VECTOR PRAXIS: MODEL DRIVEN DIGITAL FABRICATION
EVERY PART IN EXACTLY THE RIGHT PLACE
A MODEL DRIVEN APPROACH TO OFF-SITE,
HIGH- TOLERANCE, ULTRA-CUSTOM FABRICATION
THE PROJECT:
-AAA FEATURE STAIR
- SEAGRAM BUILDING, 375 PARK AVENUE, NY
-STAIR CONNECTS THE 23RD AND 24TH FLOOR
-PROJECT ARCHITECT: GENSLER
-GENERAL CONTRACTOR: TRISTAR CONSTRUCTION
-CONTRACT: DESIGN, DETAIL, BUILD SERVICES
-MATERIALS: STEEL, CORIAN, GLASS, STAINLESS STEEL
CHALLENGES/OPPORTUNITIES
FEATURE STAIR
-COMPLEX GEOMETRY (ELLIPTICAL STAIR)
-NYC SITE (LISTED BUILDING)
-TIGHT FABRICATION TIMELINE
-TIGHT COORDINATION REQUIRED FOR
ON-SITE WORK
-DESIRE TO MINIMIZE TENANT DISRUPTION
-UNDERSIZED FREIGHT ELEVATOR
-CORIAN CLADDING REQUIRES HIGH
TOLERANCE STEEL STRUCTURE (+/- 1/8)
-ABSOLUTE NOVELTY OF PROCESS
CONCEPT
MODEL
DRAWINGS
JIGS
PART
ASSEMBLY
LOGISTICS
INSTALLATION
SIMULTANEOUS VERSUS SEQUENTIAL FABRICATION
PHASE 1
CONCEPT AND DESIGN DEVELOPMENT
SKETCHES QUICKLY LEAD TO A WORKING MODEL THAT GROWS
MORE ROBUST AS DESIGN DECISIONS ARE MADE
THE SITE IS CAREFULLY ANALYZED
CONCRETE CHIPPED AWAY FROM STEEL
GIRDERS, SITE MEASUREMENTS TAKEN
A PARAMETRIC MODEL IS PRODUCED THAT REPRESENTS A BUILDABLE
REALITY. THE MODEL BECOMES THE CARRIER OF ALL INPUT
WITH RENDERINGS THAT REFLECT ACTUAL
CONSTRUCTABILITY
ACCURATE ARCHITECT INPUT CAPTURE LEADS TO
FASTER RESOLUTIONS AND SPEEDIER APPROVALS
OUR SOLIDWORKS MODELS CAN BE RAPIDLY UPDATED AND VARIOUS
CONFIGURATIONS TESTED WITH FULL PARAMETRIC CONTROL
Ie. MAKE CHANGES TO THE THICKNESS OF A GIVEN MATERIAL AND THE MODEL WILL
RESPOND TO ALTER AFFECTED ASSEMBLIES AND COMPONENTS.
WE DESIGN MULTI-MATERIAL ASSEMBLIES FOR FASTER AND MORE
ACCURATE INSTALLATION- A PRECISE KIT OF PARTS
INTEGRATED POUR
STOP ASSEMBLY
-COMPLETE GLASS SHOE
-ALL STRUCTURE REQD TO
CONNECT TO BASE BUILDING
-INSTALLED TO EXACT CEILING
HEIGHT FOR APPROPRIATE
REVEALS AND OTHER ARCH
DETAILS
-THIS INTEGRATED POURSTOP
ASSEMBLY COMBINES THE
WORK OF 5 TRADES IN ONE
PRE-FABRICATED PART
-WHAT COULD TAKE WEEKS TO
INSTALL USING TYPICAL
METHODS, TAKES A COUPLE
DAYS TO INSTALL
MONTHS BECOME WEEKS, WEEKS
BECOME DAYS
LOGISTICAL CONSIDERATIONS ARE UNDERSTOOD THROUGH THE
MODEL AND FORM A SIGNIFICANT PART OF THE DESIGN PROCESS
PHASE 2
MASTER MODEL
THE MODEL CONTAINS:
CUT FILES
BILL OF MATERIALS
WEIGHT OF MATERIALS
LOGISTICS AND SHIPPING INFORMATION
COST CALCULATIONS
DESIGN DOCUMENTS
FABRICATION DRAWINGS FOR OUTSIDE TRADES
ASSEMBLY DRAWINGS
JIG AND FIXTURE SYSTEMS FOR FABRICATION
INFORMATION FOR COORDINATION WITH CLIENT
ETC.
THIS IS TRUE PARAMETRIC BIM.
