification & Automation of Steam recycling Works
Worth of Electrification : 1 Lac
Consultant : Clint Job
Major Job : Supply & Installation of Auto ON/OFF
Steam transfer pump panel & control system
Ø M/S. NABI QASIM INDUSTRIES (PVT.) LTD.
Electrification of HVAC System
Worth of Electrification : 5.5 Lac
Consultant : Y.H. Associates
Nature of job : Supply &Installation of MCC
Power wiring of Dehumidifier,
Dust collector, AHU & Ex. Fan etc.
Ø M/S. AKHAI PHARMA – HUB
Electrification of Air conditioning & Ventilation Systems (Inclusive Electrical Design)
Worth of Electrification : 2.5 Lac
Nature of job : Supply & Installation of MCC
Power wiring of Dehumidifier,
self contain units & exhaust fan etc.
Ø M/S. MAPLE PHARMA (PVT.) LTD.
Electrification of Air conditioning & Mechanical Systems.
Worth of Electrification : 21.75 Lac
Consultant : Y.H. Associates.
Nature of job : Supply & Installation of Power Panel / MCC
Power wiring of Chiller, Pump,
AHU & Ex. fan, control wiring etc.
14. Ø M/S. SHAN FOOD (PVT.) LTD
Electrification of HVAC System
Worth of Electrification : 5.2 Million
Consultant : Maam Associates
Nature of job : Supply & installation of power panel / MCC
power wiring of 1 chiller, 13 AHU’s. fresh air
units, ex. fans compressors, 1 hot water generator,
vacuum unit, de-humidifier, and control wiring of
entire system.
Ø M/S. SUNFARINA
Interconnection between
150 kW 400V 3Phase 50 Hz. Wind Turbine
& KESC in 2007, 1st Wind turbine which is
synchronized in Pakistan with National Grid,
KESC system for power generation (IPP)
Worth of Project: 1.4 Million
Nature of job: Turnkey basis Job, including
design, proposal of
interconnection of Wind Mill,
coordination with KESC,
laying of main feeder armor
cable from KESC
interconnection point to
Wind Mill supply meter,
test run & synchronizing with
KESC grid.
15. Ø M/S. OUTSUKA PHARMACEUTICAL (PVT) LTD. HUB
Electrification of Air Conditioning & Ventilation Systems.
Worth of Electrification : 19 Lac
Consultant : Y.H. Associates
Nature of job : Supply & Installation of Power Panel / MCC
Power wiring of 5 AHU’s, 1 Absorption Chiller,
Cooling Tower, Pumps & control wiring.
Ø M/S. HANIFA SULEMAN DAWOOD ONCOLOGY CENTER-PHASE-II
Electrification of Air Conditioning and Ventilation System in Phase I & II.
Worth of Electrification : 1.1 Million
Consultant : Y.H. Associates.
Nature of job : Supply & Installation of Power Panels /
MCC Power wiring of 15 AHU’s 25 FCU’s 200
tons chiller & control.
Ø M/S. FAISAL BANK (Head Office Shahra-e-Faisal)
Electrification of HVAC Systems
Worth of Electrification : 3.5 Million
Consultant : Y.H. Associates
Nature of job : Supply & Installation of Power Panels /
MCC Power wiring of 2 Chillers 22 AHU’s, 1 hot
water generator, DX Split System, & control.
Ø M/S. EFROZE CHEMICAL INDUSTRIES (PVT.) LTD.
Electrification of 4 Stories Ware House
Worth of Project : 3.3 Million
Consultant : Trunkey bases Job
16. Ø M/S. MERCK MARKER (PVT.) LTD. QUETTA
Electrification & BMS Networking of HVAC Systems of Solid Form
Worth of Electrification : 4.5 Million
Consultant : Maam Associates
Nature of job : Supply & Installation of Power Panels /
MCCs Power wiring of 2 Nos. Chiller, 7 AHU
Units, Pumps, Control wiring, & BMS wiring, etc.
