ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Causeway Rd and Semaphore Rd
Shared Use Paths
Presented by Zak Valiff
City of Port Adelaide Enfield
19 October 2018
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
AGENDA
? Council¡¯s Strategic Bicycle Plan 2015-2020
? The Port CBD Cycling Network
? The Port Hike and Bike Loop Path
? ¡®The Missing Link¡¯
? Cedar Woods Development
? Semaphore Rd Shared Path ¨C Concept Design
? Causeway Rd Shared Path ¨C Concept Design
? Video
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Strategic Bike Plan 2015-2020
? In 2013 we applied for State Bike Funding from DPTI
? Developed the Bike Plan in 2014/15
? InfraPlan
? Port BUG
? City of PAE
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Port CBD Cycling Network
? Short-Medium term actions
? ¡®The Missing Link¡¯
? Causeway Rd Shared Use Path
? Semaphore Rd Shared Use Path
? Identified as a Medium-High Priority
? Port Hike & Bike Loop Path ¨C Inner
Harbour
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Cedar Woods Development
? $160 million development
? 500 new homes
? City of PAE want a minimum 17.5m
¡®vista¡¯ to be able to see Hart¡¯s Mill
from Semaphore Rd
? At State Commission Assessment
Panel (SCAP)
? Early construction works to begin
before the end of the year
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Cedar Woods
Development
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Semaphore Road
? Install a 3m wide concrete path
? Relocation of bus stop 110m west
? Widen and realign refuge in Semaphore Rd
median
? Widen refuges in islands Fletcher Rd
? Provide ¡®cut-through¡¯ to Heath St
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Causeway Road
? Construct a 2.5m - 3m wide path to
match existing path on Semaphore Rd
? DDA compliant ramps and DPTI
standard handrails to match path
widths
? Relocate road train route sign behind
post and rail fence
Heavy Vehicle Route Sign
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Causeway Road
? Construct a new refuge at Hart St ¨C Ban right
turn movements into Hart St from Causeway
Rd
? Install new light pole for the proposed refuge
? Maintain minimum lane widths of 5m at
refuge location
Hart St & Causeway Rd
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Causeway Road
? Renewal of the existing non-standard
shared path
? Install 3m-3.5m wide bitumen and
paved paths
? Extend carpark into old bus turnaround.
Old Bus Turnaround at Ethelton Station
www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Video:

More Related Content

Zak Valiff - Causeway Road and Semaphore Road Shared Use Paths

  • 1. www.cityofpae.sa.gov.auFollow us on @CityofPAE Causeway Rd and Semaphore Rd Shared Use Paths Presented by Zak Valiff City of Port Adelaide Enfield 19 October 2018 Closing the Missing Link ¨C The Port Hike and Bike Loop Path
  • 2. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link ¨C The Port Hike and Bike Loop Path AGENDA ? Council¡¯s Strategic Bicycle Plan 2015-2020 ? The Port CBD Cycling Network ? The Port Hike and Bike Loop Path ? ¡®The Missing Link¡¯ ? Cedar Woods Development ? Semaphore Rd Shared Path ¨C Concept Design ? Causeway Rd Shared Path ¨C Concept Design ? Video
  • 3. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link ¨C The Port Hike and Bike Loop Path Strategic Bike Plan 2015-2020 ? In 2013 we applied for State Bike Funding from DPTI ? Developed the Bike Plan in 2014/15 ? InfraPlan ? Port BUG ? City of PAE
  • 4. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link ¨C The Port Hike and Bike Loop Path Port CBD Cycling Network ? Short-Medium term actions ? ¡®The Missing Link¡¯ ? Causeway Rd Shared Use Path ? Semaphore Rd Shared Use Path ? Identified as a Medium-High Priority ? Port Hike & Bike Loop Path ¨C Inner Harbour
  • 5. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link ¨C The Port Hike and Bike Loop Path Cedar Woods Development ? $160 million development ? 500 new homes ? City of PAE want a minimum 17.5m ¡®vista¡¯ to be able to see Hart¡¯s Mill from Semaphore Rd ? At State Commission Assessment Panel (SCAP) ? Early construction works to begin before the end of the year
  • 6. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link ¨C The Port Hike and Bike Loop Path Cedar Woods Development
  • 7. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link ¨C The Port Hike and Bike Loop Path Semaphore Road ? Install a 3m wide concrete path ? Relocation of bus stop 110m west ? Widen and realign refuge in Semaphore Rd median ? Widen refuges in islands Fletcher Rd ? Provide ¡®cut-through¡¯ to Heath St
  • 8. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link ¨C The Port Hike and Bike Loop Path Causeway Road ? Construct a 2.5m - 3m wide path to match existing path on Semaphore Rd ? DDA compliant ramps and DPTI standard handrails to match path widths ? Relocate road train route sign behind post and rail fence Heavy Vehicle Route Sign
  • 9. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link ¨C The Port Hike and Bike Loop Path Causeway Road ? Construct a new refuge at Hart St ¨C Ban right turn movements into Hart St from Causeway Rd ? Install new light pole for the proposed refuge ? Maintain minimum lane widths of 5m at refuge location Hart St & Causeway Rd
  • 10. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link ¨C The Port Hike and Bike Loop Path Causeway Road ? Renewal of the existing non-standard shared path ? Install 3m-3.5m wide bitumen and paved paths ? Extend carpark into old bus turnaround. Old Bus Turnaround at Ethelton Station
  • 11. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link ¨C The Port Hike and Bike Loop Path Video: