The document discusses plans for the development of athlete villages in Kemayoran, Jakarta for the 2018 Asian Games. It provides details on the construction of 15 towers across three zones (C2, C3, and D10), with a total of 11,493 units that will house 22,986 athletes. The Ministry of Public Works and Public Housing and the housing corporation Perumnas will oversee construction, with plans to complete all towers by October 2017 through a design-and-build procurement process. A timeline is provided laying out the procurement and construction schedules.
Karakteistik, analisis dan recomendasi tapakrangga1261
Ìý
Dokumen tersebut membahas karakteristik, analisis, dan rekomendasi tapak koridor Gunung Raung dan Pasar Payuk. Koridor tersebut berfungsi sebagai jalur sirkulasi perdagangan dengan panjang 177,9 meter dan lebar 6 meter. Analisis menunjukkan sirkulasi kendaraan dan pejalan kaki perlu diperbaiki, sementara rekomendasi mencakup memperlebar trotoar, membuat terowongan, dan menata hijau untuk meningkatkan kenyamanan.
Dokumen tersebut membahas tentang struktur cangkang. Struktur cangkang adalah bentuk struktural tiga dimensi yang kaku dan tipis dengan permukaan lengkung. Dokumen tersebut menjelaskan pengertian, sifat, persyaratan struktur, klasifikasi berdasarkan bentuk geometri dan penyaluran beban pada struktur cangkang. Beberapa contoh struktur cangkang dijelaskan seperti Sydney Opera House, Teater Imax Keong Emas
Dokumen tersebut membahas tentang struktur kabel yang meliputi definisi, klasifikasi, jenis, sistem stabilisasi, kelebihan dan kekurangan struktur kabel. Struktur kabel dapat dikelompokkan menjadi struktur kabel tunggal dan ganda, serta dibedakan berdasarkan kelengkungan dan ketegangan kabel.
STRUKTUR DAN KONSTRUKSI IV - STRUKTUR PELENGKUNGoVaRisZar
Ìý
Dokumen ini membahas struktur lengkung, termasuk sejarahnya, jenisnya berdasarkan material dan bentuk, serta fungsi dan kelebihan kekurangannya. Struktur lengkung dibentuk dari elemen garis melengkung antara dua titik untuk membentangkan ruang dan menopang beban. Jenisnya meliputi pelengkung batu, kayu, beton bertulang, dan baja.
Ringkasan analisis tapak lahan di Bandung menunjukkan beberapa potensi dan kendala lokasi, termasuk orientasi selatan yang memungkinkan pemandangan 360 derajat, sirkulasi jalan utama sibuk, dan kebisingan dari lalu lintas. Solusi yang diusulkan adalah penempatan bangunan, pelestarian vegetasi, dan penataan utilitas bawah tanah.
Setya Kurniawan - #1 Arsitektur & Struktur Bangunan 2017.05.20 IND TEXTSetya Kurniawan
Ìý
Introduction of relationship between the choice of structure system according to its architectural concept. A preliminary study to help architects better understand structural theory and case studies
ARSITEKTUR BENTUK, RUANG, DAN TATANAN Francis D.K. CHING EXPERIENCE ARCHITECT...Rabiyatul Adawiyah
Ìý
Ringkasan dokumen tersebut adalah:
Masjid Al-Irsyad di Bandung dirancang mirip Ka'bah dengan memanfaatkan sinar matahari sebagai penerangan. Bangunan seluas 1.800 meter persegi ini menampilkan tiga warna utama dan memiliki konsep daya tembus cahaya yang baik.
Dokumen tersebut membahas sejarah Museum Nasional Republik Indonesia secara singkat, mulai dari masa pendiriannya sebagai Bataviaasch Genootschap van Kunsten en Wetenschappen pada abad ke-18 hingga berubah menjadi gedung museum yang dibuka untuk umum pada tahun 1868 dengan gaya arsitektur Neo-Klasik. Dokumen juga menjelaskan organisasi ruang dan fungsi ruang pada gedung museum saat ini.
