Having more than ten (10) years of experience in piping construction completion for Subsea, Oil & Gas and Shipbuilding industry.
Following is the scope of work includes the codes, standards and rules are used:
- Factory Acceptance Test (FAT) for Subsea Pipeline System, Tie-in Spools and Spool Jumper as per DNV-OS-F101, ASME B31.4 & ASME B31.8 – Current.
- Factory Acceptance Test (FAT) for Aker Connectors (HCS/VCS) Porch-Termination & Pressure Caps (IB/OB, Temp/Permanent) as per Aker’s OMM – Current.
- Factory Acceptance Test (FAT) for GE Connectors (HCCS) Porch-Termination & Pressure Caps as per GE’s OMM – Current.
- Factory Acceptance Test (FAT) for Subsea Valves (Petrolvalves,
We’ve updated our privacy policy so that we are compliant with changing global privacy regulations and to provide you with insight into the limited ways in which we use your data.
You can read the details below. By accepting, you agree to the updated privacy policy.