EI-Education
Best practice example from Bulgaria
Zaharna
Fabrika
Bulgaria
50% energy saving
Improved and enlarged building
Flexible financing schemes allow owners with low incomes to realize the
refurbishment of their dwellings
Project data
Location, address: Block 10, district Zaharna Fabrika, Sofia
Region: Western Bulgaria
Surroundings: City
Climate: Mild continental
Heating degree days: 2900 in the heating season (mid of October - mid of April)
Year of construction and renovation: 1947 (constructed); 2004 (renovated)
Typology: Multi-dwelling building
No of dwellings: 13
Total floor area: 1100m
2
living area before renovation; 1160 m
2
living area after renovation
Owner: Owner occupied flats
Renovation design team: Arch Plus
Realization team:
Renovation financed by: Credit from
Objectives and results
The objectives of this project were to carry out a renovation and further
maintenance of multi-dwelling building which flats are owned by the inhabitants,
overcoming the problems that arise from the low incomes of the owners and their
different interests. The renovation should also lead to a lower energy
consumption and improvement of the comfort of the flats.
The project includes also a whole reconstruction of the roof. On the last floor
(attic) there are two common premises that were transformed in small flats. The
rent of these new flats will help the reimbursement of the loan.
The project is initiated and realised by Bulgarian Housing Association in
partnership with Housing Association De Nieuwe Unie, Rotterdam and Housing
Association Woondrecht, Dordrecht.
Fig. 1 Building before renovation
Renovation concept
Key renovation features
 Thermal insulation of external
walls;
 Whole reconstruction of the
attic;
 Water proofing and thermal
insulation of roof;
 New double glazed windows
with PVC frames;
 Thermal insulation of basement
ceiling;
 Improvement of heating
system.
Fig. 2 New attic
Best practice example from Bulgaria
State-of-the-art
Before renovation After renovation
Constructions [U-values: W/m
2
K] Constructions [U-values: W/m
2
K]
 Roof  New insulated roof 0,5
 Non-insulated basement  Insulation of basement ceiling 0.52
 Non-insulated external brick walls  Insulation of external brick walls 0,52
 Double glazed wooden window s 2,9  New double glazed windows with PVC frames
Installations Installations
Heat substation supplied by district heating  Improvement of the heating system (balance,
insulation of pipes)
Energy saving and monitoring
Energy consumption before renovation:
KWh/m
2
per year: heating 162.6
hot water 30.5
integrated characteristic 194.7
Energy consumption after renovation:
KWh/m
2
per year: heating 60.2
hot water 43.8
integrated characteristic 105.6
Percentage energy saving 46%
After the renovation the building get certificate A.
Integrated characteristic required for certificate A 
121.7 KWh/m2
per year.
Fig.3 Refurbished building
Additional information
 For the realization of the project was registered the first association of owners in Bulgaria;
 The project is financed through a loan from banks from Nederland as they offered lower interest rates, the
loan is for 20 years;
 The monthly payment of the loan is 700 BGN (approx. 350 Euros), but half of this amount is ensured by
the rent of the two new flats in the attic;
 The project can easily be replicated in the neighbouring buildings, as they are the same;
 An energy monitoring was done before and after the refurbishment;
 The inhabitants are satisfied by the results, the renovation lengthen the life span of the building with 40
years, the insulation of the external envelope lead to a better comfort and energy saving.
Lessons learned and conclusions
 For the realization of refurbishment of a multi-dwelling building it is necessary to involve all owners and to
organise them in an association;
 The costs of refurbishment can be, at least partially, covered by an extension of the building. Most of the
buildings could be extended with an additional floor;
 The financing institutions should be flexible when giving loans for such projects, most of the owners are
with low or medium incomes and the banks should take this into account.

More Related Content

What's hot (7)

Northern Illinois University_Cole Hall2 CHI cs
Northern Illinois University_Cole Hall2 CHI csNorthern Illinois University_Cole Hall2 CHI cs
Northern Illinois University_Cole Hall2 CHI cs
Monica LaBrot
Maragkos short portfolio_2013
Maragkos short portfolio_2013Maragkos short portfolio_2013
Maragkos short portfolio_2013
Dr. Antonios Maragkos
Buildings rural
Buildings ruralBuildings rural
Buildings rural
lunarbay
Introducing energy efficiency in cambodia
Introducing energy efficiency in cambodiaIntroducing energy efficiency in cambodia
Introducing energy efficiency in cambodia
Benoit Lacroix
525 Golden Gate Fact Sheet
525 Golden Gate Fact Sheet525 Golden Gate Fact Sheet
525 Golden Gate Fact Sheet
Anastasios T. Stathopoulos, AIA, LEED AP BD+C
CREAConstructionEvent: Roland Hill part 2
CREAConstructionEvent: Roland Hill part 2CREAConstructionEvent: Roland Hill part 2
CREAConstructionEvent: Roland Hill part 2
LauraCBEN
2015 Commercial projects-et
2015 Commercial projects-et2015 Commercial projects-et
2015 Commercial projects-et
Elaine Tuttle, LEED AP BD+C, NAHB CGP

Viewers also liked (17)

Book festa dello sport 2015
Book festa dello sport 2015Book festa dello sport 2015
Book festa dello sport 2015
Orlando Galimberti
Training Manual
Training ManualTraining Manual
Training Manual
M.A.K Jahid
Country Report_MA 0259_Pakistan
Country Report_MA 0259_PakistanCountry Report_MA 0259_Pakistan
Country Report_MA 0259_Pakistan
ASM Amanullah
Dictados unidades 1 y 2Dictados unidades 1 y 2
Dictados unidades 1 y 2
Manu Ruiz Correro
The science of selling chapter 4
The science of selling chapter 4The science of selling chapter 4
The science of selling chapter 4
Carpedia Consulting
Shivashtakam Kannada Transliteration
Shivashtakam Kannada TransliterationShivashtakam Kannada Transliteration
Shivashtakam Kannada Transliteration
Ravi Ramakrishnan
犖犖迦犖犖犖犖朽8 chompoo
犖犖迦犖犖犖犖朽8 chompoo犖犖迦犖犖犖犖朽8 chompoo
犖犖迦犖犖犖犖朽8 chompoo
ja0894367792
F odaF oda
F oda
Dennis Jacome
VOCABULARY  SOCIAL SCIENCES UNIT 3VOCABULARY  SOCIAL SCIENCES UNIT 3
VOCABULARY SOCIAL SCIENCES UNIT 3
Manu Ruiz Correro
REPAREREPARE
REPARE
Plan竪te Enfants
The way we communicate
The way we communicateThe way we communicate
The way we communicate
Manu Ruiz Correro
DISEO DE INTERIORES BASADO EN EL VINILO AUTO ADHESIVO - PERDISEO DE INTERIORES BASADO EN EL VINILO AUTO ADHESIVO - PER
DISEO DE INTERIORES BASADO EN EL VINILO AUTO ADHESIVO - PER
GRAPHIC DESIGN PER
Clinical examination of cranial nerves
Clinical examination of cranial nervesClinical examination of cranial nerves
Clinical examination of cranial nerves
Oriba Dan Langoya
Matriz o単a-y-pinto(1)Matriz o単a-y-pinto(1)
Matriz o単a-y-pinto(1)
Bryan Hardy
Plan de-vidaPlan de-vida
Plan de-vida
Bryan Hardy
Book festa dello sport 2015
Book festa dello sport 2015Book festa dello sport 2015
Book festa dello sport 2015
Orlando Galimberti
Training Manual
Training ManualTraining Manual
Training Manual
M.A.K Jahid
Country Report_MA 0259_Pakistan
Country Report_MA 0259_PakistanCountry Report_MA 0259_Pakistan
Country Report_MA 0259_Pakistan
ASM Amanullah
Dictados unidades 1 y 2Dictados unidades 1 y 2
Dictados unidades 1 y 2
Manu Ruiz Correro
The science of selling chapter 4
The science of selling chapter 4The science of selling chapter 4
The science of selling chapter 4
Carpedia Consulting
Shivashtakam Kannada Transliteration
Shivashtakam Kannada TransliterationShivashtakam Kannada Transliteration
Shivashtakam Kannada Transliteration
Ravi Ramakrishnan
犖犖迦犖犖犖犖朽8 chompoo
犖犖迦犖犖犖犖朽8 chompoo犖犖迦犖犖犖犖朽8 chompoo
犖犖迦犖犖犖犖朽8 chompoo
ja0894367792
VOCABULARY  SOCIAL SCIENCES UNIT 3VOCABULARY  SOCIAL SCIENCES UNIT 3
VOCABULARY SOCIAL SCIENCES UNIT 3
Manu Ruiz Correro
DISEO DE INTERIORES BASADO EN EL VINILO AUTO ADHESIVO - PERDISEO DE INTERIORES BASADO EN EL VINILO AUTO ADHESIVO - PER
DISEO DE INTERIORES BASADO EN EL VINILO AUTO ADHESIVO - PER
GRAPHIC DESIGN PER
Clinical examination of cranial nerves
Clinical examination of cranial nervesClinical examination of cranial nerves
Clinical examination of cranial nerves
Oriba Dan Langoya
Matriz o単a-y-pinto(1)Matriz o単a-y-pinto(1)
Matriz o単a-y-pinto(1)
Bryan Hardy
Plan de-vidaPlan de-vida
Plan de-vida
Bryan Hardy

