際際滷

際際滷Share a Scribd company logo
Page 1 of 4
Usman Ghani
Email: usman.8257@gmail.com
Mobile: +60182573615
WhatsApp No: +923217065308
Skype ID: usmanghani8257
CAREER SUMMARY
RF Drive Test , Coordinator and Optimization experience (4+ years) on 2G/3G network with HUAWEI vendor.
Specialties: RF TOOLS & EXPERTISE:
 Microsoft Office 2007/2010/13 Word, PowerPoint, Excel
 OMSTAR/Naster
 Map info
 ACTIX
 Nemo Outdoor
 Nemo Analyzer
 Spectrum Analyzer
 PRS Clint/M2000/LMT/U2000/UPRS
 Google Earth
 RF Optimization Tool/ Drive Testing Tool, like
 TEMS 8.0.3, TEMS 14.6.4 and TEMS 15.1 of ASCOM
PROJECTSSUMMARY
 Huawei 3G/LTE CelCome Swap Project Malaysia (Jun-2016-Current
 Huawei 2G/3G MOBILINK Rolloutand CC Project North(Nov-2014 Jun-2016).
 Huawei 3G Moblink Rollout and Complaint Project(Agust2014-Nov-2014)
 Huawei CM-Pak Benchmark Project(Jun 2014 to August 2014)
 2G HUAWEI WARID Rollout Project Center/North/South ( April 2014 to June 2014)
 HUAWEI Warid Cluster Drive BTS/BSC Upgrade Project Center/South(March-2014 to Aprail-2014)
 HUAWEIWarid Rehoming Project Center/South(March 2014 to April 2014)
 HUAWEI Ufone Rollout And Complaint project(August 2013 to March 2014)
 ZTE Telenor Swap Project Center(Agust-2012- March-2013)
 HUAWEIUfone Swap Project Center(Feb-2012-Agust-2012)
WORK EXPERIENCE
RF Planning Optimization Engineer - UCE-Huawei Telecom Malaysia
Huawei-3G/LTE CellCom Hammer Swap Project (Jun-2016- Current)
 Working as a LTE RF Engineer on Celcom Swap Project (Nokia to Huawei).
 Analyze Cluster Pre Post Report and make Plane to improve them.
 Complete Analysis done by Nemo Analyzer
 Meeting with customer for Cluster approval Report
 Run pre post Prediction on Unet for cluster justification.
 Improve coverage by Physical audit and also as well soft parameter.
 Monitor PRE Post KPI during Swap and share benchmark after swap done and highlight issue.
 Monitoring major LTE KPIs of assigned sites ( Data CSSR , CDR, RRC setup success rate, CSFB, eRAB success
rate, DL/UL throughput, LTE HO success rate)
 Analyze end to end customer complain by using Naster Tool and proposed recommendation to solve CC.
 Analyze DT Logs and check parameter setting by L3 massages.
 Remove Overlapping by physical setting and also PDSCH power setting.
Page 2 of 4
RF Planning Optimization Engineer. LCC Huawei Telecom Pakistan
Huawei-2G/3G MOBILINK Rollout& Customer Complaint Project (Feb-2015-Jun-2016)
 Working as a 3G /2G RF Planning & Optimization Engineer on Mobilink MegaProject.
 Working on 3G Trial (SRB,RB Parking, HSUPA, CPC) and monitor hourly and day average trend after
implementation and share benchmark
 Analyze end to end customer complain by using Naster Tool and proposed recommendation to solve CC.
 Pre-Planning of 3G & 2G Sites for Operators.
 Daily Check Complain and do need full action to close that.
 Complain Analysis done by Naster Tool and find reason to drop call HO failure IRAT failure.
 Ability to improve KPIs (RRC setup Success Rate, RAB setup Success Rate, CSSR, CS IRAT, PS IRAT, throughput
issues in HSDPA, SHO, DCR) Audit of IRAT parameters, LAC planning, RNC,
 Implement the FACH Stat. and Check Performance
 Troubleshooting and optimizing worst cells
 Analyzing daily KPIs and reporting hardware issues And Share Bench Marks
 Analysis Missing Neighbor Detection
 Before Move Team Check Major KPi of 2G And PB,BER (UL,DL), RAB Success Rate, RRC Connection Success Rate
 After DT Analysis Logs and Analysis KPi Path Balance Congestion DCR and give Recommendation etc.
