ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Chamath Wijeratne
Work History
Dec 2011 – Present Project Manager, Projects – High Density, Ausgrid
• Responsible for delivering network assets (>$10M) through project planning,
risk analysis, proposal, civil and electrical design, civil and electrical
construction, testing, commissioning and closeout stages.
• Managed the following projects:
o Rebuilding Canterbury 132kV/33kV 194MVA sub-transmission
substation ($45M brownfield) to replace equipment, which was
reaching end of serviceable life and mitigate safety issues.
§ Relocating capacitor banks, ripple filters, underground services
§ Constructing new control and switch room
§ Replacing 132kV and 33kV outdoor yards with indoor gas
insulated switchgear
§ 132kV (x4), 33kV (x19), 11kV and 415V feeder/circuit
augmentations
o Installation of 132kV Ring Main Circuit Breakers at Marrickville
132kV/11kV 72MVA zone substation ($18.6M brownfield) to
minimize the risk of outages due to transformer faults (improved
operation and reliability) of the associated transmission feeders.
§ Developed project proposal and execution plan
§ Demolishing existing amenities
§ Constructing new control and switch room
§ Installing 132kV GIS units
§ 132kV feeder (x4) connections
§ Green-field brownfield secondary systems integration
o Installation of 132kV Ring Main Circuit Breakers at St.Peters
132kV/11kV 87MVA zone substation ($22.5M brownfield) to
minimize the risk of outages due to transformer faults (improved
operation and reliability) of the associated transmission feeders.
§ Provided project management, construction and commissioning
advice for the.
§ Developed project proposal and execution plan
§ Demolishing existing structures, buildings
§ Relocating underground and overhead services
§ Constructing new control and switch rooms
§ Installing 132kV gas insulated switchgear
§ Installing 11kV/415V auxiliary substations
§ Augmenting 11kV and 415V services
o Replacing switchgear at Dulwich Hill 11kV 62MVA zone substation,
which is approaching end of serviceable life ($25.5M brownfield).
§ Underground service relocation
§ Construction of new switchroom
§ Equipment installation
§ Feeder transfers
o Replacing Hurstville North 132kV/11kV 66.7MVA zone substation
($31.1M greenfield) to supply forecast demand increases in the area.
§ Defect rectification of electrical installation
§ Commissioning all primary and secondary equipment
§ 132kV feeder augmentations
§ Decommissioning old substation
o Kogarah 91H VT height platform to eliminate height safety risks to
operating staff.
o Canterbury No.3 Tx gantry replacement and refurbishment to eliminate
risks from gantry failure to personnel, equipment and network load.
Communication
• Developed and implemented communications plans for each project phase.
• Communicated to all relevant stakeholders complex work sequences required
to commission brownfield assets via presentations, one-on-one information
sessions, phone conversations, staging diagrams, commissioning plans and
network access plans.
• Ensured each workgroup understood expectations - questioned and regularly
sought feedback from key workgroup members.
• Communicated changes to complex commissioning programs via weekly
meetings, commissioning plans, network access plans, staging diagrams,
network switching/earthing/lock-out instructions, group discussions and one-
on-one dialogs.
Human Resources
• Managed the changing requirements of key stakeholders, internal service
providers, internal subject matter experts, internal clients, external consultants,
external regulatory authorities (e.g. city councils etc.) and community
members.
• Managed competing demands from key stakeholders.
• Resolved conflicts between staff, contractors, alliance partners and other
stakeholders.
• Managed up to four direct reports - project engineers, graduate engineers and
project construction superintendents.
• Identified and facilitated areas of development/improvement for engineers.
• Completed six-monthly or annual performance reviews for graduate engineers.
• Monitored the performance of Project Construction Superintendents.
• Identified knowledge gaps for Project Construction Superintendents.
• Provided training and mentoring to reduce knowledge and skill gaps.
Procurement
• Managed the procurement of equipment and services throughout the life cycle
of the project.
• Managed the evaluation and approval of variations and extensions of time.
• Reviewed procurement plans and tender documents.
• Evaluated tenders for civil construction work packages.
Risk
• Identified, controlled, monitored and managed project risks throughout the
project life cycle.
• Monthly review and update of risk registers.
• Facilitated and lead risk and opportunity workshops.
