This document summarizes several recent projects completed by Protec Services. It describes projects replacing refrigeration and air conditioning systems at Debenhams stores in Milton Keynes and Lincoln, installing comfort cooling at residential developments, and replacing VRF and heat pump systems at a Boots store in Reading. The projects were completed on time or early and received positive feedback from customers praising Protec's work.
The document summarizes an HVAC and lighting refurbishment project for the Hi Bay Theatre conference facility at Portakabin's head office in York. The existing space had poor lighting, no air conditioning, and worn finishes. The project involved installing a new LED lighting system, air conditioning units, ceiling tiles, carpet, and redecorating the walls. Timelapse photos show the progression of the refurbishment. The completed project included 45 controllable LED panels, 3 spotlights, a zoned Daikin HVAC system, and refreshed finishes throughout the conference area and foyer.
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)Pieter Venter
油
Project Management South Africa (PMSA)
Experience:
Project Manager, The Project Bureau (Pty) Ltd, Johannesburg, 2008 to present
Site Agent, ABC Construction, Durban, 2002 to 2008
Quantity Surveyor, XYZ Quantity Surveyors, Durban, 1999 to 2002
Trainee Technician, DEF Consulting Engineers, Durban, 1998 to 1999
Key Skills:
Project Management of building construction projects from inception to completion
Contract administration and management of sub-contractors
Preparation of project programmes, budgets and cost control
Tender documentation preparation and evaluation
Liaison with clients, consultants, local authorities and contractors
Quality and health
The document contains photographs from various construction projects completed by Bill Keenen including:
- The 160,000 SF addition to Vista Ridge Mall and 180,000 SF department store built for Homart Development and May Company respectively.
- The 181 LF ballroom style cleanroom and interconnect corridor built for AMI Fab 10 microelectronics facility.
- The 45,000 SF 3 story HISUS A/O building including an 8,000 SF cleanroom.
- Construction progress photos of the HISUS U4 microelectronics facility showing the piers, shear walls, trusses and other structural elements being installed.
Mohamed Ahmed Abd El Razek is seeking a position utilizing his Bachelor's degree in mechanical engineering and 8 years of experience. His resume details education from Helwan University in Egypt and work experience in Saudi Arabia as a mechanical project engineer for industrial, commercial, and infrastructure projects. He has managed projects such as a fiberglass plant and high-rise building.
Rusty Adkins has over 40 years of experience in project management roles across refinery, petrochemical, and utility industries. He has managed projects up to $170 million as both project manager and department manager overseeing 65 project managers and engineers. His experience includes detailed design, procurement, construction management, and commissioning support for major process units, infrastructure upgrades, and regulatory compliance projects.
Edgar H. Humble II has over 25 years of experience in facilities engineering, project management, electrical systems, industrial automation, and mechanical engineering. He has managed buildings with over 250,000 square feet and 1400 employees, completing renovations totaling over $1.6 million. Humble has extensive hands-on experience installing, maintaining, and repairing industrial systems and equipment including PLCs, HVAC, electrical, and automation. He holds a BSME from North Carolina State University.
The document outlines contracts for a water drainage scheme in Waterford, Ireland. Contract 1 involves constructing sewer systems and pumping stations north of the River Suir, including rising mains under the river. Contract 2 involves constructing an interceptor sewer system and 4 pumping stations south of the river. Contract 5 involves designing, building, and operating a wastewater treatment plant to serve 190,600 people.
Jim Benge has overseen hundreds of industrial and commercial construction projects ranging from $7,000 to $700 million as a project manager, engineer, and construction manager. Some of the notable projects he oversaw include expansions of power plants, chemical plants, food processing facilities, and aluminum production facilities. He has extensive experience managing all aspects of complex construction projects from engineering, scheduling, installation, and start-up while minimizing disruptions to existing operations.
Terry Harvey has over 30 years of experience as a mechanical engineer and project supervisor in commercial and domestic installations. He has extensive skills in plumbing, piping, HVAC, and refrigeration systems. Some of his past roles include supervising multi-million pound mechanical system installations for Tate Modern Phase 2 expansion, British Airways' new flight training center, and various other commercial and residential projects in the UK and abroad. He is a skilled tradesman with expertise in managing teams, budgets, schedules, and ensuring work is done safely and to a high quality.
Richard J. Larrabee has over 40 years of experience in building maintenance and engineering. He has held roles such as Chief Engineer and Maintenance Superintendent for properties ranging from 50 unit apartment complexes to 800,000 square foot lab buildings. His experience includes managing HVAC, electrical, and other building systems, as well as supervising staff, implementing maintenance programs, and completing capital projects. He has extensive training in areas such as HVAC, building codes, asbestos handling, and construction.
