Recent PROJECTS
02
PROJECT: Debenhams
Milton Keynes
Project Value 贈400k
A store with approximately 104,000sq ft of retail space spread
over three floors; lower ground, ground and first floor. The main
plant deck serving all of these areas is located on car park levels
1 & 2.
The project comprised of replacing the 9 x 140kw R22 refrigerant
heat pumps that served 9 x AHUs. The AHUs supplied the ma-
jority of the existing air conditioning and comfort cooling systems
that served the store.
We carried out all associated works such as sprinkler modification
and any necessary building works.
The contract was on a design/build basis and we were responsible
for liaising, when necessary, with the store management, statutory
parties and landlords representatives to ensure all necessary
approvals were in place to carry out the works.
All works met with the manufactures technical stipulations.
Overall cooling load to front of house sales areas is no less than
the minimum loading of 135w/m2 with the public restaurant areas
being considered in the range of 175w/m2 to 200w/m2. A full,
detailed design summary was submitted covering all areas for
consideration.
As the heat pumps, which contained the R22 refrigerant, sat on
proprietary steelwork supports on car park level 2 (in a dedicated
Debenhams plant zone) the heat pumps were craned off the
building and new support steels were installed to take the new
inverter Toshiba condenser units.
The AHUs were in relatively good condition and were overhauled
accordingly as part of the proposed scope of works.
These works comprised of:
	 Removing the existing 400Kg R22 DX coils and replacing
them with new R410a bespoke DX coils.
	 Deep cleaning and repainting of the main frame work.
	 Replacing belts, filters & locking nuts.
	 Replacing inverter drives.
	 Bearing kits for the fan motors/blades.
	 The BEMS controls were updated with local controllers being
installed within the plant room area, as well as a new Toshiba
central controller being installed with the store maintenance
office.
	 All power wiring was renewed/upgraded as necessary.
	 The AHUs were rebalanced and handed over all ahead of
schedule.
Schedule: 12 Week Project
Project completed: 8 weeks
SIMON REECE Store Manager
Having major works completed during a busy trading
period is always a concern.
Steve and the team at Protec not only controlled the
project and kept us fully informed during the regular
review meetings, and they exceed all timescales by
delivering 3 weeks early.
Post-installation communication was excellent with
Steve visiting regularly to maintain contact.
An excellent job, well done!
Thank You
03
PROJECT: Debenhams
Lincoln
Project Value 贈350K
The project involved replacing the existing R22 refrigerant system
used in the majority of the air conditioning and cooling systems
which served the store.
The store is comprised of approximately 75,000 sq ft of retail
space, spread over three floors; ground, first and second, with the
main plant deck on the second floor roof level.
We were required to replace 4 x 350kw packaged AHUs and
back-of-house R22 VRF & split cassettes.
We performed the duties of principal contractor for the whole R22
replacement project, which included sprinkler modifications and
all necessary other building work. We were also responsible for
liaising, where necessary, with store management, all statutory
parties and landlords representatives to ensure all necessary
approvals to work were obtained accordingly.
There were a 4 packaged units located on the main deck second
floor roof level and these serve the retail sales floor zones. Due
to location of the AHUs, an early morning road closure of Lincoln
High Street had to be carried out. Once we had positioned
Europes largest mobile crane, it lifted the 3.5 ton AHUs weight to
a height of 65m. We also had to organise 7 articulated lorries to
be brought to the city centre to dispose of the existing units and
bring in the new equipment.
The existing units were approximately 17 years old and extreme
care had to be taken while removing the AHUs, making sure
support straps were positioned correctly, allowing the unit to be
lifted off of the existing steel support without damaging the crane
and the clients property. All work had to be exercised within a
10hr time period. The tolerances worked to whilst carrying out
these works were less than 100mm.
All relevant control circuits and electrical power wiring were
renewed/upgraded as necessary. A re-balance of our air systems
was carried out on all AHU systems.
Cleaning of duct distribution systems serving the sales floor levels
was completed out of hours.
There was a total of 15 systems located on the roof plant deck.
They all utilised either R410A or R22 refrigerant systems and
served predominantly the back-of-house arears.
Schedule: 10 Week Project
Project completed: 6 weeks
PAUL WADSWORTH
Technical Director
All the equipment was supplied by Huston (UK) Ltd. The
installation contact for all this work was awarded to Protec
Services Ltd against stiff commercial opposition.
Protec then proceeded to work closely with Huston (UK) to
ensure that all the equipment was supplied and install to the
specification, without disruption to the store, to time scale and
to the rigorous quality demanded.