Similar to Zaharna Fabrika pilot (20)

Ne zer+ d2+2+nzebr+success+cases
Ne zer+ d2+2+nzebr+success+casesNe zer+ d2+2+nzebr+success+cases
Ne zer+ d2+2+nzebr+success+cases
Belinda Pelaz S叩nchez
BER - National Home Retrofit Programme
BER - National Home Retrofit ProgrammeBER - National Home Retrofit Programme
BER - National Home Retrofit Programme
SustainableEnergyAut
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
Lwj Welson
Tipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes projectTipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes project
Tipperary Energy Agency
VERDI - OpenSource 11kWh/m2 Modular envelope NeZeR
VERDI - OpenSource 11kWh/m2 Modular envelope NeZeRVERDI - OpenSource 11kWh/m2 Modular envelope NeZeR
VERDI - OpenSource 11kWh/m2 Modular envelope NeZeR
Andrei Toma
Energy cork tea 29 oct15
Energy cork tea 29 oct15Energy cork tea 29 oct15
Energy cork tea 29 oct15
Dr Shirley Gallagher
Energy efficiency in existing buildings
Energy efficiency in existing buildingsEnergy efficiency in existing buildings
Energy efficiency in existing buildings
Gabriele Sorg
Life cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy constructionLife cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy construction
Ruukki
SERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & LessonsSERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & Lessons
Tipperary Energy Agency
REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN Information package n2 - Energiesprong 2050 project REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN
Energy Show 2022 - Information Session for Contractors on SEAIs new grants r...
Energy Show 2022 - Information Session for Contractors on SEAIs new grants r...Energy Show 2022 - Information Session for Contractors on SEAIs new grants r...
Energy Show 2022 - Information Session for Contractors on SEAIs new grants r...
SustainableEnergyAut
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
GBC Finland
PLANS, DETAILS AND MATERIALS FINAL PROJECT
PLANS, DETAILS AND MATERIALS FINAL PROJECTPLANS, DETAILS AND MATERIALS FINAL PROJECT
PLANS, DETAILS AND MATERIALS FINAL PROJECT
Monica Badia Marin
Buildings: a huge potential for energy savings in France
Buildings: a huge potential for energy savings in France Buildings: a huge potential for energy savings in France
Buildings: a huge potential for energy savings in France
St辿fan Le D短
REMOURBAN Information package n2 - District Retrofitting
REMOURBAN Information package n2 - District RetrofittingREMOURBAN Information package n2 - District Retrofitting
REMOURBAN Information package n2 - District Retrofitting
REMOURBAN
MicroVent: Energy-Efficient, Fa巽ade-Integrated Ventilation Systems with Heat ...
MicroVent: Energy-Efficient, Fa巽ade-Integrated Ventilation Systems with Heat ...MicroVent: Energy-Efficient, Fa巽ade-Integrated Ventilation Systems with Heat ...
MicroVent: Energy-Efficient, Fa巽ade-Integrated Ventilation Systems with Heat ...
RINNO
Innovation Forum @ Klimainfisso | Roberto Lollini (EURAC)
Innovation Forum @ Klimainfisso | Roberto Lollini (EURAC)Innovation Forum @ Klimainfisso | Roberto Lollini (EURAC)
Innovation Forum @ Klimainfisso | Roberto Lollini (EURAC)
FACE - Fa巽ades WG @ TIS innovation park
04cB3 study PLEA2004.pdf
04cB3 study PLEA2004.pdf04cB3 study PLEA2004.pdf
04cB3 study PLEA2004.pdf
webtierra
Deep Retrofit: The Dun Laoghaire-Rathdown Experience
Deep Retrofit: The Dun Laoghaire-Rathdown ExperienceDeep Retrofit: The Dun Laoghaire-Rathdown Experience
Deep Retrofit: The Dun Laoghaire-Rathdown Experience
SustainableEnergyAut
Poland`s experience with renovation financing | ukasz Polakowski