Harshad Patel has over 33 years of experience in project management and process engineering. He has worked on a variety of projects in industries such as gas processing, petrochemicals, and specialty chemicals. Some of the key projects he led include installing hot boxes and HVAC units, replacing elevator doors, and designing pneumatic sample delivery and storage tank systems. He also created and updated plant drawings for a specialty chemical manufacturing facility.
Russell Antoniuk has over 35 years of experience as a plumber, pipefitter, and steamfitter in Alberta, Canada. He has worked on various oilsands extraction and upgrader projects, performing duties including pipe installation, equipment maintenance, and supervising crews. His skills include blueprint reading, project management, welding, and strong communication abilities. He holds certifications in confined space entry, fall protection, first aid, H2S safety, and polyethylene gas pipe joining.
Nasir Khan has over 30 years of experience in the design, construction, start-up and commissioning of fired heaters, boilers, flares and related equipment. He has worked on projects for refineries and chemical plants around the world, specializing in the design of steam methane reformers, fired heaters, boilers and NOx reduction systems. Mr. Khan holds engineering and safety certifications and is a member of several professional organizations related to mechanical engineering and the chemical industry.
The document outlines renovations completed on a 2 bedroom, 1.5 bath property located at 1333 Gum Street as part of an MDA-NRRP project. Renovations included repairs to plumbing and electrical systems, installation of flooring, lighting fixtures, appliances and closets/shelving. Before and after photos show the interior and exterior of the property both before and after the repairs were made to prepare the unit for Section #8 inspection and rental.
This document describes several construction projects managed by the author. It includes:
1) A $1.5M project at a Burlington Coat Factory facility to expand their conveyor system and add a mezzanine structure, requiring reinforcement of the building.
2) Renovations the author managed for various clients including a $7.5M renovation of an existing warehouse and a $9.3M expansion and renovation of a warehouse for Chewy.com.
3) Additional projects the author managed including parking expansions, new construction of warehouses, office renovations, and building restorations.
Timothy M. Swain has over 28 years of experience in all phases of construction, including project management, supervision, carpentry, and construction consulting. He has worked on both commercial and residential projects ranging from $750,000 to $5,000,000, including custom homes, apartments, pools, and public school renovations. His experience includes managing budgets, schedules, subcontractors, and all phases of construction from design to completion. He is skilled in areas such as seismic upgrades, infrastructure installation, and design-build projects.
This document provides information on building services systems for a domestic building, including the electrical supply system, water supply system, sewerage and sanitary system, and rainwater drainage system. It describes the key components of each system, relevant laws and regulations, and diagrams. The objectives of the project are to develop understanding of building services systems and apply appropriate systems to a design while meeting practical considerations. Upon completion, students will be able to identify information related to various building utility systems and propose suitable systems for specific building types.
Renovator's Presentation for Orderline Duplex Simplifed for linked-inAnthony Boyko
油
This presentation provides an overview of the process for renovating an existing single-family home to create a duplex in compliance with the building code. There are three major steps: 1) evaluating the building under Part 10 to determine if compensating construction is required, 2) if required, performing a Part 11 evaluation which involves classifying the building and determining the type and extent of renovations, and 3) identifying any reductions in performance and associated compensating construction needed. For the example home described, the renovation is considered extensive since new walls and floors are being installed, and compensating construction is needed to address the lack of fire separations between units.
Take a look at some of our recent projects. Tony Mantle
油
Axis is a family-owned property services company that has been operating for over 30 years. They provide a wide range of services including planned and reactive maintenance, refurbishments, fit-outs, and more across multiple sectors such as commercial, retail, heritage, public, education, and housing. Some of their recent clients include Lincoln's Inn, Royal Hospital Chelsea, Gray's Inn, and various public sector organizations. They have experience working on listed heritage buildings requiring specialist restoration and have worked with clients such as Credit Suisse for over 18 years.
This document discusses two cement plant projects completed by ENERGO SA:
1. A new production line and clinker storage facility including over 6,500 tons of steel structures.
2. Transportation and storage of 130,000 tons of clinker involving design and construction of a conveyor and roof for a 130,000 ton clinker silo consisting of over 3,400 steel elements.
ENERGO's success on cement industry projects is attributed to guaranteeing technical requirements and quality, just-in-time execution and delivery, and promptly addressing issues.
Ted Beery has over 20 years of experience in construction coordination, quality assurance, and safety inspection. He has worked as a construction coordinator, chief inspector, and QA/QC inspector on various civil, structural, and mechanical projects across industries. Beery has expertise in epoxy resins, construction documentation, inspections, and Microsoft Office software. He holds safety certificates from Texas and California and education includes degrees in architecture from San Diego State University and Palm Beach College.