The installation was carried out very professionally extremely
swiftly and to a very high standard of workmanship by
Protecs team of installation engineers, led by Paul Osborn.
The crane lift was carried out in the early hours of a Sunday
morning by one of Europes largest mobile tower cranes, the
road closure was kept to a minimum; this was down to Steve
Macdonalds meticulous logistical planning.
We look forward to working with Protec on future projects
PROJECT: Sutherland
Avenue (Residential)
Installation of comfort cooling into residential refurbishment.
Loveday Construction appointed Protec Services to deliver a
design and installation within their rigid time frame.
The project comprised of installing concealed ducted units into
bespoke built areas whilst ensuring operating capacities were still
achieved.
Installation of Daikin heat pumps equipment into residential
development.
15kw heat pump installed.
Ground floor
2 x concealed ducted nits into trimmed joist and supply air
discharging into front room areas.
First floor
3 x concealed units installed into changing rooms and master
bedroom.
Units installed into cupboard makeup and only discharge grilles
visible.
Second floor
2 x concealed ducted units hidden within the roof makeup
supplying top bedrooms.
All units integrated into house controls.
04
05
PROJECT: Upper Belgrave
Street (Residential)
Installation and commissioning of 1 x 30 kw Unico system into
high end flat conversion.
Appointed Air conditioning and controls contractor.
Dale contracts and Ganter appointed us to supply them with a
fully integrated heating cooling and heat recovery solution to this
highly specified show flat.
By using existing American kit and European condensers a high
COP (coefficient of performance) was achieved on site.
System utilised both heat pump and hot water supplies to achieve
optimum space temperatures.
Working with an international interior design team aesthetics are of
very high importance, while still ensuring operational specifics are
attained.
PROJECT: 47 Homefield
Road (Residential)
Protec were the main contractors for this refurbishment
installation.
The residence had only recently been completed but the clients
were unhappy with the constant high temperatures on the upper
floors.
Protec were appointed to rectify this with minimal disturbance or
damage to existing decorations and ceilings.
Work was carried out to install five wall mounts in all upstairs
bedrooms and conceale all pipe and drain routes, including full
redecoration of any building works.
All necessary electrical installation certificates were issued and the
base builder was employed to check installation and guarantees.
Project Value: 贈150k
This project involved replacing the 2 x Toshiba 407C VRFs and 2 x
300kw R22 heat pumps which served the AHUs that supplied the
sales floor arears within Boots Oracle, Reading.
We were required to decommission the existing Toshiba VRF
system based within the 3rd floor roof plant area, decommission
and remove heat pumps that served the ground and first floor
sales floor. Install 17 new Toshiba heat pumps to AHUs.
We performed the duties of principal contractor for the whole of
the replacement project which included associated works such
as builders work in connection with the installation and all BMS
works.
We were also responsible for liaising, where necessary, with
the store management and all statutory parties, landlords
representatives to ensure all necessary approvals to work were
obtained accordingly.
Heat pumps and Coils were decommissioned and broken down
so they could be manually handed off the roof due to crane
restrictions. Bespoke DX coils were manually lifted to roof plant
room and installed.
Local controls were installed and all power wiring was renewed/
upgraded as necessary.
PROJECT: Boots
Reading
06
SPIROS K SAVVIDES BSC
Senior Associate Director
at Cudd Bentley
Having worked with Steve and his team for
many years now they have always delivered
a first class job.
t. 0845 8626662
e: info@protecservicesuk.com
Unit 48, Basepoint Business Centre,
Metcalf Way, Crawley, West Sussex RH11 7XX
WWW.PROTECSERVICESUK.COM

More Related Content

What's hot (20)

PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
Jim Benge
Terry CV June 2015
Terry CV June 2015Terry CV June 2015
Terry CV June 2015
Terry Harvey
Linkedin-Doc
Linkedin-DocLinkedin-Doc
Linkedin-Doc
Richard Larrabee
Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
Harshad Patel, P.E.
russell resume
russell resumerussell resume
russell resume
Russell Antoniuk
Khan Nasir1-6-16
Khan Nasir1-6-16Khan Nasir1-6-16
Khan Nasir1-6-16
Nasir Khan
1333 Gum Final
1333 Gum Final1333 Gum Final
1333 Gum Final
Vaughn T. Rex, MBA
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
McKenney's Inc
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
Roman Rozek
Resume copy10:20:15 copy 5* copy 2
Resume copy10:20:15 copy 5* copy 2Resume copy10:20:15 copy 5* copy 2
Resume copy10:20:15 copy 5* copy 2
Tim Swain
Service report
Service reportService report
Service report
yenweizheng
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inRenovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
Anthony Boyko
Take a look at some of our recent projects.