 Also Check Neighbor HO Relations And Shift Traffics
 Post analysis of hardware problems (faulty TRX, VSWR etc.) causing KPIs degradations in network by analyzing
TRX level statistics and alarms information
 Frequency Planning and Neighbor Planning of the New Rollout sites.
 Optimization of worst cells (Based upon Drop Call Rate, Call Setup Success Rate, Handover Success Rate, Traffic
etc) in the Network through Frequency
 Minimize the internal interference by Re planning the Frequency and also implement the soft frequency according
to requirement.
 Also make Needful Action to Improve Data Throughput in 2G
 Meet Customer for sites Approvals.
 Also Implement WO on U200/M200
 Making cluster Level group on PRs
 Also check Latency Test Using U2000/M2000
 Collect Operation Logs, PCH/CHR Performance data etc by LMT.
 Made Script and and Implement NBR Plan and WO.
 Detect Missing NBR and Implement to Improve Network Performance
 Set parameter on RNC level for catering the Congestion.
3G/2G DT Post Processing Engineer UCE Telecommunication.
Huawei 2G/3G MOBILINK Rollout Project (North,Center) (2nd Nov 2014-Feb-2015)
Leading a team of drive test Engineers in Central and North region of Pakistan for Moblink 175 Rollout Project 2G/3G
Rollout Project,
Check 2G/3G Customer Complain And Move Team According To Complain.
 Before Move Team Check Major KPi And Check PB,BER (UL,DL)
 After DT Analysis Logs And Analysis KPi Path Balance Congestion DCR etc.
 Make Mobilink 2G/3G Report And Log file analyses.
 Also Check Neighbor HO Relations And Shift Traffics
 Make 2G/3G Neighbors Plan
 Modulation Planning
 Post analysis of hardware problems (faulty TRX, VSWR etc.) causing KPIs degradations in network by analyzing
TRX level statistics and alarms information
 Frequency Planning and Neighbor Planning of the New Rollout sites.
 Optimization of worst cells (Based upon Drop Call Rate, Call Setup Success Rate, Handover Success Rate, Traffic
etc) in the Network through Frequency
3G Drive Test Engineer UCE Telecommunication.
Huawei 3G Moblink Rollout/Complaint Project (14th
Jun 2014 to Nov- 2014)
 Conducted 3G Drive Tests measurements for coverage and quality of service for WCDMA HSUPA/HSDPA.
 Conducting BenchMark Cluster Drive Test Using TEMS/Nemo OutDoor
 Conducting Drive Test Single Site verification on both single carrier sites in TEMS 15.2.
 Conducted drive test verification to check coverage extent, call quality, Sector and Inter-RAT system handover
performance of newly integrated sites.
 Resolved Issues of SIR and Pilot Pollution.
 Find Jammers Within Area By Spectrum Analyzer
 Customer complaint resolution. Visited customer place and solve their problems regarding Pilot Pollution
HSDPA/HSUPA throughput.
 SSV test (voice and video call, data test).
 Coverage test in dedicated mode.
 Sector Swap check.
 Walk test to check RSCP and EC/IO indoor.
 Indoor and outdoor CS and PS testing for corporate customer.
Page 3 of 4
 Soft and I-rat handover verification test.
 2G to 3G and 3G to 2G reselection test.
 Testing for R99,.
 Ps reselection and handover test. Soft/Softer
 Troubleshoot dropped calls, low RSCP and EC/IO issues to ensure good speech quality.
 Reading L2 and L3 messages.
 Identify missing and one-way defining Neighbor
 To perform Cluster Drive
 Perform Freeway drive test and according to customer Demand
2G Drive Test EngineerUCE Telecommunication.
HUAWEI-Warid Rollout/BTS,BSC Upgrade/Rehoming Project Center/South (3-Aprilth
2014 to
13-Jun-2014)
 Quality Testing (RXQual, C/I and SQI).
 Perform BTS And BSC Level Testing
 Making 2G Report Rollout BTS, BSC Level.
 Cluster Drive, In Idle, Dedicated, and packet mode.
 Coverage tests, Fixed Point throughput tests, mobile throughput tests etc.
 Analysis of DT files using TEMS tool, and forwarding recommendations.
 Making DT & Cluster Reports using, Google Earth and MapInfo 8.5 tools.
 Identification for bad coverage, throughput, sector swapping, overshooting, Tx power, handover issues etc.