Duane Pooley has over 36 years of experience in the construction industry as a Project Manager, Senior Estimator, and Construction Manager. He has extensive experience overseeing large construction projects in mining, power generation, and other industrial sectors. His responsibilities have included leadership, safety, quality, budgeting, scheduling, and ensuring projects meet goals. He has proven skills in management, planning, estimating, scheduling, and problem solving.
Designers Connect Presentation May 14th 2013tboyko
油
The document discusses the Ontario Building Code and the responsibilities of designers. It provides an overview of what constitutes a designer according to the Building Code Act and establishes their roles and responsibilities, including ensuring designs comply with the code. It also outlines when building permits are required, what is considered construction and a material alteration. The summary discusses legal cases that further clarify these issues and emphasize that the Building Code must be followed for all construction, even when permits are not required.
Shaun Bould has over 15 years of experience as a project engineer, electrical supervisor, and electrician working on London Underground infrastructure projects. He has extensive qualifications and training in electrical work, health and safety, and project management. Currently he is a Project Engineer at Balfour Beatty Major Projects, leading a team upgrading substations on the District Line, with responsibilities including managing costs, schedules, and safety.
The document provides an overview of a project to refurbish 200 flats at Moreton & Rufford Towers in accordance with the Ealing Decent Homes Scheme. The works included installing a new district heating system and domestic hot water system, replacing old systems. Additional works involved refurbishing plant rooms, including new boilers, pumps, and a state-of-the-art BMS system linked to the local council for remote monitoring. The contractor worked closely with the client and other trades to complete the works while minimizing disruption to tenants over the project duration from June 2010 to February 2011.
El documento describe los diferentes tipos de software. Explica que el software se refiere a los componentes l坦gicos de un sistema inform叩tico, como los programas de sistema operativo, controladores de dispositivos y aplicaciones. Luego detalla los diferentes tipos de software de sistema, aplicaciones y programaci坦n, as鱈 como las etapas del desarrollo de software y los tipos de licencias.
Un blog es un sitio web en el que uno o m叩s autores publican art鱈culos de forma cronol坦gica. Los blogs se caracterizan por publicar contenido con frecuencia, permitir comentarios de lectores para crear una comunidad, y mantener un estilo personal.
Jim Benge has overseen hundreds of industrial and commercial construction projects ranging from $7,000 to $700 million as a project manager, engineer, and construction manager. Some of the notable projects he oversaw include expansions of power plants, chemical plants, food processing facilities, and aluminum production facilities. He has extensive experience managing all aspects of complex construction projects from engineering, scheduling, installation, and start-up while minimizing disruptions to existing operations.
Terry Harvey has over 30 years of experience as a mechanical engineer and project supervisor in commercial and domestic installations. He has extensive skills in plumbing, piping, HVAC, and refrigeration systems. Some of his past roles include supervising multi-million pound mechanical system installations for Tate Modern Phase 2 expansion, British Airways' new flight training center, and various other commercial and residential projects in the UK and abroad. He is a skilled tradesman with expertise in managing teams, budgets, schedules, and ensuring work is done safely and to a high quality.
Richard J. Larrabee has over 40 years of experience in building maintenance and engineering. He has held roles such as Chief Engineer and Maintenance Superintendent for properties ranging from 50 unit apartment complexes to 800,000 square foot lab buildings. His experience includes managing HVAC, electrical, and other building systems, as well as supervising staff, implementing maintenance programs, and completing capital projects. He has extensive training in areas such as HVAC, building codes, asbestos handling, and construction.
Harshad Patel has over 33 years of experience in project management and process engineering. He has worked on a variety of projects in industries such as gas processing, petrochemicals, and specialty chemicals. Some of the key projects he led include installing hot boxes and HVAC units, replacing elevator doors, and designing pneumatic sample delivery and storage tank systems. He also created and updated plant drawings for a specialty chemical manufacturing facility.
Russell Antoniuk has over 35 years of experience as a plumber, pipefitter, and steamfitter in Alberta, Canada. He has worked on various oilsands extraction and upgrader projects, performing duties including pipe installation, equipment maintenance, and supervising crews. His skills include blueprint reading, project management, welding, and strong communication abilities. He holds certifications in confined space entry, fall protection, first aid, H2S safety, and polyethylene gas pipe joining.
Nasir Khan has over 30 years of experience in the design, construction, start-up and commissioning of fired heaters, boilers, flares and related equipment. He has worked on projects for refineries and chemical plants around the world, specializing in the design of steam methane reformers, fired heaters, boilers and NOx reduction systems. Mr. Khan holds engineering and safety certifications and is a member of several professional organizations related to mechanical engineering and the chemical industry.
The document outlines renovations completed on a 2 bedroom, 1.5 bath property located at 1333 Gum Street as part of an MDA-NRRP project. Renovations included repairs to plumbing and electrical systems, installation of flooring, lighting fixtures, appliances and closets/shelving. Before and after photos show the interior and exterior of the property both before and after the repairs were made to prepare the unit for Section #8 inspection and rental.