Change Management
• Managed changes to scope, schedule, network requirements and quality
standards throughout the life of the project.
• Practiced agile change management and minimized impacts from latent
conditions, organizational restructures, changes in network standards and
changes to client needs.
Cost Management
• Reviewed detailed project estimates and controlled project costs throughout
the project life cycle.
• Used Visual Basic for Applications, to automate the process of mapping cost
center expenditures (exported via SAP and Microsoft Access) to project cost
breakdown structures (Microsoft Excel) and performed earned value analysis
and forecast costs to complete.
• Facilitated value management workshops that delivered over $1M in cost
reductions for the Marrickville and St.Peters 132kV ring main circuit breaker
projects.
Quality
• Ensured key-deliverables at each project phase was completed to the required
quality.
• Ensured the Inspection, Test and Quality Plans were completed at the time of
energisation.
Safety and Environment
• Identified, controlled, monitored and managed Work Health and Safety risks
over the construction and commissioning phases.
• Developed situation-specific Safe Work Method Statements.
• Developed integrated Safety Management System to manage Work Health and
Safety of local and remote work sites and implemented this system via Site
Specific and Project Specific Safety Management Plans.
• Updated Safety Management Systems to comply with legislation as new codes
of practice etc. were released.
• Completed at least two work site inspections and safety interactions each
month for all active project sites.
Integration
• Developed project proposals for the Marrickville, St.Peters, Dulwich Hill and
Kogarah height platform projects.
• Provided monthly updates of key project performance indicators (schedule,
percentage complete, actuals vs. forecast cost to complete, safety and
environmental incidents etc.) to the board of directors.
• Facilitated Value Management workshops to deliver value outcomes for
clients and stakeholders.
Engineering and Technical skills
• Maintained detailed project schedules using the Primavera P6.
• Using Visual Basic for Applications, automated the process of mapping cost
center expenditures (exported via SAP and Microsoft Access) to project cost
breakdown structures (Microsoft Excel) and performed earned value analysis
and forecast costs to complete.
• Developed complex commissioning plans to construct, test and commission
brownfield network equipment.
• Wrote network element isolation, earthing and lockout instructions for the
Sydney Control room to facilitate the construction, testing and commissioning
activities.
• Assessed and balanced project needs (delays, cost increases etc.) with risk
exposure to personnel, equipment and customers (minimizing risk to network
loads).
• Trained project engineers to write network isolation work instructions.
• Managed the logistics and sequence of modifying/commissioning network
assets such as feeders, transformers, switchboards, ring-main-isolators, circuit
breakers, reactors, overhead transmission spans etc.
• Developed multi-variable optimization algorithms to sequence brownfield
132kV and 33kV feeder transfers.

More Related Content

What's hot (20)

rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
Richard Callueng
Ìý
Heather McCall Resume
Heather McCall ResumeHeather McCall Resume
Heather McCall Resume
Heather McCall
Ìý
ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2
Zafar Bokhari
Ìý
David McDonald CV 20-04-2016
David McDonald CV 20-04-2016David McDonald CV 20-04-2016
David McDonald CV 20-04-2016
David McDonald
Ìý
Jeff Ross Resume
Jeff Ross ResumeJeff Ross Resume
Jeff Ross Resume
Jeffrey Ross
Ìý
LuceyResume0515
LuceyResume0515LuceyResume0515
LuceyResume0515
Dan Lucey
Ìý
Pre bid meeting presentation
Pre bid meeting presentationPre bid meeting presentation
Pre bid meeting presentation
Riaz Zalil
Ìý
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
kumlachew ketsela mengistu
Ìý
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd Resume
Nathan Mudd
Ìý
MOHANNAD CV
MOHANNAD  CVMOHANNAD  CV
MOHANNAD CV
Mohanad Elhout
Ìý
Resume william bickford
Resume william bickford Resume william bickford
Resume william bickford
William Bickford
Ìý
William Kelvin ParkerZ to A
William Kelvin ParkerZ to A William Kelvin ParkerZ to A
William Kelvin ParkerZ to A
Kelvin Parker
Ìý
Rishabh Resume
