WRE water resources engineering lab work for civil engineering.
Index
Design a Sarda type fall for following data:
(i) Full supply discharge Us/Ds = 45 Cumec
(ii) Full supply Level Us/Ds = 118.30m/116.80m
(iii) Full supply depth Us/Ds = 1.8m/1.8m
(iv) Bed width Us/Ds = 28m/28m
(v) Bed level Us/Ds = 116.5m/115m
Drop 1.5m & Taking Blighs coefficient of creep =8
Calculate uplift pressure
Check the stability of gravity dam
A masonry dam 6 meter high
1 of 24
More Related Content
WRE water resources engineering lab work by Mr. Denish Jangid