This document describes several construction projects managed by the author. It includes:
1) A $1.5M project at a Burlington Coat Factory facility to expand their conveyor system and add a mezzanine structure, requiring reinforcement of the building.
2) Renovations the author managed for various clients including a $7.5M renovation of an existing warehouse and a $9.3M expansion and renovation of a warehouse for Chewy.com.
3) Additional projects the author managed including parking expansions, new construction of warehouses, office renovations, and building restorations.
Timothy M. Swain has over 28 years of experience in all phases of construction, including project management, supervision, carpentry, and construction consulting. He has worked on both commercial and residential projects ranging from $750,000 to $5,000,000, including custom homes, apartments, pools, and public school renovations. His experience includes managing budgets, schedules, subcontractors, and all phases of construction from design to completion. He is skilled in areas such as seismic upgrades, infrastructure installation, and design-build projects.
This document provides information on building services systems for a domestic building, including the electrical supply system, water supply system, sewerage and sanitary system, and rainwater drainage system. It describes the key components of each system, relevant laws and regulations, and diagrams. The objectives of the project are to develop understanding of building services systems and apply appropriate systems to a design while meeting practical considerations. Upon completion, students will be able to identify information related to various building utility systems and propose suitable systems for specific building types.
Renovator's Presentation for Orderline Duplex Simplifed for linked-inAnthony Boyko
油
This presentation provides an overview of the process for renovating an existing single-family home to create a duplex in compliance with the building code. There are three major steps: 1) evaluating the building under Part 10 to determine if compensating construction is required, 2) if required, performing a Part 11 evaluation which involves classifying the building and determining the type and extent of renovations, and 3) identifying any reductions in performance and associated compensating construction needed. For the example home described, the renovation is considered extensive since new walls and floors are being installed, and compensating construction is needed to address the lack of fire separations between units.
Take a look at some of our recent projects. Tony Mantle
油
Axis is a family-owned property services company that has been operating for over 30 years. They provide a wide range of services including planned and reactive maintenance, refurbishments, fit-outs, and more across multiple sectors such as commercial, retail, heritage, public, education, and housing. Some of their recent clients include Lincoln's Inn, Royal Hospital Chelsea, Gray's Inn, and various public sector organizations. They have experience working on listed heritage buildings requiring specialist restoration and have worked with clients such as Credit Suisse for over 18 years.
This document discusses two cement plant projects completed by ENERGO SA:
1. A new production line and clinker storage facility including over 6,500 tons of steel structures.
2. Transportation and storage of 130,000 tons of clinker involving design and construction of a conveyor and roof for a 130,000 ton clinker silo consisting of over 3,400 steel elements.
ENERGO's success on cement industry projects is attributed to guaranteeing technical requirements and quality, just-in-time execution and delivery, and promptly addressing issues.
Ted Beery has over 20 years of experience in construction coordination, quality assurance, and safety inspection. He has worked as a construction coordinator, chief inspector, and QA/QC inspector on various civil, structural, and mechanical projects across industries. Beery has expertise in epoxy resins, construction documentation, inspections, and Microsoft Office software. He holds safety certificates from Texas and California and education includes degrees in architecture from San Diego State University and Palm Beach College.
Duane Pooley has over 36 years of experience in the construction industry as a Project Manager, Senior Estimator, and Construction Manager. He has extensive experience overseeing large construction projects in mining, power generation, and other industrial sectors. His responsibilities have included leadership, safety, quality, budgeting, scheduling, and ensuring projects meet goals. He has proven skills in management, planning, estimating, scheduling, and problem solving.
Designers Connect Presentation May 14th 2013tboyko
油
The document discusses the Ontario Building Code and the responsibilities of designers. It provides an overview of what constitutes a designer according to the Building Code Act and establishes their roles and responsibilities, including ensuring designs comply with the code. It also outlines when building permits are required, what is considered construction and a material alteration. The summary discusses legal cases that further clarify these issues and emphasize that the Building Code must be followed for all construction, even when permits are not required.
Shaun Bould has over 15 years of experience as a project engineer, electrical supervisor, and electrician working on London Underground infrastructure projects. He has extensive qualifications and training in electrical work, health and safety, and project management. Currently he is a Project Engineer at Balfour Beatty Major Projects, leading a team upgrading substations on the District Line, with responsibilities including managing costs, schedules, and safety.
The document provides an overview of a project to refurbish 200 flats at Moreton & Rufford Towers in accordance with the Ealing Decent Homes Scheme. The works included installing a new district heating system and domestic hot water system, replacing old systems. Additional works involved refurbishing plant rooms, including new boilers, pumps, and a state-of-the-art BMS system linked to the local council for remote monitoring. The contractor worked closely with the client and other trades to complete the works while minimizing disruption to tenants over the project duration from June 2010 to February 2011.