 Preparing Drive Test Reports Using TEMS 8.0.4 & MapInfo 8.5/11.0
 Reports regarding Drive Test and mutual discussion on site issues with Warid Engineers
 Carrying out drives Test for Huawei Warid PCU Upgrade Project
 Cluster Rehoming Drive
2G Drive Test Engineer UCE Telecommunication.
HUAWEI-Ufone Rollout/NPM project Center (March 2013 to April 2013)
 Performed cluster drive in and examine performance of network, coverage and quality issues, interferences, co -
BCCH and call blocking issues and handover problems. Prepare report on problems of each cluster.
 Performed re-homing activities.
 Identifying different network problems like drop call, block call, missing neighbor, co-BCCH, Adjacent BCCH,
 identified interference sources
 Performed Indoor surveys & re-homing activities.
 Performed Neighbor Audits, removing frequency clashes (Co-BCCH, MAIO, and Fixed Frequency TRXs).
 Customer complaint resolution. Visited customer place and solve their problems
 Drive testing using TEMS 8.3/TEMS 8.0.4
 Verification of planning data during the drive test e.g. Neighbour relations, Handover parameters, MA list, HSN,
BCCH verification, MAIO, LAC etc.
 Analysis of drive test log files and troubleshooting of the problems related to coverage, call drops, quality etc.
 Initial tuning (Drive testing) of new on-air sites (e.g. checking sector swapping, coverage, call origination /
termination, C/I etc.)
 TRx Testing, Inter-Site and Intra-Site Handover Testing, Site Coverage Test, GPRS/Edge Testing etc
 Making 2g Rollout Report
 Identifying and escalating hardware issues Swap Sector/Partial/Transmit/Receive.
 Customer complaints and resolve.
 Perform NEMO Drive Test
 Perform MOS DT For SQI Checking
 OMO DT Idle And Dedicated also benchmarking, FOR PS and CS, Also Perform Scanning MOD DT..
 Analysis of DT files using TEMS tool.
 Conducting Drive test of new integrated sites/ Customer complaints to resolve bad quality, poor coverage, over
shooting cells and failure events issues etc.
 Analyze Drive test results and make fine tuning by changing antenna tilt, azimuth and frequency to meet the
coverage and quality requirements.
 Checking of DT reports.
 CGI Definition.
 Resolve Handover issues..
 and remove the overshooting.
Bench marking activities for ISB city and prepared bench marking reports.
 Remove Swap Full Swap/Partial Swaps
 Perform Issue Based Drive Test
Page 4 of 4
Transmission Implementation EngineerEDB(Engineering Design Beure)
ZTE Telenor VEGATSSProject (27th
Agust 2012 to March 2013)
 Supervision and Monitoring of all Installation, commissioning & Troubleshooting of ZTE SDR 8700 and 8900, BBU,
RSU and RRUs
 3G Transmission Network Designing.
 Technical Site Survey.
 LOS (MW Transmission) Survey.
 Daily Progress Reporting of survey teams.
 RAN Report Assessment and Verification of DEDs (Detailed Engineering Design).
 Mention Proposed Dishes Quantity Of RRU Length Of Feeders And Fiber Cables.
 Documentation and Coordination with survey teams.
 Path profile generation and verification for the PTP MW links using Pathloss4.
 Proposing the optimum height of antenna keeping in view the height of obstacles and Clearance criteria.
 Repeater Planning for LOS not feasible Links.
 Generation and submission of LOS Survey reports.
 RRU survey reporting.
 Hand On Swap The SDR W301 Rectifier
 Panning The MW And Commission The MW Dishes
 SDR commissioning on LMT and BLMT software tool
 Troubleshooting and integrate of BTS External alarm.
 Preparing the Swap Test Report, Final Clearance Reports
OMCR Engineer Intrnee NETKOM Technologies Pvt Ltd.
HUAWEI-Ufone Swap Project (3-Feb 2012 to 7th August 2012)
Main job responsibilities included As: (OMCR Engineer)
 Create Neighbor Plan
 OMCR Responsibilities
 Check Site Alarms And Coordinate concern Team
 Implement new site plans
 Implement WO
 Synchronize Planed CME and Active CME
 Changing Frequency MAIO, MA List,
 Coordinate with DT Engineer to Performed DT .
 Increase Time Slots GPRS And EDGE
 Taking Site State Using PRS, And M200
 Taking Export Using M2000
 Support DT Engineer In Rollout Site
 TRX Lock Unlock
 Make KPI Report Also
 Make Template Using Specific Counters
EDUCATION
 MSPA(MS Project Management) Continued
(2014-2015)
 Bachelor of Telecommunication Engineering
Major in Telecom (2007-2011)
Superior University Lahore
 Higher Secondary School Certificate (H.S.S.C)
Pre-Engineering (2005-2007)
1st Division.