Dokumen tersebut membahas tentang pengertian inti bangunan sebagai tempat sistem transportasi vertikal dan distribusi energi. Juga membahas bentuk, bahan, sistem struktur, dan utilitas yang ada di dalam inti bangunan.
"[Ringkasan]"
Dokumen tersebut membahas tentang perancangan kondotel di Kota Surabaya. Kondotel merupakan bangunan yang berfungsi sebagai hunian (kondominium) dan penginapan (hotel) secara bersamaan. Dokumen ini menjelaskan latar belakang permasalahan yang mendorong dibangunnya kondotel di Surabaya seperti tingginya permintaan hunian dan investasi, serta tujuan perancangan kondotel yang memiliki daya tarik bagi m
Dokumen tersebut membahas tentang dinding geser (shear wall) pada bangunan, yang berfungsi untuk menahan gaya geser akibat gempa bumi dan angin. Dinding geser didesain untuk menahan gaya lateral sehingga deformasi bangunan menjadi kecil. Dokumen ini menjelaskan berbagai jenis, fungsi, dan pertimbangan desain dari dinding geser.
Arsitektur Romanesque adalah gaya arsitektur abad pertengahan di Eropa antara abad ke-11 hingga ke-12. Gaya ini menggabungkan unsur-unsur arsitektur Romawi dan Bizantium dengan ide-ide agama Kristen. Bangunan utamanya adalah gereja-gereja dengan ciri khas penggunaan lengkungan, kolom, ukiran ornamen, dan dinding tebal. Unsur-unsurnya seperti arcade, kolom, kapital, dan vault membentuk kes
The document provides details of a project proposal for the establishment of Skybar & Skypark at Block E Level 2 at Taylor's University. The proposal includes a project summary, description, quotation, site analysis, design plans, authority procedures, bill of quantities, and conclusion. Specifically, the proposal seeks to build a skybar restaurant and recreation area with a total initial investment of RM250,000. The project is expected to create 10 new jobs and enhance student life at the university by providing a place for students to socialize and relieve stress.
This document is a project proposal for the establishment of a Skybar restaurant and Skypark recreation area at Block E Level 2 of Taylor's University. It includes details of the project such as location, site analysis, design plans, cost estimates, and required approval procedures from local authorities. The total initial investment is estimated at RM250,000, with 95% for building construction. It is expected to create 10 new jobs.
Dokumen tersebut membahas tentang struktur kabel yang meliputi definisi, klasifikasi, jenis, sistem stabilisasi, kelebihan dan kekurangan struktur kabel. Struktur kabel dapat dikelompokkan menjadi struktur kabel tunggal dan ganda, serta dibedakan berdasarkan kelengkungan dan ketegangan kabel.
STRUKTUR DAN KONSTRUKSI IV - STRUKTUR PELENGKUNGoVaRisZar
Ìý
Dokumen ini membahas struktur lengkung, termasuk sejarahnya, jenisnya berdasarkan material dan bentuk, serta fungsi dan kelebihan kekurangannya. Struktur lengkung dibentuk dari elemen garis melengkung antara dua titik untuk membentangkan ruang dan menopang beban. Jenisnya meliputi pelengkung batu, kayu, beton bertulang, dan baja.
Ringkasan analisis tapak lahan di Bandung menunjukkan beberapa potensi dan kendala lokasi, termasuk orientasi selatan yang memungkinkan pemandangan 360 derajat, sirkulasi jalan utama sibuk, dan kebisingan dari lalu lintas. Solusi yang diusulkan adalah penempatan bangunan, pelestarian vegetasi, dan penataan utilitas bawah tanah.
Setya Kurniawan - #1 Arsitektur & Struktur Bangunan 2017.05.20 IND TEXTSetya Kurniawan
Ìý
Introduction of relationship between the choice of structure system according to its architectural concept. A preliminary study to help architects better understand structural theory and case studies
ARSITEKTUR BENTUK, RUANG, DAN TATANAN Francis D.K. CHING EXPERIENCE ARCHITECT...Rabiyatul Adawiyah
Ìý
Ringkasan dokumen tersebut adalah:
Masjid Al-Irsyad di Bandung dirancang mirip Ka'bah dengan memanfaatkan sinar matahari sebagai penerangan. Bangunan seluas 1.800 meter persegi ini menampilkan tiga warna utama dan memiliki konsep daya tembus cahaya yang baik.