MODEL
GEOMETRY
READILY
EXPORTED TO
ENGINEERING
SOFTWARE FOR
LOAD ANALYSIS
AND STRUCTURAL
REFINEMENT AS
REQUIRED
TEMPLATES ARE PRODUCED FROM MODEL GEOMETRY TO
AID CONTRACTOR WITH LAYOUT AND DEMOLITION
A SIMILAR TEMPLATE RECREATES THE SITE
CONDITION IN THE SHOP
EXTREMELY ACCURATE ASSEMBLIES ARE
PRODUCED FROM THIS TEMPLATE SYSTEM
A SERIES OF JIG SYSTEMS ARE PRODUCED WITHIN THE
MODEL FOR THE FABRICATION OF STEEL AND CORIAN
COMPONENTS
STEEL ASSEMBLY JIG CORIAN ASSEMBLY JIG
FROM MODEL TO SHOP FLOOR
JIG FOR STRUCTURAL STEEL AND
HANDRAIL
JIG FOR CORIAN BENDING
CUT FILES SENT OUT TO STEEL FABRICATOR FOR
PRECISE CUTTING AND ROLLING
PHASE 3
SIMULTANEOUS PRODUCTION OF ALLIED PARTS &
ASSEMBLIES IN SEPARATE LOCATIONS
STEEL STRINGERS ASSEMBLED IN JIG
STAIR SECTIONS ASSEMBLED
FROM DRAWINGS EXTRACTED FROM THE MASTER MODEL
MEANWHILE CORIAN PRODUCTION BEGINS AT
SOLID SURFACE FABRICATOR
OTHER COMPONENTS CONTINUE TO BE
PRODUCED AT VP SHOP
FABRICATION DRAWINGS FROM THE MODEL ENABLE HIGH
PRECISION FABRICATION AND PERFECT FIT
HANDRAIL BENDING AND FITTING TO JIG
IN-HOUSE TESTING OF
COMPONENTS AND ADHESIVES
HOIST POINTS ARE CALCULATED THROUGH THE
MODEL AND ELIMINATE GUESSWORK
SPLICE PLATES CONNECT STAIR SECTIONS
AND ELIMINATE ON-SITE WELDING
ALL DETAILED EXCLUSIVELY
THROUGH THE MODEL
AS CORIAN SECTIONS ARE COMPLETED THEY CAN BE TEST
FIT TO THE MASTER JIG WITH STEEL STRUCTURE ASSEMBLED
WHILE FABRICATION CONTINUES ON OUR END, BASE BUILDING
STEEL IS GOING IN, READY FOR OUR WORK WITHOUT DELAY
PHASE 4
SHIPPING COMPLETE ASSEMBLIES JUST-IN-TIME TO
SITE FOR IMMEDIATE ERECTION
STAIR ASSEMBLIES WITH CUSTOM CARTS DESIGNED TO
FIT WITHIN SITE ELEVATOR AID INSTALLATION
STEEL ERECTION
DETAILED INSTALLATION
DRAWINGS PRODUCED
FROM THE MODEL FOR USE
BY THE NYC ERECTOR
LOAD-IN OF STEEL
HOISTING STEEL SECTIONS INTO POSITION
THE STAIR SECTIONS ARE ERECTED ON-SITE IN
LESS THAN A WEEK
CORIAN INSTALLATION
THE CORIAN IS INSTALLED PERFECTLY, ENABLING CONCURRENT GLASS INSTALLATION WHILE THE CONTRACTOR
COMPLETES OTHER SITE WORK
CORIAN COMPONENTS SLEEVE OVER STEEL STRUCTURE
CORIAN COMPLETE, TREADS TO GO IN
MODEL DRIVEN FABRICATION ENABLES TREADS TO BE LASER CUT OFF-SITE.
TREADS AND RISERS ARE INSTALLED ON-SITE IN 2.5 DAYS
INSTALLATION OF HANDRAIL
A CENTRAL JIG ENABLES THE HANDRAIL TO BE OFF-SITE FABRICATED AVOIDING SEQUENTIAL
PRODUCTION AND SHAVING WEEKS OFF THE PROCESS
COMPLETION IMAGES
VECTOR PRAXIS_ULTRA CUSTOM FABRICATION PROJECT
VECTOR PRAXIS_ULTRA CUSTOM FABRICATION PROJECT
VECTOR PRAXIS_ULTRA CUSTOM FABRICATION PROJECT
VECTOR PRAXIS_ULTRA CUSTOM FABRICATION PROJECT
VECTOR PRAXIS_ULTRA CUSTOM FABRICATION PROJECT