Rishabh ResumeRishabh Resume
Rishabh Resume
Rishabh Jain
Ìý
resume for Mngr position 4-13-16
resume for Mngr position 4-13-16resume for Mngr position 4-13-16
resume for Mngr position 4-13-16
Kenneth Meyers
Ìý
Manoj Subhash Patil AD H
Manoj Subhash Patil AD HManoj Subhash Patil AD H
Manoj Subhash Patil AD H
manoj patil
Ìý
RFI_RodnyBrown 2015
RFI_RodnyBrown 2015RFI_RodnyBrown 2015
RFI_RodnyBrown 2015
Rodney Brown
Ìý
Tabrez
TabrezTabrez
Tabrez
Tabrez Alam
Ìý
Khalil Awwad
Khalil AwwadKhalil Awwad
Khalil Awwad
Khalil Awwad
Ìý
Carlos A. Gonzalez CV English
Carlos A. Gonzalez CV English Carlos A. Gonzalez CV English
Carlos A. Gonzalez CV English
Carlos A Gonzalez
Ìý
Resume-Chandra Mouli
Resume-Chandra MouliResume-Chandra Mouli
Resume-Chandra Mouli
CHANDRA MOULI
Ìý
Heather McCall Resume
Heather McCall ResumeHeather McCall Resume
Heather McCall Resume
Heather McCall
Ìý
ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2
Zafar Bokhari
Ìý
David McDonald CV 20-04-2016
David McDonald CV 20-04-2016David McDonald CV 20-04-2016
David McDonald CV 20-04-2016
David McDonald
Ìý
Jeff Ross Resume
Jeff Ross ResumeJeff Ross Resume
Jeff Ross Resume
Jeffrey Ross
Ìý
LuceyResume0515
LuceyResume0515LuceyResume0515
LuceyResume0515
Dan Lucey
Ìý
Pre bid meeting presentation
Pre bid meeting presentationPre bid meeting presentation
Pre bid meeting presentation
Riaz Zalil
Ìý
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd Resume
Nathan Mudd
Ìý
Resume william bickford
Resume william bickford Resume william bickford
Resume william bickford
William Bickford
Ìý
William Kelvin ParkerZ to A
William Kelvin ParkerZ to A William Kelvin ParkerZ to A
William Kelvin ParkerZ to A
Kelvin Parker
Ìý
Rishabh Resume
Rishabh ResumeRishabh Resume
Rishabh Resume
Rishabh Jain
Ìý
resume for Mngr position 4-13-16
resume for Mngr position 4-13-16resume for Mngr position 4-13-16
resume for Mngr position 4-13-16
Kenneth Meyers
Ìý
Manoj Subhash Patil AD H
Manoj Subhash Patil AD HManoj Subhash Patil AD H
Manoj Subhash Patil AD H
manoj patil
Ìý
RFI_RodnyBrown 2015
RFI_RodnyBrown 2015RFI_RodnyBrown 2015
RFI_RodnyBrown 2015
Rodney Brown
Ìý
Khalil Awwad
Khalil AwwadKhalil Awwad
Khalil Awwad
Khalil Awwad
Ìý
Carlos A. Gonzalez CV English
Carlos A. Gonzalez CV English Carlos A. Gonzalez CV English
Carlos A. Gonzalez CV English
Carlos A Gonzalez
Ìý
Resume-Chandra Mouli
Resume-Chandra MouliResume-Chandra Mouli
Resume-Chandra Mouli
CHANDRA MOULI
Ìý

Similar to 20150121 Ausgrid PM work experience and skills (20)

MGoutho_Res_0816
MGoutho_Res_0816MGoutho_Res_0816
MGoutho_Res_0816
Marc Gouthro
Ìý
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
Samuel Michel
Ìý
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016
Tahir Khan
Ìý
Bill resume
Bill resumeBill resume
Bill resume
Awili Bill
Ìý
Callahan_Allen_Resume
Callahan_Allen_ResumeCallahan_Allen_Resume
Callahan_Allen_Resume
Al Callahan
Ìý
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
Sher Chuhan
Ìý
Naveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Curriculum vitae Project manager
Naveen Curriculum vitae Project manager
Naveen Rengasamy
Ìý
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
md saif ali khan
Ìý
Christopher Kinnon Resume
Christopher Kinnon ResumeChristopher Kinnon Resume
Christopher Kinnon Resume
CHRISTOPHER J. KINNON
Ìý
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
Hussein Ahmad Salem
Ìý
MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015
MATHAVAN SELVADURAI MATHAVAN
Ìý
Venkatesh narasimhan
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
Venkatesh N
Ìý
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
mathavan2008
Ìý
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
Greg Clifford
Ìý
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
Mohammad Asif haneef
Ìý
Resume 2016 - Product Scheduler
Resume 2016 - Product SchedulerResume 2016 - Product Scheduler
Resume 2016 - Product Scheduler
Tim Chau
Ìý
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
Ulysses Bustillo
Ìý
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
Peter Bright
Ìý
M_Wilmot Resume_7
M_Wilmot Resume_7M_Wilmot Resume_7
M_Wilmot Resume_7
Marshall Wilmot
Ìý
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
weshumba
Ìý
MGoutho_Res_0816
MGoutho_Res_0816MGoutho_Res_0816
MGoutho_Res_0816
Marc Gouthro
Ìý
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
Samuel Michel
Ìý
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016
Tahir Khan
Ìý
Bill resume
Bill resumeBill resume