Take a look at some of our recent projects. Take a look at some of our recent projects.
Take a look at some of our recent projects.
Tony Mantle
E n e r g o Cement Plant - Projects
E n e r g o Cement Plant - ProjectsE n e r g o Cement Plant - Projects
E n e r g o Cement Plant - Projects
Daniel DRAGOSIN
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
Ted Beery
POOLEY RESUME short
POOLEY RESUME shortPOOLEY RESUME short
POOLEY RESUME short
Duane Pooley
Designers Connect Presentation May 14th 2013
Designers Connect Presentation May 14th 2013Designers Connect Presentation May 14th 2013
Designers Connect Presentation May 14th 2013
tboyko
S. Bould CV
S. Bould CV S. Bould CV
S. Bould CV
Shaun Bould
4. Brochure M&R Towers
4. Brochure M&R Towers4. Brochure M&R Towers
4. Brochure M&R Towers
Matthew Warr
Luxury Meets Systems Expertise
Luxury Meets Systems ExpertiseLuxury Meets Systems Expertise
Luxury Meets Systems Expertise
McKenney's Inc
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
Jim Benge
Terry CV June 2015
Terry CV June 2015Terry CV June 2015
Terry CV June 2015
Terry Harvey
Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
Harshad Patel, P.E.
Khan Nasir1-6-16
Khan Nasir1-6-16Khan Nasir1-6-16
Khan Nasir1-6-16
Nasir Khan
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
McKenney's Inc
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
Roman Rozek
Resume copy10:20:15 copy 5* copy 2
Resume copy10:20:15 copy 5* copy 2Resume copy10:20:15 copy 5* copy 2
Resume copy10:20:15 copy 5* copy 2
Tim Swain
Service report
Service reportService report
Service report
yenweizheng
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inRenovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
Anthony Boyko
Take a look at some of our recent projects.
Take a look at some of our recent projects. Take a look at some of our recent projects.
Take a look at some of our recent projects.
Tony Mantle
E n e r g o Cement Plant - Projects
E n e r g o Cement Plant - ProjectsE n e r g o Cement Plant - Projects
E n e r g o Cement Plant - Projects
Daniel DRAGOSIN
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
Ted Beery
POOLEY RESUME short
POOLEY RESUME shortPOOLEY RESUME short
POOLEY RESUME short
Duane Pooley
Designers Connect Presentation May 14th 2013
Designers Connect Presentation May 14th 2013Designers Connect Presentation May 14th 2013
Designers Connect Presentation May 14th 2013
tboyko
4. Brochure M&R Towers
4. Brochure M&R Towers4. Brochure M&R Towers
4. Brochure M&R Towers
Matthew Warr
Luxury Meets Systems Expertise
Luxury Meets Systems ExpertiseLuxury Meets Systems Expertise
Luxury Meets Systems Expertise
McKenney's Inc

Viewers also liked (14)

SoftwareSoftware
Software
Junior Estevez
BlogBlog
Blog
sofiiabustos
舒从舒仆仆亠 仗仍仂舒亟亳 丐丶 束舒仆舒于舒仍損
舒从舒仆仆亠 仗仍仂舒亟亳 丐丶 束舒仆舒于舒仍損舒从舒仆仆亠 仗仍仂舒亟亳 丐丶 束舒仆舒于舒仍損
舒从舒仆仆亠 仗仍仂舒亟亳 丐丶 束舒仆舒于舒仍損
eyesupreme
omiemartizon portfolio as stylist-PD
omiemartizon portfolio as stylist-PD omiemartizon portfolio as stylist-PD
omiemartizon portfolio as stylist-PD
Omie Herrera Martizon
TwitterTwitter
Twitter
nancygeraldinemedinalizarazo
To 留亮留 凌 凌了凌 劉凌, 裡凌了旅留亮凌溜
To 留亮留 凌 凌了凌 劉凌, 裡凌了旅留亮凌溜To 留亮留 凌 凌了凌 劉凌, 裡凌了旅留亮凌溜
To 留亮留 凌 凌了凌 劉凌, 裡凌了旅留亮凌溜
Nikiforakg
Trifecta IA/ID P.SILS redesign
Trifecta IA/ID P.SILS redesignTrifecta IA/ID P.SILS redesign
Trifecta IA/ID P.SILS redesign
gueste15eb3
ICI Magazine
ICI MagazineICI Magazine
ICI Magazine
ashleyyeap
What is communication
What is communicationWhat is communication
What is communication
Samia Hassan
BS IEQ presentation-slides (1)
BS IEQ presentation-slides (1)BS IEQ presentation-slides (1)
BS IEQ presentation-slides (1)
ashleyyeap
Um culto bem preparadoUm culto bem preparado
Um culto bem preparado
Estev達o Ribeiro
Enfermedades de origen h鱈dricoEnfermedades de origen h鱈drico
Enfermedades de origen h鱈drico
Pedro Gonz叩lez Rodr鱈guez
Europass-CV-20141121-GonzalezMotos-EN
Europass-CV-20141121-GonzalezMotos-ENEuropass-CV-20141121-GonzalezMotos-EN
Europass-CV-20141121-GonzalezMotos-EN
Seraf鱈n Gonz叩lez Motos
Filtration (1)
Filtration (1)Filtration (1)
Filtration (1)
mukul chandel
SoftwareSoftware
Software
Junior Estevez
舒从舒仆仆亠 仗仍仂舒亟亳 丐丶 束舒仆舒于舒仍損
舒从舒仆仆亠 仗仍仂舒亟亳 丐丶 束舒仆舒于舒仍損舒从舒仆仆亠 仗仍仂舒亟亳 丐丶 束舒仆舒于舒仍損
舒从舒仆仆亠 仗仍仂舒亟亳 丐丶 束舒仆舒于舒仍損
eyesupreme
omiemartizon portfolio as stylist-PD
omiemartizon portfolio as stylist-PD omiemartizon portfolio as stylist-PD
omiemartizon portfolio as stylist-PD
Omie Herrera Martizon
To 留亮留 凌 凌了凌 劉凌, 裡凌了旅留亮凌溜
To 留亮留 凌 凌了凌 劉凌, 裡凌了旅留亮凌溜To 留亮留 凌 凌了凌 劉凌, 裡凌了旅留亮凌溜
To 留亮留 凌 凌了凌 劉凌, 裡凌了旅留亮凌溜
Nikiforakg
Trifecta IA/ID P.SILS redesign
Trifecta IA/ID P.SILS redesignTrifecta IA/ID P.SILS redesign
Trifecta IA/ID P.SILS redesign