El documento describe los diferentes tipos de software. Explica que el software se refiere a los componentes l坦gicos de un sistema inform叩tico, como los programas de sistema operativo, controladores de dispositivos y aplicaciones. Luego detalla los diferentes tipos de software de sistema, aplicaciones y programaci坦n, as鱈 como las etapas del desarrollo de software y los tipos de licencias.
Un blog es un sitio web en el que uno o m叩s autores publican art鱈culos de forma cronol坦gica. Los blogs se caracterizan por publicar contenido con frecuencia, permitir comentarios de lectores para crear una comunidad, y mantener un estilo personal.
This portfolio document summarizes the experience and work of Omie Herrera-Martizon as a production designer, wardrobe stylist, and art director for TV commercials, print shoots, and events. It lists their roles and involvement in specific projects for clients like Sole Mare, Cenovis, HSBC, and PLDT. The document ends by thanking the reader.
Twitter fue fundado en 2006 por Jack Dorsey, Evan Williams y Biz Stone como un servicio de microblogging donde los usuarios comparten breves actualizaciones de texto conocidas como tweets con un l鱈mite de 140 caracteres. El nombre original era "Status" pero se cambi坦 a Twitter inspirado por la palabra "twitch" debido a las vibraciones de los tel辿fonos m坦viles, y la plataforma se utiliza para compartir informaci坦n en tiempo real sobre temas de actualidad o inter辿s personal.
The document discusses redesigning the website for Pratt SILS. It identifies strengths and areas for improvement in the current site. The proposed redesign strategy includes defining the audience, enhancing content for multiple needs, clarifying the organization structure, and making the site easier to browse. Tactical research was performed including content analysis, testing assumptions, and prototyping. The proposed blueprint includes global navigation, faculty pages allowing added content, course descriptions, and expanded alumni resources.
Ir Kew Boon Pew is a mechanical and electrical engineer who established his own consulting firm called Kew & Associates after gaining experience working for another firm. He discussed his roles and responsibilities on the Skypod Residences project, which included designing the building's M&E systems, getting approvals from authorities, and monitoring construction. Some issues during construction included improper fan duct installation and fire alarm panel replacements, which Ir Kew helped resolve by liaising with other project members. The interview provided insights into the important role of M&E engineers in construction.
This document discusses indoor environmental quality (IEQ) in office and healthcare settings. IEQ refers to the state of the air and environment inside buildings that contribute to occupant health and comfort. It is determined by factors like thermal comfort, lighting, indoor air quality, and acoustics. Poor IEQ can result from inadequate ventilation, indoor pollutants, thermal discomfort, and more. Sick building syndrome describes health issues linked to time spent in a building, like headaches, fatigue, and respiratory problems. The document recommends IEQ management plans, installing proper HVAC systems, and conducting surveys to evaluate IEQ issues. It analyzes IEQ in a university office and hospital in Malaysia through occupant surveys and recommends upgrades to address
O documento discute aspectos importantes da liturgia e do culto crist達o. Ele define liturgia como o culto p炭blico oficiado por uma igreja e discute como o culto deve ser um encontro real com Deus e n達o um espet叩culo. Tamb辿m aborda diferentes tipos de cultos e elementos essenciais como adora巽達o, confiss達o e perd達o com base no relato de Isa鱈as 6.
El documento describe los riesgos para la salud de consumir agua sin desinfectar y las enfermedades que esto puede causar. Explica que la desinfecci坦n del agua a trav辿s de m辿todos qu鱈micos y f鱈sicos es fundamental para la salud p炭blica ya que reduce la incidencia de enfermedades transmitidas por el agua como diarreas, hepatitis e infecciones. Tambi辿n se単ala que los ni単os, ancianos, embarazadas y personas enfermas son los m叩s susceptibles a contraer enfermedades por el consumo de agua contaminada.
Serafin Gonzalez Motos is a senior developer with over 15 years of experience in Java and web development. He has worked on projects for many companies across various sectors including education, retail, banking, insurance, and transportation. His experience includes roles such as team lead, project manager, functional analyst, and technical designer. He is proficient in technologies such as Java, JavaScript, SQL, UML, Scrum, and various frameworks and development tools.
This document discusses filtration theory, including definitions of filtration, objectives of filtration, types of filtration collections and fibers used. It describes filtration efficiencies of different collector types and how yarn characteristics and weaves influence efficiency. The document outlines manufacturing methods, classifications of filtration, design considerations and testing of filters. It concludes that the optimal filter fabric depends on the specific use and conditions.