Army College ChunianCantt.
 Secondary School Certificate (S.S.C)
Science Group
GOVT High School Chunian.
LANGUAGES
 English - Reading good, Speaking fair
 Urdu - Fluent
Reference
Would be furnished upon request

More Related Content

Usman Ghani Resume LTE

  • 1. Page 1 of 4 Usman Ghani Email: usman.8257@gmail.com Mobile: +60182573615 WhatsApp No: +923217065308 Skype ID: usmanghani8257 CAREER SUMMARY RF Drive Test , Coordinator and Optimization experience (4+ years) on 2G/3G network with HUAWEI vendor. Specialties: RF TOOLS & EXPERTISE: Microsoft Office 2007/2010/13 Word, PowerPoint, Excel OMSTAR/Naster Map info ACTIX Nemo Outdoor Nemo Analyzer Spectrum Analyzer PRS Clint/M2000/LMT/U2000/UPRS Google Earth RF Optimization Tool/ Drive Testing Tool, like TEMS 8.0.3, TEMS 14.6.4 and TEMS 15.1 of ASCOM PROJECTSSUMMARY Huawei 3G/LTE CelCome Swap Project Malaysia (Jun-2016-Current Huawei 2G/3G MOBILINK Rolloutand CC Project North(Nov-2014 Jun-2016). Huawei 3G Moblink Rollout and Complaint Project(Agust2014-Nov-2014) Huawei CM-Pak Benchmark Project(Jun 2014 to August 2014) 2G HUAWEI WARID Rollout Project Center/North/South ( April 2014 to June 2014) HUAWEI Warid Cluster Drive BTS/BSC Upgrade Project Center/South(March-2014 to Aprail-2014) HUAWEIWarid Rehoming Project Center/South(March 2014 to April 2014) HUAWEI Ufone Rollout And Complaint project(August 2013 to March 2014) ZTE Telenor Swap Project Center(Agust-2012- March-2013) HUAWEIUfone Swap Project Center(Feb-2012-Agust-2012) WORK EXPERIENCE RF Planning Optimization Engineer - UCE-Huawei Telecom Malaysia Huawei-3G/LTE CellCom Hammer Swap Project (Jun-2016- Current) Working as a LTE RF Engineer on Celcom Swap Project (Nokia to Huawei). Analyze Cluster Pre Post Report and make Plane to improve them. Complete Analysis done by Nemo Analyzer Meeting with customer for Cluster approval Report Run pre post Prediction on Unet for cluster justification. Improve coverage by Physical audit and also as well soft parameter. Monitor PRE Post KPI during Swap and share benchmark after swap done and highlight issue. Monitoring major LTE KPIs of assigned sites ( Data CSSR , CDR, RRC setup success rate, CSFB, eRAB success rate, DL/UL throughput, LTE HO success rate) Analyze end to end customer complain by using Naster Tool and proposed recommendation to solve CC. Analyze DT Logs and check parameter setting by L3 massages. Remove Overlapping by physical setting and also PDSCH power setting.