gueste15eb3
ICI Magazine
ICI MagazineICI Magazine
ICI Magazine
ashleyyeap
What is communication
What is communicationWhat is communication
What is communication
Samia Hassan
BS IEQ presentation-slides (1)
BS IEQ presentation-slides (1)BS IEQ presentation-slides (1)
BS IEQ presentation-slides (1)
ashleyyeap
Um culto bem preparadoUm culto bem preparado
Um culto bem preparado
Estev達o Ribeiro
Enfermedades de origen h鱈dricoEnfermedades de origen h鱈drico
Enfermedades de origen h鱈drico
Pedro Gonz叩lez Rodr鱈guez

Similar to ProTec Recent Projects Brochure (20)

1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report
Paul Warrington
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CV
Dave Arkell
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
Eamon Hannaway
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between Systems
Victor Ashkenazy
High rise archive research
High rise archive researchHigh rise archive research
High rise archive research
denverdieza
Mechanical Services Design Presentation.pptx
Mechanical Services Design Presentation.pptxMechanical Services Design Presentation.pptx
Mechanical Services Design Presentation.pptx
JOSEPHAPPIAH18
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
karl davis
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
john rhynold
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
Chris Humphries
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
Lwj Welson
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
Nayan Rao
ARM-Buildings-Brochure.pdf 20022 trong xay d動ng
ARM-Buildings-Brochure.pdf 20022 trong xay d動ngARM-Buildings-Brochure.pdf 20022 trong xay d動ng
ARM-Buildings-Brochure.pdf 20022 trong xay d動ng
ThoaiNguyen54
william-second-revision (3)
william-second-revision (3)william-second-revision (3)
william-second-revision (3)
william paul casey
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
Steve Bailey
Please click here to view the Cranmer Court Presentation
Please click here to view the Cranmer Court Presentation Please click here to view the Cranmer Court Presentation
Please click here to view the Cranmer Court Presentation
vsproul
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial works
grahamelanders
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
Grace Henry
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
McKenney's Inc
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
Arafat Akash
SERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & LessonsSERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & Lessons
Tipperary Energy Agency
1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report
Paul Warrington
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CV
Dave Arkell
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
Eamon Hannaway
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between Systems
Victor Ashkenazy
High rise archive research
High rise archive researchHigh rise archive research
High rise archive research
denverdieza
Mechanical Services Design Presentation.pptx
Mechanical Services Design Presentation.pptxMechanical Services Design Presentation.pptx
Mechanical Services Design Presentation.pptx
JOSEPHAPPIAH18
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
karl davis
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
john rhynold
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
Chris Humphries
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
Lwj Welson
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
Nayan Rao
ARM-Buildings-Brochure.pdf 20022 trong xay d動ng
ARM-Buildings-Brochure.pdf 20022 trong xay d動ngARM-Buildings-Brochure.pdf 20022 trong xay d動ng
ARM-Buildings-Brochure.pdf 20022 trong xay d動ng
ThoaiNguyen54
william-second-revision (3)
william-second-revision (3)william-second-revision (3)
william-second-revision (3)
william paul casey
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
Steve Bailey
Please click here to view the Cranmer Court Presentation
Please click here to view the Cranmer Court Presentation Please click here to view the Cranmer Court Presentation
Please click here to view the Cranmer Court Presentation
vsproul
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial works
grahamelanders
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
Grace Henry
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
McKenney's Inc
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
Arafat Akash
SERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & LessonsSERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & Lessons
Tipperary Energy Agency

ProTec Recent Projects Brochure

