Zak Valiff from the City of Port Adelaide Enfield presented plans to close the missing link in the Port Hike and Bike Loop Path. This would connect shared use paths along Causeway Rd and Semaphore Rd. The presentation discussed the council's bike plan, proposed designs for paths along each road, and how a new development could provide the missing link. Concept designs showed widening paths and refuges to improve safety.
1 of 11
Download to read offline
More Related Content
Zak Valiff - Causeway Road and Semaphore Road Shared Use Paths
1. www.cityofpae.sa.gov.auFollow us on @CityofPAE
Causeway Rd and Semaphore Rd
Shared Use Paths
Presented by Zak Valiff
City of Port Adelaide Enfield
19 October 2018
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
2. www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
AGENDA
? Council¡¯s Strategic Bicycle Plan 2015-2020
? The Port CBD Cycling Network
? The Port Hike and Bike Loop Path
? ¡®The Missing Link¡¯
? Cedar Woods Development
? Semaphore Rd Shared Path ¨C Concept Design
? Causeway Rd Shared Path ¨C Concept Design
? Video
3. www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Strategic Bike Plan 2015-2020
? In 2013 we applied for State Bike Funding from DPTI
? Developed the Bike Plan in 2014/15
? InfraPlan
? Port BUG
? City of PAE
4. www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Port CBD Cycling Network
? Short-Medium term actions
? ¡®The Missing Link¡¯
? Causeway Rd Shared Use Path
? Semaphore Rd Shared Use Path
? Identified as a Medium-High Priority
? Port Hike & Bike Loop Path ¨C Inner
Harbour
5. www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Cedar Woods Development
? $160 million development
? 500 new homes
? City of PAE want a minimum 17.5m
¡®vista¡¯ to be able to see Hart¡¯s Mill
from Semaphore Rd
? At State Commission Assessment
Panel (SCAP)
? Early construction works to begin
before the end of the year
7. www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Semaphore Road
? Install a 3m wide concrete path
? Relocation of bus stop 110m west
? Widen and realign refuge in Semaphore Rd
median
? Widen refuges in islands Fletcher Rd
? Provide ¡®cut-through¡¯ to Heath St
8. www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Causeway Road
? Construct a 2.5m - 3m wide path to
match existing path on Semaphore Rd
? DDA compliant ramps and DPTI
standard handrails to match path
widths
? Relocate road train route sign behind
post and rail fence
Heavy Vehicle Route Sign
9. www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Causeway Road
? Construct a new refuge at Hart St ¨C Ban right
turn movements into Hart St from Causeway
Rd
? Install new light pole for the proposed refuge
? Maintain minimum lane widths of 5m at
refuge location
Hart St & Causeway Rd
10. www.cityofpae.sa.gov.auFollow us on @CityofPAE
Closing the Missing Link ¨C The Port
Hike and Bike Loop Path
Causeway Road
? Renewal of the existing non-standard
shared path
? Install 3m-3.5m wide bitumen and
paved paths
? Extend carpark into old bus turnaround.
Old Bus Turnaround at Ethelton Station