Dokumen tersebut membahas sejarah Museum Nasional Republik Indonesia secara singkat, mulai dari masa pendiriannya sebagai Bataviaasch Genootschap van Kunsten en Wetenschappen pada abad ke-18 hingga berubah menjadi gedung museum yang dibuka untuk umum pada tahun 1868 dengan gaya arsitektur Neo-Klasik. Dokumen juga menjelaskan organisasi ruang dan fungsi ruang pada gedung museum saat ini.
Dokumen tersebut membahas tentang pengertian inti bangunan sebagai tempat sistem transportasi vertikal dan distribusi energi. Juga membahas bentuk, bahan, sistem struktur, dan utilitas yang ada di dalam inti bangunan.
"[Ringkasan]"
Dokumen tersebut membahas tentang perancangan kondotel di Kota Surabaya. Kondotel merupakan bangunan yang berfungsi sebagai hunian (kondominium) dan penginapan (hotel) secara bersamaan. Dokumen ini menjelaskan latar belakang permasalahan yang mendorong dibangunnya kondotel di Surabaya seperti tingginya permintaan hunian dan investasi, serta tujuan perancangan kondotel yang memiliki daya tarik bagi m
Dokumen tersebut membahas tentang dinding geser (shear wall) pada bangunan, yang berfungsi untuk menahan gaya geser akibat gempa bumi dan angin. Dinding geser didesain untuk menahan gaya lateral sehingga deformasi bangunan menjadi kecil. Dokumen ini menjelaskan berbagai jenis, fungsi, dan pertimbangan desain dari dinding geser.
Arsitektur Romanesque adalah gaya arsitektur abad pertengahan di Eropa antara abad ke-11 hingga ke-12. Gaya ini menggabungkan unsur-unsur arsitektur Romawi dan Bizantium dengan ide-ide agama Kristen. Bangunan utamanya adalah gereja-gereja dengan ciri khas penggunaan lengkungan, kolom, ukiran ornamen, dan dinding tebal. Unsur-unsurnya seperti arcade, kolom, kapital, dan vault membentuk kes
The document provides details of a project proposal for the establishment of Skybar & Skypark at Block E Level 2 at Taylor's University. The proposal includes a project summary, description, quotation, site analysis, design plans, authority procedures, bill of quantities, and conclusion. Specifically, the proposal seeks to build a skybar restaurant and recreation area with a total initial investment of RM250,000. The project is expected to create 10 new jobs and enhance student life at the university by providing a place for students to socialize and relieve stress.
This document is a project proposal for the establishment of a Skybar restaurant and Skypark recreation area at Block E Level 2 of Taylor's University. It includes details of the project such as location, site analysis, design plans, cost estimates, and required approval procedures from local authorities. The total initial investment is estimated at RM250,000, with 95% for building construction. It is expected to create 10 new jobs.
The proposed project is a group housing development called Aqua City Phase 1 located in Danapur, Patna, Bihar. It will consist of 23 building blocks and over 1,500 residential units across a site area of over 50,000 square meters. It will include amenities such as parking, a community hall, shops, a school, and a health club. The development aims to adopt green building practices and conserve energy and water resources.
The document is a detailed project report for housing and infrastructure projects under the Pradhan Mantri Awas Yojana 2015 in Vadodara, Gujarat. It includes housing construction and infrastructure components for multiple sites involving the construction of over 1500 dwelling units. It provides housing construction costs, infrastructure costs, and total project costs for each site as well as overall summary cost sheets and budgets for the projects.
This document provides information on a proposed 17-story office building called TB Simatupang located in Jakarta, Indonesia. It includes details on the building area calculations, parking calculations, building concept, site plan, floor plans, sections, and renderings. The project team includes consultants for architecture, structure, geotechnics, MEP, quantity surveying, construction management, interior design, landscaping, and special lighting.
This weekly progress report summarizes the status of the Sunshine SPL Estate Pvt Ltd construction project for week 2 of December 2023. Procurement is ongoing for steel and safety training programs have been conducted. For quality, more non-conformance reports were issued than closed. Work done targets were not fully achieved for the quarter or year to date. Key milestones like the pile foundation for Tower 2C are in progress. Structural construction is ongoing across towers, with the 11th floor roof in progress for Tower 3E.
ANPARA D FGD PPT 07.06.2023-M (2).pptxssuser3797b9
Ìý
The chairman reviewed the FGD project at Anpara power plant. Based on the contractor's revised schedule, the expected completion dates for the two units are June 2024 and September 2024, which is later than the previous dates. The project progress is currently at 33% overall. Several milestones are delayed compared to the original schedule. The contractor has deployed 413 workers which is less than the promised 500. Critical issues include a subcontractor stopping work due to payment issues and insufficient material and equipment. The contractor has also submitted a claim notice seeking an equitable price adjustment of over USD 10 million and INR 232 crores citing unforeseen conditions and changes in law.
The document provides information on King Abdullah Financial District PPA-30 project. The project involves construction of multiple zones, with Zone 1 containing 5 parcels and Zone 2 containing 7 parcels. Each parcel will include office spaces, residential areas, retail spaces and other facilities. Construction started in September 2010 and is scheduled to be completed by November 2012, with 40% of the work already completed at the time of reporting.
The document provides information on King Abdullah Financial District PPA-30 project. The project involves construction of multiple zones, with Zone 1 containing 5 parcels and Zone 2 containing 7 parcels. Each parcel will include office spaces, residential units, retail areas, and other facilities. Construction started in September 2010 and is scheduled to be completed by November 2012, with 40% of the scheduled time already elapsed.
This document provides details for preparing an application for environmental clearance of a construction project. It includes the objective to prepare the proposal, methodology which involves providing checklists and drawings to the client. It then provides a case study of the Vatika Urban Expression project with details of the project, population calculation, water and waste management, parking and power requirements. It aims to obtain environmental clearance for the proposed construction.
The monthly progress report summarizes the progress of 6 road construction projects in Assam funded by the Asian Infrastructure Investment Bank. It provides details of total length, cost, construction period and milestones for each project. Physical progress is reported at 0.10% of the targeted work with financial progress at 0% as construction is yet to begin for most projects. Culvert construction has started for one project with 0.60% progress. Overall, construction is in the preliminary stage with no progress achieved for most items of work across the different projects during the reported month of October 2022.
This document provides details about the construction of a multi-specialty Apollo hospital in Navi Mumbai, India. It discusses the project details including location, built-up area, completion timeline, and objectives. It also outlines the scope of work, quantities, agencies involved, construction activities and progress updates. Key aspects covered include the contract details, material information, construction methodology, quality testing procedures, and status of work completed.
The document discusses the geometric design of roads, including determining design elements like the road category, design speed, maximum grades, horizontal curves, and vertical curves. It also includes plans showing the curve of levels and design of horizontal curves for specific roads within the project. Calculations are shown for the longitudinal profile and mass diagram of some streets.
This document is a training report submitted for partial fulfillment of a Bachelor of Technology degree in Civil Engineering. It details a project on road widening and upgradation of the 41 km Chandauli-Saidpur road (SH-69) in Uttar Pradesh, India. The report includes an acknowledgment, declaration, specification, introduction, measurement details, drawings, bill of quantity, responsibilities and objectives. It also describes concreting work done, provides an abstract of costs, and details on-site experiments to determine concrete penetration and compressive strength. The conclusion states that dividing the road into lanes has avoided traffic jams in Chandauli.
1. The document provides an elemental cost analysis for the proposed construction of a 4-storey primary school building with 36 classrooms and other facilities, and a single-storey canteen.
2. The total construction cost is estimated to be RM6,949,424.43 excluding contingencies, with the largest cost elements being substructure works, superstructure, finishes, and services.
3. Key specifications outlined include reinforced concrete structural elements, 115mm thick brick walls, metal framed doors and windows, roofing with concrete tiles and insulation, and ceramic wall tiles and ceiling boards for internal finishes.
