The weekly progress report summarizes the work of an engineering team designing a toaster. In the first week, they researched toasters and identified options for indicating when bread is ready at three heat levels. Their engineering analysis found the designed toaster would have good performance at a reasonable price, though the existing structure may not fit additional components. Next steps include finalizing the circuit design and documentation.
1 of 1
More Related Content
Weekly report template
1. Name-Surname Mr. Niphon worathipromma
Student ID. 54261516
Group Name 8
Engineering Team
ten Golf tom b arm gun
Members
Product Design
Team Members
-
Weekly Progress
In the first week that I need to do is find out about. Toaster
And the option to work. The work has three levels: soft, warm.
And let us know if the bread is ready to eat or not.
Figure 1. Figure 2.
Engineering Analysis
Strong Point
Workable And better performance. The price is not much different.
Week Point
Therefore, the structure is not designed to have a device that may not fit the original structure.
Next Week Job
The design and the information included in the circuit.