  • 2. Page 2 of 4 RF Planning Optimization Engineer. LCC Huawei Telecom Pakistan Huawei-2G/3G MOBILINK Rollout& Customer Complaint Project (Feb-2015-Jun-2016) Working as a 3G /2G RF Planning & Optimization Engineer on Mobilink MegaProject. Working on 3G Trial (SRB,RB Parking, HSUPA, CPC) and monitor hourly and day average trend after implementation and share benchmark Analyze end to end customer complain by using Naster Tool and proposed recommendation to solve CC. Pre-Planning of 3G & 2G Sites for Operators. Daily Check Complain and do need full action to close that. Complain Analysis done by Naster Tool and find reason to drop call HO failure IRAT failure. Ability to improve KPIs (RRC setup Success Rate, RAB setup Success Rate, CSSR, CS IRAT, PS IRAT, throughput issues in HSDPA, SHO, DCR) Audit of IRAT parameters, LAC planning, RNC, Implement the FACH Stat. and Check Performance Troubleshooting and optimizing worst cells Analyzing daily KPIs and reporting hardware issues And Share Bench Marks Analysis Missing Neighbor Detection Before Move Team Check Major KPi of 2G And PB,BER (UL,DL), RAB Success Rate, RRC Connection Success Rate After DT Analysis Logs and Analysis KPi Path Balance Congestion DCR and give Recommendation etc. Also Check Neighbor HO Relations And Shift Traffics Post analysis of hardware problems (faulty TRX, VSWR etc.) causing KPIs degradations in network by analyzing TRX level statistics and alarms information Frequency Planning and Neighbor Planning of the New Rollout sites. Optimization of worst cells (Based upon Drop Call Rate, Call Setup Success Rate, Handover Success Rate, Traffic etc) in the Network through Frequency Minimize the internal interference by Re planning the Frequency and also implement the soft frequency according to requirement. Also make Needful Action to Improve Data Throughput in 2G Meet Customer for sites Approvals. Also Implement WO on U200/M200 Making cluster Level group on PRs Also check Latency Test Using U2000/M2000 Collect Operation Logs, PCH/CHR Performance data etc by LMT. Made Script and and Implement NBR Plan and WO. Detect Missing NBR and Implement to Improve Network Performance Set parameter on RNC level for catering the Congestion. 3G/2G DT Post Processing Engineer UCE Telecommunication. Huawei 2G/3G MOBILINK Rollout Project (North,Center) (2nd Nov 2014-Feb-2015) Leading a team of drive test Engineers in Central and North region of Pakistan for Moblink 175 Rollout Project 2G/3G Rollout Project, Check 2G/3G Customer Complain And Move Team According To Complain. Before Move Team Check Major KPi And Check PB,BER (UL,DL) After DT Analysis Logs And Analysis KPi Path Balance Congestion DCR etc. Make Mobilink 2G/3G Report And Log file analyses. Also Check Neighbor HO Relations And Shift Traffics Make 2G/3G Neighbors Plan Modulation Planning Post analysis of hardware problems (faulty TRX, VSWR etc.) causing KPIs degradations in network by analyzing TRX level statistics and alarms information Frequency Planning and Neighbor Planning of the New Rollout sites. Optimization of worst cells (Based upon Drop Call Rate, Call Setup Success Rate, Handover Success Rate, Traffic etc) in the Network through Frequency 3G Drive Test Engineer UCE Telecommunication. Huawei 3G Moblink Rollout/Complaint Project (14th Jun 2014 to Nov- 2014) Conducted 3G Drive Tests measurements for coverage and quality of service for WCDMA HSUPA/HSDPA. Conducting BenchMark Cluster Drive Test Using TEMS/Nemo OutDoor Conducting Drive Test Single Site verification on both single carrier sites in TEMS 15.2. Conducted drive test verification to check coverage extent, call quality, Sector and Inter-RAT system handover performance of newly integrated sites. Resolved Issues of SIR and Pilot Pollution. Find Jammers Within Area By Spectrum Analyzer Customer complaint resolution. Visited customer place and solve their problems regarding Pilot Pollution HSDPA/HSUPA throughput. SSV test (voice and video call, data test). Coverage test in dedicated mode. Sector Swap check. Walk test to check RSCP and EC/IO indoor. Indoor and outdoor CS and PS testing for corporate customer.