This document provides a summary of a multi-phase refurbishment project of the mechanical and electrical systems at the 1-2 Broadgate property in London between 2012-2015. Key works included replacing chillers, cooling towers, pumps and generators to extend the building systems' life. The project was completed in three phases while the building remained occupied and involved meticulous planning to minimize disruptions to occupiers.
David Arkell has over 9 years of experience as a construction manager, beginning his career with Overbury and currently working with ISG. He has managed projects ranging from 贈0.5 million to 贈50 million, delivering them on time and with minimal defects. He has extensive health, safety, and environmental training. His work experience includes managing various commercial fit-out projects across London, including offices, financial institutions, and other commercial spaces. He has a proven track record of managing complex projects and meeting deadlines.
This document provides summaries of several construction projects managed by the author. They include:
1. A 25m x 18m swimming pool and health club built with a structural steel frame and glulam beam trusses.
2. Four individual factory units with offices constructed using structural steel portal frames and aluminium cladding.
3. Renovation of buildings at a racecourse including a new golf club building constructed using traditional masonry methods.
4. Several commercial projects in Dublin including a basement extension under an existing church and a passenger pier at Dublin Airport built using reinforced concrete.
This document discusses and compares different HVAC system types for buildings including cold water systems, VRF systems, and package units. It provides details on system components, installation considerations, costs, energy efficiency, and maintenance requirements. Key points covered include that cold water systems have higher costs in Israel but longer lifespans, VRF systems are less costly but need space for outdoor units, and package units require ductwork to transport air to and from indoor units. Heat pump and heat recovery systems are also discussed.
All business occupancy buildings fifteen meters or more in height in the Philippines shall be equipped with an approved, supervised sprinkler system designed to NFPA 13 standards, or an equivalent safety system. Additionally, all buildings must comply with applicable provisions of the Fire Code of the Philippines and its implementing rules and regulations.
Karl James Davis is seeking a position as a Mechanical Contracts Supervisor or Site Base Project Manager. He has over 20 years of experience in mechanical installation and supervision roles. His experience includes overseeing projects such as high-end residential developments, commercial buildings, and infrastructure projects. He is skilled in areas such as ductwork installation, design, CAD, and health and safety management.
This document provides a resume for John Rhynold, an experienced construction project superintendent. Over 25 years, he has successfully completed many residential and commercial projects on time and on budget. He has strong safety, leadership, and communication skills. Notable past projects include a long term care facility, central library, civic center, and RCMP headquarters. He is proficient in all aspects of construction including planning, regulations, trades management, documentation, and safety.
DJC Top Projects 2015 - Breathe Building Project Description - FinalChris Humphries
油
The document describes the renovation of a former general contractor's office into The Breathe Building, featuring a yoga studio, wellness center, and kitchen. Two existing buildings on the site were retrofitted and a new building was constructed. The renovation achieved high sustainability and energy efficiency standards by reusing salvaged materials, installing solar panels, and utilizing green building techniques and materials. The project faced budget and scheduling challenges due to evolving tenant requirements but was completed through collaborative efforts.
The document discusses energy efficiency upgrades that can be made to heritage buildings in Vancouver. It provides details on Vancouver's goals to reduce energy consumption in homes by 33% by 2020. It then lists 12 ways to make a house more energy efficient, such as efficient lighting, insulation, and water heating. The document also discusses the benefits of upgrading heritage buildings, which include embodied energy retention and reducing thermal bridging. It provides a case study of Vancouver's efforts through its 2020 Greenest City Action Plan to address energy usage in the city's large number of heritage buildings.
A comprehensive presentation on capital gate building which has broken the record for the furthest leaning man made structure which was held by the leaning tower of pisa
William Paul Casey is a Project Management Professional with over 40 years of experience managing construction projects in the UK and abroad. He has extensive experience leading mechanical, electrical, and building projects across various sectors. Some of his responsibilities have included developing project plans, managing budgets and schedules, overseeing subcontractors, and ensuring projects are delivered on time and on budget. He currently works as a Senior Project Manager for TCB Construction, where he directs all project activities and contract/subcontract management.
Stephen Bailey is an experienced Project Manager with a background in carpentry. He has over 20 years experience managing construction projects across London and the Southeast, including new builds, refurbishments, and fit outs. He is skilled at managing budgets, schedules, and stakeholders to deliver projects on time and on budget. He has qualifications in health and safety, construction management, and contract law. In his current role, he is managing the conversion of a historic school building into a hotel, as well as other commercial refit projects.
Please click here to view the Cranmer Court Presentation vsproul
油
This document provides information about refurbishment and renovation works taking place at Cranmer Court, including replacing the primary heating distribution network. It discusses replacing outdated plant equipment to improve efficiency, managing apartment alteration works, and overseeing internal pipework replacements. The work includes new heating plant, pipework routing, refurbishing plant rooms, and installing efficient heat interface units in apartments. It outlines the multi-phase timeline from 2017-2023 and stages of the project. Apartment owners must submit alteration applications and can hire the contractor for pipe replacement design, application assistance, tendering services, or full project management.