17. LIST OF ELECTRICAL & AUTOMATION STAFF
Name Designation Age
(Year)
Qualification Experience
Abid Ali CEO 43 B. Tech (Hons.) Elect. 18 years
Fakhruddin Electrical
Manager
56 DAE Electrical 27 years
Khaliq Sharif Project / Business
Coordinator
48 B. Tech (Hons)
Electronics
21 years
Ansar Ahmed Automation
Engineer
43 M.Sc. DAE Electrical 10 Years
Jawad Ahmed Khan Site Engineer 40 B. Tech (Hons.) Elect. 12 years
Taufique Hashmi Site Supervisor 50 B.Sc. 21 Years
Muhammad Aslam Foreman 40 H.Sc. 15 years
Muhammad Zahid Electrician 30 H.Sc. 11 years
Muhammad Naveed Electrical 35 Matric 15 years
Muhammad Imran Electrician 32 Matric 11 years
Muhammad Asghar Electrician 35 Matric 10 years
Sajjad Ahmed Asst. Electrical 22 Matric 5 years
Non Skilled Helpers 18-40 10 Nos. Approx 1-20 years
Non Skilled Stone cutter +
labor
18-55 7 Nos. Approx 1-35 years
18. LIST OF MECHANICAL STAFF
Name Designation Age (Y) Qualification Experience (Y)
Ateeq ur
Rehman
Project manager 44 B.E. Mech. B.com 15
Mehmood
Imtiaz
Project Engineer 49 Mechanical Engg. 19
Muhammad
Abbas
Project Coordinator 48 B. Sc, Auto Engg.
Course
20
Muhammad
Khalid
A.C. Supervisor 38 DAE HVAC 12
Muhammad
Shujah
A.C. Foreman 39 Technical Course 12
Zaheer Ahmed A.C. Technician 36 Matric 9
A.Wahab Welder 33 Matric 7
Salman Khan Welder 32 Matric 6
Saleem Khan Fabricator 37 Matric 6
Salman Bukhari Office Asst. &
Auto CAD Oprt.
25 HSc, Comp. Course 4
19. PLANT & EQUIPMENTS
Ø Earth Tester
Ø Insulation Testers
Ø Clamp Meter
Ø AVo meters
Ø lane testers
Ø Hydraulic Lugs punch Machine
Ø Mechanical Lugs Punch Machines
Ø Welding Machines
Ø Pipe threading machines Electrical / manual
Ø Hilti Drill / Cutting Machines
Ø Drill Machines
Ø Disc Cutting / Grinding Machines
Ø Spanners Set & Box Spanner Set
Ø Electrical Tool Kit sets. Inclusive of Rang Spanner, Players, Screw drivers Flat /
Philips type (diff. size), hammer, chisel, hack Saw, Cable knife, Cable Cutter (diff.
size) Drill bit (diff. size), Hole saw, etc.
Ø Cable Drum Stand
Ø Stand by Generators
Ø Scare Folding up to 30 feet.
20. PRE-QUALIFIED WITH CONSULTANS
Ø M/S WALI JAN ASSOCIATES - PLANNING ENGINEERS
Ø M/S. AYUB ASSOCIATES - CONSULTANT & PLANNER
Ø M/S EA CONSULTING (PVT.) LTD. CONSULTANT & ENGNEERS
Ø M/S. MAAM ASSOCIATES - CONSULTANT
Ø M/S. Y.H. ASSOCIATE - CONSULTANT
PRE-QUALIFIED WITH CLIENTS
Ø SSGC
Ø SUPARCO
Ø DHA KARACHI
Ø PRIME ENGINEERING METHODS
Ø NABI QASIM INDUSTRIES PVT. LTD.
Ø EFROZE CHEMICALS PVT. LTD.
Ø MEMON MEDICAL INSTITUTE
Ø MEHRUNNISA HOSPITAL
Ø ZIAUDDIN AHMED & COMPANY
Ø HABIB RAFIQ PVT LIMITED
Ø CREEK MARINA PVT LIMITED