Bill resume
Awili Bill
Ìý
Callahan_Allen_Resume
Callahan_Allen_ResumeCallahan_Allen_Resume
Callahan_Allen_Resume
Al Callahan
Ìý
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
Sher Chuhan
Ìý
Naveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Curriculum vitae Project manager
Naveen Curriculum vitae Project manager
Naveen Rengasamy
Ìý
Venkatesh narasimhan
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
Venkatesh N
Ìý
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
mathavan2008
Ìý
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
Greg Clifford
Ìý
Resume 2016 - Product Scheduler
Resume 2016 - Product SchedulerResume 2016 - Product Scheduler
Resume 2016 - Product Scheduler
Tim Chau
Ìý
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
Peter Bright
Ìý
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
weshumba
Ìý

20150121 Ausgrid PM work experience and skills

  • 1. Chamath Wijeratne Work History Dec 2011 – Present Project Manager, Projects – High Density, Ausgrid • Responsible for delivering network assets (>$10M) through project planning, risk analysis, proposal, civil and electrical design, civil and electrical construction, testing, commissioning and closeout stages. • Managed the following projects: o Rebuilding Canterbury 132kV/33kV 194MVA sub-transmission substation ($45M brownfield) to replace equipment, which was reaching end of serviceable life and mitigate safety issues. § Relocating capacitor banks, ripple filters, underground services § Constructing new control and switch room § Replacing 132kV and 33kV outdoor yards with indoor gas insulated switchgear § 132kV (x4), 33kV (x19), 11kV and 415V feeder/circuit augmentations o Installation of 132kV Ring Main Circuit Breakers at Marrickville 132kV/11kV 72MVA zone substation ($18.6M brownfield) to minimize the risk of outages due to transformer faults (improved operation and reliability) of the associated transmission feeders. § Developed project proposal and execution plan § Demolishing existing amenities § Constructing new control and switch room § Installing 132kV GIS units § 132kV feeder (x4) connections § Green-field brownfield secondary systems integration o Installation of 132kV Ring Main Circuit Breakers at St.Peters 132kV/11kV 87MVA zone substation ($22.5M brownfield) to minimize the risk of outages due to transformer faults (improved operation and reliability) of the associated transmission feeders. § Provided project management, construction and commissioning advice for the. § Developed project proposal and execution plan § Demolishing existing structures, buildings § Relocating underground and overhead services § Constructing new control and switch rooms § Installing 132kV gas insulated switchgear § Installing 11kV/415V auxiliary substations § Augmenting 11kV and 415V services o Replacing switchgear at Dulwich Hill 11kV 62MVA zone substation, which is approaching end of serviceable life ($25.5M brownfield). § Underground service relocation § Construction of new switchroom § Equipment installation § Feeder transfers o Replacing Hurstville North 132kV/11kV 66.7MVA zone substation ($31.1M greenfield) to supply forecast demand increases in the area. § Defect rectification of electrical installation
  • 2. § Commissioning all primary and secondary equipment § 132kV feeder augmentations § Decommissioning old substation o Kogarah 91H VT height platform to eliminate height safety risks to operating staff. o Canterbury No.3 Tx gantry replacement and refurbishment to eliminate risks from gantry failure to personnel, equipment and network load. Communication • Developed and implemented communications plans for each project phase. • Communicated to all relevant stakeholders complex work sequences required to commission brownfield assets via presentations, one-on-one information sessions, phone conversations, staging diagrams, commissioning plans and network access plans. • Ensured each workgroup understood expectations - questioned and regularly sought feedback from key workgroup members. • Communicated changes to complex commissioning programs via weekly meetings, commissioning plans, network access plans, staging diagrams, network switching/earthing/lock-out instructions, group discussions and one- on-one dialogs. Human Resources • Managed the changing requirements of key stakeholders, internal service providers, internal subject matter experts, internal clients, external consultants, external