  • 2. 02 PROJECT: Debenhams Milton Keynes Project Value 贈400k A store with approximately 104,000sq ft of retail space spread over three floors; lower ground, ground and first floor. The main plant deck serving all of these areas is located on car park levels 1 & 2. The project comprised of replacing the 9 x 140kw R22 refrigerant heat pumps that served 9 x AHUs. The AHUs supplied the ma- jority of the existing air conditioning and comfort cooling systems that served the store. We carried out all associated works such as sprinkler modification and any necessary building works. The contract was on a design/build basis and we were responsible for liaising, when necessary, with the store management, statutory parties and landlords representatives to ensure all necessary approvals were in place to carry out the works. All works met with the manufactures technical stipulations. Overall cooling load to front of house sales areas is no less than the minimum loading of 135w/m2 with the public restaurant areas being considered in the range of 175w/m2 to 200w/m2. A full, detailed design summary was submitted covering all areas for consideration. As the heat pumps, which contained the R22 refrigerant, sat on proprietary steelwork supports on car park level 2 (in a dedicated Debenhams plant zone) the heat pumps were craned off the building and new support steels were installed to take the new inverter Toshiba condenser units. The AHUs were in relatively good condition and were overhauled accordingly as part of the proposed scope of works. These works comprised of: Removing the existing 400Kg R22 DX coils and replacing them with new R410a bespoke DX coils. Deep cleaning and repainting of the main frame work. Replacing belts, filters & locking nuts. Replacing inverter drives. Bearing kits for the fan motors/blades. The BEMS controls were updated with local controllers being installed within the plant room area, as well as a new Toshiba central controller being installed with the store maintenance office. All power wiring was renewed/upgraded as necessary. The AHUs were rebalanced and handed over all ahead of schedule. Schedule: 12 Week Project Project completed: 8 weeks SIMON REECE Store Manager Having major works completed during a busy trading period is always a concern. Steve and the team at Protec not only controlled the project and kept us fully informed during the regular review meetings, and they exceed all timescales by delivering 3 weeks early. Post-installation communication was excellent with Steve visiting regularly to maintain contact. An excellent job, well done! Thank You
  • 3. 03 PROJECT: Debenhams Lincoln Project Value 贈350K The project involved replacing the existing R22 refrigerant system used in the majority of the air conditioning and cooling systems which served the store. The store is comprised of approximately 75,000 sq ft of retail space, spread over three floors; ground, first and second, with the main plant deck on the second floor roof level. We were required to replace 4 x 350kw packaged AHUs and back-of-house R22 VRF & split cassettes. We performed the duties of principal contractor for the whole R22 replacement project, which included sprinkler modifications and all necessary other building work. We were also responsible for liaising, where necessary, with store management, all statutory parties and landlords representatives to ensure all necessary approvals to work were obtained accordingly. There were a 4 packaged units located on the main deck second floor roof level and these serve the retail sales floor zones. Due to location of the AHUs, an early morning road closure of Lincoln High Street had to be carried out. Once we had positioned Europes largest mobile crane, it lifted the 3.5 ton AHUs weight to a height of 65m. We also had to organise 7 articulated lorries to be brought to the city centre to dispose of the existing units and bring in the new equipment. The existing units were approximately 17 years old and extreme care had to be taken while removing the AHUs, making sure support straps were positioned correctly, allowing the unit to be lifted off of the existing steel support without damaging the crane and the clients property. All work had to be exercised within a 10hr time period. The tolerances worked to whilst carrying out these works were less than 100mm. All relevant control circuits and electrical power wiring were renewed/upgraded as necessary. A re-balance of our air systems was carried out on all AHU systems. Cleaning of duct distribution systems serving the sales floor levels was completed out of hours. There was a total of 15 