Roof replacement and internal remedial worksgrahamelanders
油
Mouchel undertook roof replacement and internal remedial works at a police station while it was occupied. They set up an independent work area to address security issues and planned deliveries for less busy times to minimize disruptions. Through effective planning and coordination with the client and contractor, the project was completed on time and on budget while meeting all requirements. Feedback from the client and users was extremely positive.
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1Grace Henry
油
What makes a building intelligent?
Let's go through these two examples to know those features better.
One is the world's most tallest building and the other conceived of latest automations.
Case study on Leadenhall Building KUET BECM 2k15Arafat Akash
油
Case study on one of our project in High Rise lab. This includes structural findings, HVAC, electro and mechanical room and sustainability features of this building.
1523029
1523030
1523031
This document summarizes the work of the SERVE project in Tipperary, Ireland. The SERVE project retrofitted existing homes and buildings, constructed new buildings, installed renewable energy systems, collected energy usage data, and researched socioeconomic impacts. Key results included 400 retrofits, 50 new builds, renewable energy installations, over 40 million pieces of energy data collected, and 4.1 million in grant aid secured. Energy usage decreased and biomass use increased post-retrofit. The document discusses how the SERVE project informed current national retrofit programs and energy policies in Ireland.
2. 02
PROJECT: Debenhams
Milton Keynes
Project Value 贈400k
A store with approximately 104,000sq ft of retail space spread
over three floors; lower ground, ground and first floor. The main
plant deck serving all of these areas is located on car park levels
1 & 2.
The project comprised of replacing the 9 x 140kw R22 refrigerant
heat pumps that served 9 x AHUs. The AHUs supplied the ma-
jority of the existing air conditioning and comfort cooling systems
that served the store.
We carried out all associated works such as sprinkler modification
and any necessary building works.
The contract was on a design/build basis and we were responsible
for liaising, when necessary, with the store management, statutory
parties and landlords representatives to ensure all necessary
approvals were in place to carry out the works.
All works met with the manufactures technical stipulations.
Overall cooling load to front of house sales areas is no less than
the minimum loading of 135w/m2 with the public restaurant areas
being considered in the range of 175w/m2 to 200w/m2. A full,
detailed design summary was submitted covering all areas for
consideration.
As the heat pumps, which contained the R22 refrigerant, sat on
proprietary steelwork supports on car park level 2 (in a dedicated
Debenhams plant zone) the heat pumps were craned off the
building and new support steels were installed to take the new
inverter Toshiba condenser units.
The AHUs were in relatively good condition and were overhauled
accordingly as part of the proposed scope of works.
These works comprised of:
Removing the existing 400Kg R22 DX coils and replacing
them with new R410a bespoke DX coils.
Deep cleaning and repainting of the main frame work.
Replacing belts, filters & locking nuts.
Replacing inverter drives.
Bearing kits for the fan motors/blades.
The BEMS controls were updated with local controllers being
installed within the plant room area, as well as a new Toshiba
central controller being installed with the store maintenance
office.
All power wiring was renewed/upgraded as necessary.
The AHUs were rebalanced and handed over all ahead of
schedule.
Schedule: 12 Week Project
Project completed: 8 weeks
SIMON REECE Store Manager
Having major works completed during a busy trading
period is always a concern.
Steve and the team at Protec not only controlled the
project and kept us fully informed during the regular
review meetings, and they exceed all timescales by
delivering 3 weeks early.
Post-installation communication was excellent with
Steve visiting regularly to maintain contact.
An excellent job, well done!
Thank You
3. 03
PROJECT: Debenhams
Lincoln
Project Value 贈350K
The project involved replacing the existing R22 refrigerant system
used in the majority of the air conditioning and cooling systems
which served the store.
The store is comprised of approximately 75,000 sq ft of retail
space, spread over three floors; ground, first and second, with the
main plant deck on the second floor roof level.
We were required to replace 4 x 350kw packaged AHUs and
back-of-house R22 VRF & split cassettes.
We performed the duties of principal contractor for the whole R22
replacement project, which included sprinkler modifications and
all necessary other building work. We were also responsible for
liaising, where necessary, with store management, all statutory
parties and landlords representatives to ensure all necessary
approvals to work were obtained accordingly.
There were a 4 packaged units located on the main deck second
floor roof level and these serve the retail sales floor zones. Due
to location of the AHUs, an early morning road closure of Lincoln
High Street had to be carried out. Once we had positioned
Europes largest mobile crane, it lifted the 3.5 ton AHUs weight to
a height of 65m. We also had to organise 7 articulated lorries to
be brought to the city centre to dispose of the existing units and
bring in the new equipment.