regulatory authorities (e.g. city councils etc.) and community members. • Managed competing demands from key stakeholders. • Resolved conflicts between staff, contractors, alliance partners and other stakeholders. • Managed up to four direct reports - project engineers, graduate engineers and project construction superintendents. • Identified and facilitated areas of development/improvement for engineers. • Completed six-monthly or annual performance reviews for graduate engineers. • Monitored the performance of Project Construction Superintendents. • Identified knowledge gaps for Project Construction Superintendents. • Provided training and mentoring to reduce knowledge and skill gaps. Procurement • Managed the procurement of equipment and services throughout the life cycle of the project. • Managed the evaluation and approval of variations and extensions of time. • Reviewed procurement plans and tender documents. • Evaluated tenders for civil construction work packages. Risk • Identified, controlled, monitored and managed project risks throughout the project life cycle. • Monthly review and update of risk registers. • Facilitated and lead risk and opportunity workshops.
  • 3. Change Management • Managed changes to scope, schedule, network requirements and quality standards throughout the life of the project. • Practiced agile change management and minimized impacts from latent conditions, organizational restructures, changes in network standards and changes to client needs. Cost Management • Reviewed detailed project estimates and controlled project costs throughout the project life cycle. • Used Visual Basic for Applications, to automate the process of mapping cost center expenditures (exported via SAP and Microsoft Access) to project cost breakdown structures (Microsoft Excel) and performed earned value analysis and forecast costs to complete. • Facilitated value management workshops that delivered over $1M in cost reductions for the Marrickville and St.Peters 132kV ring main circuit breaker projects. Quality • Ensured key-deliverables at each project phase was completed to the required quality. • Ensured the Inspection, Test and Quality Plans were completed at the time of energisation. Safety and Environment • Identified, controlled, monitored and managed Work Health and Safety risks over the construction and commissioning phases. • Developed situation-specific Safe Work Method Statements. • Developed integrated Safety Management System to manage Work Health and Safety of local and remote work sites and implemented this system via Site Specific and Project Specific Safety Management Plans. • Updated Safety Management Systems to comply with legislation as new codes of practice etc. were released. • Completed at least two work site inspections and safety interactions each month for all active project sites. Integration • Developed project proposals for the Marrickville, St.Peters, Dulwich Hill and Kogarah height platform projects. • Provided monthly updates of key project performance indicators (schedule, percentage complete, actuals vs. forecast cost to complete, safety and environmental incidents etc.) to the board of directors. • Facilitated Value Management workshops to deliver value outcomes for clients and stakeholders. Engineering and Technical skills • Maintained detailed project schedules using the Primavera P6.
  • 4. • Using Visual Basic for Applications, automated the process of mapping cost center expenditures (exported via SAP and Microsoft Access) to project cost breakdown structures (Microsoft Excel) and performed earned value analysis and forecast costs to complete. • Developed complex commissioning plans to construct, test and commission brownfield network equipment. • Wrote network element isolation, earthing and lockout instructions for the Sydney Control room to facilitate the construction, testing and commissioning activities. • Assessed and balanced project needs (delays, cost increases etc.) with risk exposure to personnel, equipment and customers (minimizing risk to network loads). • Trained project engineers to write network isolation work instructions. • Managed the logistics and sequence of modifying/commissioning network assets such as feeders, transformers, switchboards, ring-main-isolators, circuit breakers, reactors, overhead transmission spans etc. • Developed multi-variable optimization algorithms to sequence brownfield 132kV and 33kV feeder transfers.