Poland`s experience with renovation financing | ukasz Polakowski Poland`s experience with renovation financing | ukasz Polakowski
Poland`s experience with renovation financing | ukasz Polakowski
Ekonomikas ministrija/ Dz朝vo siltk
BER - National Home Retrofit Programme
BER - National Home Retrofit ProgrammeBER - National Home Retrofit Programme
BER - National Home Retrofit Programme
SustainableEnergyAut
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
Lwj Welson
Tipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes projectTipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes project
Tipperary Energy Agency
VERDI - OpenSource 11kWh/m2 Modular envelope NeZeR
VERDI - OpenSource 11kWh/m2 Modular envelope NeZeRVERDI - OpenSource 11kWh/m2 Modular envelope NeZeR
VERDI - OpenSource 11kWh/m2 Modular envelope NeZeR
Andrei Toma
Energy efficiency in existing buildings
Energy efficiency in existing buildingsEnergy efficiency in existing buildings
Energy efficiency in existing buildings
Gabriele Sorg
Life cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy constructionLife cycle cost-efficient near zero-energy construction
Life cycle cost-efficient near zero-energy construction
Ruukki
SERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & LessonsSERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & Lessons
Tipperary Energy Agency
REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN Information package n2 - Energiesprong 2050 project REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN Information package n2 - Energiesprong 2050 project
REMOURBAN
Energy Show 2022 - Information Session for Contractors on SEAIs new grants r...
Energy Show 2022 - Information Session for Contractors on SEAIs new grants r...Energy Show 2022 - Information Session for Contractors on SEAIs new grants r...
Energy Show 2022 - Information Session for Contractors on SEAIs new grants r...
SustainableEnergyAut
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
[Nordic GBC Conference 2013] Ville Reinikainen: Renewal of Meilahti Tower Hos...
GBC Finland
PLANS, DETAILS AND MATERIALS FINAL PROJECT
PLANS, DETAILS AND MATERIALS FINAL PROJECTPLANS, DETAILS AND MATERIALS FINAL PROJECT
PLANS, DETAILS AND MATERIALS FINAL PROJECT
Monica Badia Marin
Buildings: a huge potential for energy savings in France
Buildings: a huge potential for energy savings in France Buildings: a huge potential for energy savings in France
Buildings: a huge potential for energy savings in France
St辿fan Le D短
REMOURBAN Information package n2 - District Retrofitting
REMOURBAN Information package n2 - District RetrofittingREMOURBAN Information package n2 - District Retrofitting
REMOURBAN Information package n2 - District Retrofitting
REMOURBAN
MicroVent: Energy-Efficient, Fa巽ade-Integrated Ventilation Systems with Heat ...
MicroVent: Energy-Efficient, Fa巽ade-Integrated Ventilation Systems with Heat ...MicroVent: Energy-Efficient, Fa巽ade-Integrated Ventilation Systems with Heat ...
MicroVent: Energy-Efficient, Fa巽ade-Integrated Ventilation Systems with Heat ...
RINNO
04cB3 study PLEA2004.pdf
04cB3 study PLEA2004.pdf04cB3 study PLEA2004.pdf
04cB3 study PLEA2004.pdf
webtierra
Deep Retrofit: The Dun Laoghaire-Rathdown Experience
Deep Retrofit: The Dun Laoghaire-Rathdown ExperienceDeep Retrofit: The Dun Laoghaire-Rathdown Experience
Deep Retrofit: The Dun Laoghaire-Rathdown Experience
SustainableEnergyAut
Poland`s experience with renovation financing | ukasz Polakowski
Poland`s experience with renovation financing | ukasz Polakowski Poland`s experience with renovation financing | ukasz Polakowski
Poland`s experience with renovation financing | ukasz Polakowski
Ekonomikas ministrija/ Dz朝vo siltk