This document summarizes the planning, analysis, and design of a restaurant building by a group of civil engineering students. It includes the floor plans for the ground and first floors, with allocation of spaces for different functions. Structural elements like slabs, beams, columns, footings, and staircases were designed using STADD PRO V8i software according to IS codes. Reinforcement details are provided. The document concludes that the building plan and structural design satisfy code requirements to provide an efficient restaurant facility.
This document contains a drawing list for a building project. It includes the titles of 16 drawings, their numbers, and the names of the people who drew them. The drawings include site plans, floor plans, elevations, and schedules for doors and windows. The list also notes the scales of some of the drawings.
Engineering at Lovely Professional University (LPU).pdfSona
Ìý
LPU’s engineering programs provide students with the skills and knowledge to excel in the rapidly evolving tech industry, ensuring a bright and successful future. With world-class infrastructure, top-tier placements, and global exposure, LPU stands as a premier destination for aspiring engineers.
How to Build a Maze Solving Robot Using ArduinoCircuitDigest
Ìý
Learn how to make an Arduino-powered robot that can navigate mazes on its own using IR sensors and "Hand on the wall" algorithm.
This step-by-step guide will show you how to build your own maze-solving robot using Arduino UNO, three IR sensors, and basic components that you can easily find in your local electronics shop.
Preface: The ReGenX Generator innovation operates with a US Patented Frequency Dependent Load Current Delay which delays the creation and storage of created Electromagnetic Field Energy around the exterior of the generator coil. The result is the created and Time Delayed Electromagnetic Field Energy performs any magnitude of Positive Electro-Mechanical Work at infinite efficiency on the generator's Rotating Magnetic Field, increasing its Kinetic Energy and increasing the Kinetic Energy of an EV or ICE Vehicle to any magnitude without requiring any Externally Supplied Input Energy. In Electricity Generation applications the ReGenX Generator innovation now allows all electricity to be generated at infinite efficiency requiring zero Input Energy, zero Input Energy Cost, while producing zero Greenhouse Gas Emissions, zero Air Pollution and zero Nuclear Waste during the Electricity Generation Phase. In Electric Motor operation the ReGen-X Quantum Motor now allows any magnitude of Work to be performed with zero Electric Input Energy.
Demonstration Protocol: The demonstration protocol involves three prototypes;
1. Protytpe #1, demonstrates the ReGenX Generator's Load Current Time Delay when compared to the instantaneous Load Current Sine Wave for a Conventional Generator Coil.
2. In the Conventional Faraday Generator operation the created Electromagnetic Field Energy performs Negative Work at infinite efficiency and it reduces the Kinetic Energy of the system.
3. The Magnitude of the Negative Work / System Kinetic Energy Reduction (in Joules) is equal to the Magnitude of the created Electromagnetic Field Energy (also in Joules).
4. When the Conventional Faraday Generator is placed On-Load, Negative Work is performed and the speed of the system decreases according to Lenz's Law of Induction.
5. In order to maintain the System Speed and the Electric Power magnitude to the Loads, additional Input Power must be supplied to the Prime Mover and additional Mechanical Input Power must be supplied to the Generator's Drive Shaft.
6. For example, if 100 Watts of Electric Power is delivered to the Load by the Faraday Generator, an additional >100 Watts of Mechanical Input Power must be supplied to the Generator's Drive Shaft by the Prime Mover.
7. If 1 MW of Electric Power is delivered to the Load by the Faraday Generator, an additional >1 MW Watts of Mechanical Input Power must be supplied to the Generator's Drive Shaft by the Prime Mover.
8. Generally speaking the ratio is 2 Watts of Mechanical Input Power to every 1 Watt of Electric Output Power generated.
9. The increase in Drive Shaft Mechanical Input Power is provided by the Prime Mover and the Input Energy Source which powers the Prime Mover.
10. In the Heins ReGenX Generator operation the created and Time Delayed Electromagnetic Field Energy performs Positive Work at infinite efficiency and it increases the Kinetic Energy of the system.
