Personal Information
Organization / Workplace
Mumbai, Maharashtra India
Occupation
Senior Manager
Industry
Energy / Oil
Website
About
Being a Mechanical Graduate and having experience in Marketing, Banking & Project Development, desire the propel career & achieve respectable growth in field of Sustainable Energy (Solar). Phone no +91 9594998390
On behalf of the Generator, I perform in following area:-
i. Marketing- Getting the Prospective clients for negotiations.
ii. Commercial- Offering best possible rates to the clients as per prevailing market trend.
iii. Regulatory- Analysis of Respective State Regulatory guidelines.
iv. Financial- Analysis of Client Balance Sheet & other income statements.
M- +91 9594998390
email: ranvircboi@gmail.com
Contact Details
Tags
jay.ranvir@chemtrolssolar.com
solar energy
chemtrols solar
wind energy
maharashtra
solar power project
renewable energy
solar
wind
thermal
ranvircboi@gmail.com
solar cell
open access
solar power plant
forecasting
electricity
transformer
policy
energy
india
designing transformer
biomass
current
solar module
transmission
design
circuit breaker solar power plant
abt meter
wind power plant
jay ranvir
efficiency
mppt charger
light-induced degradation in crystalline silicon s
battery
poly
pid
solar pvs
pv field detailed losses
mono
solar panels basic types
solar system design
solar plant
lid
losses in solar systems
battery charging
electrons
solar photovoltic effect
benefits of solar
green power procurement
procedure
interest
tenure
security
public sector
loan
solar project grid connected
ireda solar-pv-loan-scheme
design solar plant
generation prediction
iam losses
pv syst
tutiorals
mppt maximum power point tracking
charge controller
cost and expected lifespan of solar panels
amorphous solar panels
polycrystalline solar panels
potential
difference of ct & pt
financial modelling fundamentals
jharkhand
jharkhand solar-power-policy-2015
current measurement
solar project
safety
ct
current transfomer
power
busbar
pvs
structure
panel
inverter
designing
bus bar
capative
ril
tdl
monocrystalline solar panels
ongrid solar system
offgrid system
module design
battery design
olar photovoltaic system design
energy concession
textile policy maharashtra
module
photovoltaic systems overview
open access charges chhattisgarh
open access financial modelling feasibility
soalr
tata power
procedure for-distribution-open-access
windows
procedure for distribution open access
grid connectivity
power grid
open access electricity
captive power plants
detailed comparison of capex vs opex solar power p
and then cooled to the oil through the condensers
finally distillate the oil gas
waste cable are heated and pyrolysis
waste slag etc.)
waste oil
waste diesel
waste oil(waste crude oil
waste plastics
waste recycling machine defines an environmental e
plastics to oil report
detail information of 5 t pyrolysis plant
model ppa for renewable energy sources
rpo
verification of compliance of renewable purchase o
short term open access status for march 17
bti solar-compass-q1-05-06-2018-executive-summary
the indian-sunshine-the-solar-energy-landscape-in-
the-indian-sunshine-the-solar-energy-landscape-in-
scheduling and imbalance handling for solar wind e
opex/ boot/ lease solar power plant
ppa model presentation
applicable charges for group captive open access u
lease
target group solar plant
financing modes
draft jserc (rooftop solar pv grid interactive sys
open access mp
temperature and pressure to bond the thread to the
profile on the production of retreaded tyres the e
2016: pp. 61-65 doi: 10.5958/2322-0465.2016.00007.
beads and punctures in a single stage. a tyre can
here becomes the choice either to replace the tyre
it is very essential to know the meaning of ‘tread
production capacity is calculated on single shift
the precured tread rubber already has a tread patt
retreading of damaged tyre is done by conventional
wind renewable 2018-19
open access charges rajasthan solar
open access charges rajasthan
the cumulative capacity to be allowed at a particu
to the wires licensee. such payment will be taken
as approved by the commission for a particular fin
energy accounting and settlement with the consumer
connectivity for ‘change-over’ consumers practice
ppa agreement draft
through the sldc
the deviation charge for the excess or shortfall s
differs from the scheduled generation
as the case may be
if the actual injected generation of a stand-alone
solar or wind energy generator who deviates from i
transformer basics for solar power plants
solar projects
state wise solar rec registered projects
solar rooftop opportunities and challenges
specification grid tie_spv_plant
requirements/documeuts required for synchronisatio
andstoa for generator connected to transmission co
scheduling and im balance handling for renew able
wind power
sldc
group captive generation
electricity rules 2005 related to captive generati
delhi transco
guidelines/procedure for implementation of short t
losses
delhi transco limited
details of cross subsidy surcharge calulated for f
electrical
open access contact list
pv solar plant components
rate contract
gujarat energy development agency 125 mw
diesel to solar
gujarat electricity regulatory commission amendmen
photon
encapsulation of cell
operates and maintains the project
owns
resco constructs
sbi rooftop program
sldc punjab jay.ranvir@chemtrolssolar.com
wind project
inverter selection solar power project
inverter selection
what is availability tariff
on a contracted basis.
stands for a rational tariff structure for power s
particularly in the indian context
availability tariff availability tariff
2015 and issues pertaining to connection of roof t
order 163 of 2017-12062018 petition of cleanmax en
odisha solar-power-policy
2016 order 131 of 2018-12062018
its compliance and implementation of rec framework
under section 19 of merc (rpo
petition of msedcl for seeking approval for deviat
pune with the facility of net metering.
khadki (afk)
2015 for the implementation of 3 mw of grid connec
order 160 of 2017-15062018 petition of bharat elec
petition for seeking approval on adaption of tarif
order 129 of 2018-14062018
msedcl
See more