  • 3. Page 3 of 4 Soft and I-rat handover verification test. 2G to 3G and 3G to 2G reselection test. Testing for R99,. Ps reselection and handover test. Soft/Softer Troubleshoot dropped calls, low RSCP and EC/IO issues to ensure good speech quality. Reading L2 and L3 messages. Identify missing and one-way defining Neighbor To perform Cluster Drive Perform Freeway drive test and according to customer Demand 2G Drive Test EngineerUCE Telecommunication. HUAWEI-Warid Rollout/BTS,BSC Upgrade/Rehoming Project Center/South (3-Aprilth 2014 to 13-Jun-2014) Quality Testing (RXQual, C/I and SQI). Perform BTS And BSC Level Testing Making 2G Report Rollout BTS, BSC Level. Cluster Drive, In Idle, Dedicated, and packet mode. Coverage tests, Fixed Point throughput tests, mobile throughput tests etc. Analysis of DT files using TEMS tool, and forwarding recommendations. Making DT & Cluster Reports using, Google Earth and MapInfo 8.5 tools. Identification for bad coverage, throughput, sector swapping, overshooting, Tx power, handover issues etc. Preparing Drive Test Reports Using TEMS 8.0.4 & MapInfo 8.5/11.0 Reports regarding Drive Test and mutual discussion on site issues with Warid Engineers Carrying out drives Test for Huawei Warid PCU Upgrade Project Cluster Rehoming Drive 2G Drive Test Engineer UCE Telecommunication. HUAWEI-Ufone Rollout/NPM project Center (March 2013 to April 2013) Performed cluster drive in and examine performance of network, coverage and quality issues, interferences, co - BCCH and call blocking issues and handover problems. Prepare report on problems of each cluster. Performed re-homing activities. Identifying different network problems like drop call, block call, missing neighbor, co-BCCH, Adjacent BCCH, identified interference sources Performed Indoor surveys & re-homing activities. Performed Neighbor Audits, removing frequency clashes (Co-BCCH, MAIO, and Fixed Frequency TRXs). Customer complaint resolution. Visited customer place and solve their problems Drive testing using TEMS 8.3/TEMS 8.0.4 Verification of planning data during the drive test e.g. Neighbour relations, Handover parameters, MA list, HSN, BCCH verification, MAIO, LAC etc. Analysis of drive test log files and troubleshooting of the problems related to coverage, call drops, quality etc. Initial tuning (Drive testing) of new on-air sites (e.g. checking sector swapping, coverage, call origination / termination, C/I etc.) TRx Testing, Inter-Site and Intra-Site Handover Testing, Site Coverage Test, GPRS/Edge Testing etc Making 2g Rollout Report Identifying and escalating hardware issues Swap Sector/Partial/Transmit/Receive. Customer complaints and resolve. Perform NEMO Drive Test Perform MOS DT For SQI Checking OMO DT Idle And Dedicated also benchmarking, FOR PS and CS, Also Perform Scanning MOD DT.. Analysis of DT files using TEMS tool. Conducting Drive test of new integrated sites/ Customer complaints to resolve bad quality, poor coverage, over shooting cells and failure events issues etc. Analyze Drive test results and make fine tuning by changing antenna tilt, azimuth and frequency to meet the coverage and quality requirements. Checking of DT reports. CGI Definition. Resolve Handover issues.. and remove the overshooting. Bench marking activities for ISB city and prepared bench marking reports. Remove Swap Full Swap/Partial Swaps Perform Issue Based Drive Test
  • 4. Page 4 of 4 Transmission Implementation EngineerEDB(Engineering Design Beure) ZTE Telenor VEGATSSProject (27th Agust 2012 to March 2013) Supervision and Monitoring of all Installation, commissioning & Troubleshooting of ZTE SDR 8700 and 8900, BBU, RSU and RRUs 3G Transmission Network Designing. Technical Site Survey. LOS (MW Transmission) Survey. Daily Progress Reporting of survey teams. RAN Report Assessment and Verification of DEDs (Detailed Engineering Design). Mention Proposed Dishes Quantity Of RRU Length Of Feeders And Fiber Cables. Documentation and Coordination with survey teams. Path profile generation and verification for the PTP MW links using Pathloss4. Proposing the optimum height of antenna keeping in view the height of obstacles and Clearance criteria. Repeater Planning for LOS not feasible Links. Generation and submission of LOS Survey reports. RRU survey reporting. Hand On Swap The SDR W301 Rectifier Panning The MW And Commission The MW Dishes SDR commissioning on LMT and BLMT software tool Troubleshooting and integrate of BTS External alarm. Preparing the Swap Test Report, Final Clearance Reports OMCR Engineer Intrnee NETKOM Technologies Pvt Ltd. HUAWEI-Ufone Swap Project (3-Feb 2012 to 7th August 2012) Main job responsibilities included As: (OMCR Engineer) Create Neighbor Plan OMCR Responsibilities Check Site Alarms And Coordinate concern Team Implement new site plans Implement WO Synchronize Planed CME and Active CME Changing Frequency MAIO, MA List, Coordinate with DT Engineer to Performed DT . Increase Time Slots GPRS And EDGE Taking Site State Using PRS, And M200 Taking Export Using M2000 Support DT Engineer In Rollout Site TRX Lock Unlock Make KPI Report Also Make Template Using Specific Counters EDUCATION MSPA(MS Project Management) Continued (2014-2015) Bachelor of Telecommunication Engineering Major in Telecom (2007-2011) Superior University Lahore Higher Secondary School Certificate (H.S.S.C) Pre-Engineering (2005-2007) 1st Division. Army College ChunianCantt. Secondary School Certificate (S.S.C) Science Group GOVT High School Chunian. LANGUAGES English - Reading good, Speaking fair Urdu - Fluent Reference Would be furnished upon request