Optimization of Cumulative Energy, Exergy Consumption and Environmental Life ...J. Agricultural Machinery
Ìý
Optimal use of resources, including energy, is one of the most important principles in modern and sustainable agricultural systems. Exergy analysis and life cycle assessment were used to study the efficient use of inputs, energy consumption reduction, and various environmental effects in the corn production system in Lorestan province, Iran. The required data were collected from farmers in Lorestan province using random sampling. The Cobb-Douglas equation and data envelopment analysis were utilized for modeling and optimizing cumulative energy and exergy consumption (CEnC and CExC) and devising strategies to mitigate the environmental impacts of corn production. The Cobb-Douglas equation results revealed that electricity, diesel fuel, and N-fertilizer were the major contributors to CExC in the corn production system. According to the Data Envelopment Analysis (DEA) results, the average efficiency of all farms in terms of CExC was 94.7% in the CCR model and 97.8% in the BCC model. Furthermore, the results indicated that there was excessive consumption of inputs, particularly potassium and phosphate fertilizers. By adopting more suitable methods based on DEA of efficient farmers, it was possible to save 6.47, 10.42, 7.40, 13.32, 31.29, 3.25, and 6.78% in the exergy consumption of diesel fuel, electricity, machinery, chemical fertilizers, biocides, seeds, and irrigation, respectively.
1. MINISTRY OF PUBLIC WORK AND PUBLIC HOUSING
DIRECTORATE GENERAL OF HOUSING PROVISION
FEBRUARY 2016
KEMAYORAN
ATHLETE VILLAGES
TOWARDS ASIAN GAMES 2018
3. A. Kemayoran Athlete Villages
ZONE D10
Tower : 7 (24 & 32 lt)
Unit : 5.594
Spacious : 333.700 m2
Capacity : 11.188 persons
Build by : PUPR
ZONE C2
Tower : 3 (18 & 24 lt)
Unit : 1.930
Spacious : 135.000 m2
Capacity : 3.860 persons
Build by : PUPR
PROGRESS
• Procurement method: Design and Build
• Pre Qualification bidding Announcement January 12th 2016
• The entire contract is expected to be completed on March 9th 2016
• Construction will be completed by October 2017
ZONE C3
Tower : 5 (22 & 24 lt)
Unit : 3.969 (T.36)
Spacious : 80.200 m2
Capacity : 7.938 persons
Build by : Perumnas
TOTAL
Tower : 15
Unit : 11.493
Spacious : 611.612 m2
Capacity : 22.986 persons
Build by : PUPR and Perumnas
• The development of Athlete Village
consists of the buldings,
surrounding infrstructure and
utilities
4. A. Wisma Atlet Kemayoran
BLOK D10
Tower : 7 (24 & 32 lt)
Unit : 5.594
Luas : 333.700 m2
Penghuni : 11.188
Pelaksana : PUPR
BLOK C2
Tower : 3 (18 & 24 lt)
Unit : 1.930
Luas : 135.000 m2
Penghuni : 3.860
Pelaksana : PUPR
PROGRES PERSIAPAN
PEMBANGUNAN
• Sistem pengadaan Design and Build
• Pengumuman pra-kualifikasi lelang
tanggal 12 Januari 2016.
• Rencana kontrak tanggal 9 Maret 2016
• Rencana selesai konstruksi ≤ Oktober 2017
• Bangunan Wisma Atlet akan
dilaksanakan termasuk dengan penataan
lingkungannya.