Zaharna Fabrika pilot

  • 1. EI-Education Best practice example from Bulgaria Zaharna Fabrika Bulgaria 50% energy saving Improved and enlarged building Flexible financing schemes allow owners with low incomes to realize the refurbishment of their dwellings Project data Location, address: Block 10, district Zaharna Fabrika, Sofia Region: Western Bulgaria Surroundings: City Climate: Mild continental Heating degree days: 2900 in the heating season (mid of October - mid of April) Year of construction and renovation: 1947 (constructed); 2004 (renovated) Typology: Multi-dwelling building No of dwellings: 13 Total floor area: 1100m 2 living area before renovation; 1160 m 2 living area after renovation Owner: Owner occupied flats Renovation design team: Arch Plus Realization team: Renovation financed by: Credit from Objectives and results The objectives of this project were to carry out a renovation and further maintenance of multi-dwelling building which flats are owned by the inhabitants, overcoming the problems that arise from the low incomes of the owners and their different interests. The renovation should also lead to a lower energy consumption and improvement of the comfort of the flats. The project includes also a whole reconstruction of the roof. On the last floor (attic) there are two common premises that were transformed in small flats. The rent of these new flats will help the reimbursement of the loan. The project is initiated and realised by Bulgarian Housing Association in partnership with Housing Association De Nieuwe Unie, Rotterdam and Housing Association Woondrecht, Dordrecht. Fig. 1 Building before renovation Renovation concept Key renovation features Thermal insulation of external walls; Whole reconstruction of the attic; Water proofing and thermal insulation of roof; New double glazed windows with PVC frames; Thermal insulation of basement ceiling; Improvement of heating system. Fig. 2 New attic
  • 2. Best practice example from Bulgaria State-of-the-art Before renovation After renovation Constructions [U-values: W/m 2 K] Constructions [U-values: W/m 2 K] Roof New insulated roof 0,5 Non-insulated basement Insulation of basement ceiling 0.52 Non-insulated external brick walls Insulation of external brick walls 0,52 Double glazed wooden window s 2,9 New double glazed windows with PVC frames Installations Installations Heat substation supplied by district heating Improvement of the heating system (balance, insulation of pipes) Energy saving and monitoring Energy consumption before renovation: KWh/m 2 per year: heating 162.6 hot water 30.5 integrated characteristic 194.7 Energy consumption after renovation: KWh/m 2 per year: heating 60.2 hot water 43.8 integrated characteristic 105.6 Percentage energy saving 46% After the renovation the building get certificate A. Integrated characteristic required for certificate A 121.7 KWh/m2 per year. Fig.3 Refurbished building Additional information For the realization of the project was registered the first association of owners in Bulgaria; The project is financed through a loan from banks from Nederland as they offered lower interest rates, the loan is for 20 years; The monthly payment of the loan is 700 BGN (approx. 350 Euros), but half of this amount is ensured by the rent of the two new flats in the attic; The project can easily be replicated in the neighbouring buildings, as they are the same; An energy monitoring was done before and after the refurbishment; The inhabitants are satisfied by the results, the renovation lengthen the life span of the building with 40 years, the insulation of the external envelope lead to a better comfort and energy saving. Lessons learned and conclusions For the realization of refurbishment of a multi-dwelling building it is necessary to involve all owners and to organise them in an association; The costs of refurbishment can be, at least partially, covered by an extension of the building. Most of the buildings could be extended with an additional floor; The financing institutions should be flexible when giving loans for such projects, most of the owners are with low or medium incomes and the banks should take this into account.