systems located on the roof plant deck. They all utilised either R410A or R22 refrigerant systems and served predominantly the back-of-house arears. Schedule: 10 Week Project Project completed: 6 weeks PAUL WADSWORTH Technical Director All the equipment was supplied by Huston (UK) Ltd. The installation contact for all this work was awarded to Protec Services Ltd against stiff commercial opposition. Protec then proceeded to work closely with Huston (UK) to ensure that all the equipment was supplied and install to the specification, without disruption to the store, to time scale and to the rigorous quality demanded. The installation was carried out very professionally extremely swiftly and to a very high standard of workmanship by Protecs team of installation engineers, led by Paul Osborn. The crane lift was carried out in the early hours of a Sunday morning by one of Europes largest mobile tower cranes, the road closure was kept to a minimum; this was down to Steve Macdonalds meticulous logistical planning. We look forward to working with Protec on future projects
  • 4. PROJECT: Sutherland Avenue (Residential) Installation of comfort cooling into residential refurbishment. Loveday Construction appointed Protec Services to deliver a design and installation within their rigid time frame. The project comprised of installing concealed ducted units into bespoke built areas whilst ensuring operating capacities were still achieved. Installation of Daikin heat pumps equipment into residential development. 15kw heat pump installed. Ground floor 2 x concealed ducted nits into trimmed joist and supply air discharging into front room areas. First floor 3 x concealed units installed into changing rooms and master bedroom. Units installed into cupboard makeup and only discharge grilles visible. Second floor 2 x concealed ducted units hidden within the roof makeup supplying top bedrooms. All units integrated into house controls. 04
  • 5. 05 PROJECT: Upper Belgrave Street (Residential) Installation and commissioning of 1 x 30 kw Unico system into high end flat conversion. Appointed Air conditioning and controls contractor. Dale contracts and Ganter appointed us to supply them with a fully integrated heating cooling and heat recovery solution to this highly specified show flat. By using existing American kit and European condensers a high COP (coefficient of performance) was achieved on site. System utilised both heat pump and hot water supplies to achieve optimum space temperatures. Working with an international interior design team aesthetics are of very high importance, while still ensuring operational specifics are attained. PROJECT: 47 Homefield Road (Residential) Protec were the main contractors for this refurbishment installation. The residence had only recently been completed but the clients were unhappy with the constant high temperatures on the upper floors. Protec were appointed to rectify this with minimal disturbance or damage to existing decorations and ceilings. Work was carried out to install five wall mounts in all upstairs bedrooms and conceale all pipe and drain routes, including full redecoration of any building works. All necessary electrical installation certificates were issued and the base builder was employed to check installation and guarantees.
  • 6. Project Value: 贈150k This project involved replacing the 2 x Toshiba 407C VRFs and 2 x 300kw R22 heat pumps which served the AHUs that supplied the sales floor arears within Boots Oracle, Reading. We were required to decommission the existing Toshiba VRF system based within the 3rd floor roof plant area, decommission and remove heat pumps that served the ground and first floor sales floor. Install 17 new Toshiba heat pumps to AHUs. We performed the duties of principal contractor for the whole of the replacement project which included associated works such as builders work in connection with the installation and all BMS works. We were also responsible for liaising, where necessary, with the store management and all statutory parties, landlords representatives to ensure all necessary approvals to work were obtained accordingly. Heat pumps and Coils were decommissioned and broken down so they could be manually handed off the roof due to crane restrictions. Bespoke DX coils were manually lifted to roof plant room and installed. Local controls were installed and all power wiring was renewed/ upgraded as necessary. PROJECT: Boots Reading 06 SPIROS K SAVVIDES BSC Senior Associate Director at Cudd Bentley Having worked with Steve and his team for many years now they have always delivered a first class job.