BLOK C3
Tower : 5 (22 & 24 lt)
Unit : 3.969 (T.36)
Luas : 80.200 m2
Penghuni : 7.938
Pelaksana : Perumnas
TOTAL
Tower : 15
Unit : 11.493
Luas : 611.612 m2
Penghuni : 22.986
Pelaksana : PUPR dan
Perumnas
5. Zone Costructed By
Total Building
Area
Quantity of
Tower
Quantity of
Unit
Quantity of
Accupants
C2
Ministry of Public
Work and Public
Housing
135.000 3 1.930 3.860
C3 PERUMNAS 80.200 5 3.969 7.938
D10
Ministry of Public
Work and Public
Housing
333.700 7 5.594 11.188
Total 15 11.493 22.986
CAPACITY OF KEMAYORAN ATHLETE VILLAGE
5
*) note: 1 (one) unit occupied by 2 (two) persons
8. Athletes Village
Media Village
Block C2 & C3
Media Village
Block D10
Athletes Village
JIExpo
Block C2 & C3
Media Village
Block D10
Athletes Village
JIExpo
14. ATHLETES VILLAGE – D10
TRANSPORTATION
ZONE
FLAG PLAZA
HOSPITAL
RESIDENTIAL
ZONE
Recreation Park
750 seats
750 seats
750 seats
750 seats
DINNING HALL
On 3rd floor Open Space
(total 1500 seats)
750 seats
750 seats
Service
Access
Service
Access
Service
Access
DINNING HALL
On 3rd floor Open
Space
(total 3000 seats)
15. TRANSPORT
ZONE
FLAGS PLAZA RESIDENTIAL
ZONE
Rumah Sakit
(eksisting)
Sekolah Jubilee
(eksisting)
International / Transportation Zone
Meminjam sebagian lahan Rumah Sakit sbg Transport Zone
Halte
Busway
Angkot
LRT
16. +2.00
+2.00
+1.00
±0.00+2.00
+1.00
MESJID
LOKASI WTP
-4.00
TK & SD
SEKOLAH
RS MITRA KEMAYORAN
(eksisting)
SEKOLAH JUBILEE
(eksisting)
+4.00
+5.00
+6.00
+8.00
+3.00
±0.00
-1.00
-2.00
-3.00
POS DAMKAR
KELURAHAN
4.00
P L A Z A
±0.00
STASIUN LRT
+0.50
RAK SEPEDA
SHOWERS
GROUND TANK
LOBBY
±0.00
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
LIFT LOBBY
±0.00
TOKO / WARUNG
±0.00
SERVICE DOCK
-0.15
RAK SEPEDA
-0.15
SHOWERS
-0.05
TAMAN
-0.15
PARKIR SEPEDA
-0.15
AREA DUDUK
-0.30
AREA DUDUK
PARKIR SEPEDA MOTOR
-0.15
PARKIR MOBIL
+1.50
SERVICE DOCK
-0.15
SERVICE DOCK
-0.15
PARKIR MOBIL
+1.50
PARKIR SEPEDA MOTOR
-0.15
TOKO / WARUNG
±0.00
PARKIR SEPEDA
-0.15
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
TAMAN
-0.15
AREA DUDUK
-0.30
AREA DUDUK
LOBBY
±0.00
-0.15
DROP-OFF
SERVICE DOCK
-0.15
SERVICE DOCK
-0.15
RAK SEPEDA
-0.15
RAK SEPEDA
-0.15
SHOWERS
-0.05
SHOWERS
-0.05
LOBBY
±0.00
-0.15
DROP-OFF
PLAZA INTERNAL
PARKIR MOBIL
+1.50
PARKIR SEPEDA MOTOR
-0.15
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
LIFT LOBBY
±0.00
LIFT LOBBY
±0.00
MEP
Kotak Surat
MEP
Kotak Surat
MEP
Kotak Surat
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
PARKIR SEPEDA
-0.15
PARKIR SEPEDA
-0.15
SERVICE DOCK
-0.15
SERVICE DOCK
-0.15
PARKIR MOBIL
+1.50
PARKIR SEPEDA MOTOR
-0.15
LOBBY
±0.00
-0.15
DROP-OFF
LIFT LOBBY
±0.00
MEP
Kotak Surat
TAMAN
-0.15
PLAZA INTERNAL
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
TOKO / WARUNG
±0.00
PARKIR SEPEDA
-0.15
PARKIR SEPEDA
-0.15
TAMAN
-0.15
TAMAN
-0.15
LOBBY