The existing units were approximately 17 years old and extreme
care had to be taken while removing the AHUs, making sure
support straps were positioned correctly, allowing the unit to be
lifted off of the existing steel support without damaging the crane
and the clients property. All work had to be exercised within a
10hr time period. The tolerances worked to whilst carrying out
these works were less than 100mm.
All relevant control circuits and electrical power wiring were
renewed/upgraded as necessary. A re-balance of our air systems
was carried out on all AHU systems.
Cleaning of duct distribution systems serving the sales floor levels
was completed out of hours.
There was a total of 15 systems located on the roof plant deck.
They all utilised either R410A or R22 refrigerant systems and
served predominantly the back-of-house arears.
Schedule: 10 Week Project
Project completed: 6 weeks
PAUL WADSWORTH
Technical Director
All the equipment was supplied by Huston (UK) Ltd. The
installation contact for all this work was awarded to Protec
Services Ltd against stiff commercial opposition.
Protec then proceeded to work closely with Huston (UK) to
ensure that all the equipment was supplied and install to the
specification, without disruption to the store, to time scale and
to the rigorous quality demanded.
The installation was carried out very professionally extremely
swiftly and to a very high standard of workmanship by
Protecs team of installation engineers, led by Paul Osborn.
The crane lift was carried out in the early hours of a Sunday
morning by one of Europes largest mobile tower cranes, the
road closure was kept to a minimum; this was down to Steve
Macdonalds meticulous logistical planning.
We look forward to working with Protec on future projects
4. PROJECT: Sutherland
Avenue (Residential)
Installation of comfort cooling into residential refurbishment.
Loveday Construction appointed Protec Services to deliver a
design and installation within their rigid time frame.
The project comprised of installing concealed ducted units into
bespoke built areas whilst ensuring operating capacities were still
achieved.
Installation of Daikin heat pumps equipment into residential
development.
15kw heat pump installed.
Ground floor
2 x concealed ducted nits into trimmed joist and supply air
discharging into front room areas.
First floor
3 x concealed units installed into changing rooms and master
bedroom.
Units installed into cupboard makeup and only discharge grilles
visible.
Second floor
2 x concealed ducted units hidden within the roof makeup
supplying top bedrooms.
All units integrated into house controls.
04
5. 05
PROJECT: Upper Belgrave
Street (Residential)
Installation and commissioning of 1 x 30 kw Unico system into
high end flat conversion.
Appointed Air conditioning and controls contractor.
Dale contracts and Ganter appointed us to supply them with a
fully integrated heating cooling and heat recovery solution to this
highly specified show flat.
By using existing American kit and European condensers a high
COP (coefficient of performance) was achieved on site.
System utilised both heat pump and hot water supplies to achieve
optimum space temperatures.
Working with an international interior design team aesthetics are of
very high importance, while still ensuring operational specifics are
attained.
PROJECT: 47 Homefield
Road (Residential)
Protec were the main contractors for this refurbishment
installation.
The residence had only recently been completed but the clients
were unhappy with the constant high temperatures on the upper
floors.
Protec were appointed to rectify this with minimal disturbance or
damage to existing decorations and ceilings.
Work was carried out to install five wall mounts in all upstairs
bedrooms and conceale all pipe and drain routes, including full
redecoration of any building works.
All necessary electrical installation certificates were issued and the
base builder was employed to check installation and guarantees.
6. Project Value: 贈150k
This project involved replacing the 2 x Toshiba 407C VRFs and 2 x
300kw R22 heat pumps which served the AHUs that supplied the
sales floor arears within Boots Oracle, Reading.
We were required to decommission the existing Toshiba VRF
system based within the 3rd floor roof plant area, decommission
and remove heat pumps that served the ground and first floor
sales floor. Install 17 new Toshiba heat pumps to AHUs.
We performed the duties of principal contractor for the whole of
the replacement project which included associated works such
as builders work in connection with the installation and all BMS
works.
We were also responsible for liaising, where necessary, with
the store management and all statutory parties, landlords
representatives to ensure all necessary approvals to work were
obtained accordingly.
Heat pumps and Coils were decommissioned and broken down
so they could be manually handed off the roof due to crane
restrictions. Bespoke DX coils were manually lifted to roof plant
room and installed.
Local controls were installed and all power wiring was renewed/
upgraded as necessary.
PROJECT: Boots
Reading
06
SPIROS K SAVVIDES BSC
Senior Associate Director
at Cudd Bentley
Having worked with Steve and his team for
many years now they have always delivered
a first class job.
7. t. 0845 8626662
e: info@protecservicesuk.com
Unit 48, Basepoint Business Centre,
Metcalf Way, Crawley, West Sussex RH11 7XX
WWW.PROTECSERVICESUK.COM