±0.00
-0.15
DROP-OFF
SERVICE DOCK
-0.15
RAK SEPEDA
-0.15
SHOWERS
-0.05
RAK SEPEDA
-0.15
LOBBY
±0.00
-0.15
DROP-OFF
SERVICE DOCK
-0.15
SERVICE DOCK
-0.15
SERVICE DOCK
-0.15
LIFT LOBBY
±0.00
MEP
Kotak Surat
LIFT LOBBY
±0.00
MEP
Kotak Surat
PARKIR MOBIL
+1.50
PARKIR SEPEDA MOTOR
-0.15
PARKIR SEPEDA MOTOR
-0.15
PARKIR MOBIL
+1.50
LAGOON
KOLAM HIAS
R. PLN
TRAFO
PDTR
PDTM
CAP BANK
R. PLN
TRAFO
PDTR
PDTM
CAP BANK
R. PLN
TRAFO
PDTR
PDTM
CAP BANK
TRAFO
PDTR
PDTM
CAP BANK
R.PANEL Tower 1 & 2
R.PANEL Tower 3 & 4
R.PANEL Tower 5 & 6
R.PANEL Tower 7
R.KONTROL
±0.00
FCC
±0.00
FCC
±0.00
FCC
±0.00
FCC
±0.00
FCC
±0.00
FCC
±0.00
FCC
±0.00
-0.15
DROP-OFF
TRANSPORT
ZONE
25. APR-DES
1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12
PROCUREMENT
a Pre Qualification Announcement
b Pre Qualification Evaluation
c Procurement
d Procurement selected
e Signing contract
CONSTRUCTION
a 18 Floor Building
b 24 Floor Building
c 32 Floor Building
2017
2016
ACTIVITIESNO
MARETFEBRUARIJANUARI
SCHEDULE
• Pre Qualification Announcement : January 12th 2016
Signing contract : March 9th 2016
Ground Breaking : March 15th 2016
PHO 18 floor,
MAY 2017
PHO 24 floor,
JULY 2017
PHO 32 floor,
OCT 2017
• Construction goals
18 Floor Building : May 2017 (14th
month)
24 Floor Building : July 2017 (16th
month)
32 Floor Building : October 2017 (18 month)
NO ACTIVITIES 2016
1 2 3 4 5 6 7 8 9 10 11 12
PROCUREMENT
a Procurement Process
b Signing Contract
CONSTRUCTION
5 floor Building
A. Kemayoran
B. Jakabaring
• 3 (three) tower already built on 2015
• Procurement process of 2 (two) remaining
tower on 2016
• Signing contract : February 11th 2016
• Construction time (8 month) : October 2016
26. APR-DES
1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12
PELELANGAN
a Pengumuman PQ
b Evaluasi PQ dan Penetapan
c Pemilihan
d Penetapan Pemenang
e Penandatanganan Kontrak
PELAKSANAAN KONSTRUKSI
a Bangunan Rusun (Wisma Atlet) 18 lantai
b Bangunan Rusun (Wisma Atlet) 24 lantai
c Bangunan Rusun (Wisma Atlet) 32 lantai
2017
2016
KEGIATANNO
MARETFEBRUARIJANUARI
JADWAL PELAKSANAAN
• Pengumuman Pra-Kualifikasi (PQ) : 12 Januari 2016
Penandatanganan Kontrak : 9 Maret 2016
Ground Breaking : 15 Maret 2016
PHO 18 lantai,
MEI 2017
PHO 24 lantai,
JULI 2017
PHO 32 lantai,
OKT 2017
• Target Penyelesaian
Bangunan 18 lantai : Mei 2017 (14 bulan)
Bangunan 24 lantai : Juli 2017 (16 bulan)
Bangunan 32 lantai : Oktober 2017 (18bulan)
A. Kemayoran
B. Jakabaring
• Rusun Wisma Atlet telah terbangun:
3 (tiga) tower TA. 2015
• Proses Lelang 2 (dua) tower TA. 2016
Jan-Feb 2016
• Tandatangan Kontrak): 11 Februari 2016
• Konstruksi (8 bulan) : Oktober 2016
NO KEGIATAN 2016
1 2 3 4 5 6 7 8 9 10 11 12
PELELANGAN (2 tower) TA.2016
a Proses Pelelangan
b Penandatanganan Kontrak
PELAKSANAAN KONSTRUKSI
Bangunan Rusun (Wisma Atlet) 5 lantai