ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
AVTAR SINGH
Mobile: +91 9318858455/ + 919418551182/+ 918988050087
E-Mail:avtarsingh13021983@gmail.com
Seeking senior level assignments in Maintenance, Operations & Project Management with an
Organization of repute. (Preferred Industry - Metro Railway, Power Sector or Switchgear Company, Real Estate
(Preferred Location: Delhi/NCR, and Himachal Pradesh, Punjab, anywhere in North India)
SYNOPSIS
 An astute professional with over 9 years two month of experience in Maintence, Project Management and
Erection & Commissioning. Currently associated with M/S KURMI HYDRO ENERGIES PVT. LTD (8MW),
Hydro Division of Chandigarh Distillers & bottlers Ltd., Chd, PUNJAB as Astt. MANAGER (O&M).
 Adept at handling erection & commissioning activities involving resource planning, in-process inspection, team
Building and co-ordination with internal / external departments
 Adroit at implementing cost saving measures to achieve substantial reduction in terms of raw materials,
manpower and machine utilization. Skilled in enhancing systems to bring greater cost efficiency levels & energy/
power reductions and on-time delivery
 Familiar with Hydro Turbine and all other Electrical & Mechanical Equipments use at Hydro Power Plant.
 Associated with operation team as a crew member of 70MW Budhil Hydro Electric Project, Himachal Pradesh.
KNOWLEDGE FORTE
Plant Operations & Maintenance
Quality Control
Project/People Management
Installation & Commissioning
Shift Operations
Achieving the production target and maintaining all safety precautions / procedures as SOP and acting as In-
charge of all activities of the plant as well as maintenance and quality control during the shift hours. Controlling
the activities during plant emergencies, start-up and shutdown with the assistance of Panel and Field Operators.
Process Engineering & Improvement
Identifying areas of improvement and recommending process modifications and equipment calibrations to enhance
Operational efficiencies of machine / equipment.
Ensuring complete in-process quality control, handling routine maintenance, calibration and troubleshooting for
analytical equipment on a regular basis for higher productivity / efficiency.
CAREER PREVIEW
SINCE JUNE 2014 KURMI HYDRO ENERGIES PVT. LTD. ASTT. MANAGER (O&M)
MAR’08 TO JUNE 2014 Lanco Infratech Ltd., Chamba (H.P.) SR. Engineer (O & M)
JUN’07 to 08 Ship Switchgear Pvt. Ltd (Punjab) Engineer (Quality control)
ATTAINMENTS
Successfully handled the following:
o Monitoring projects with respect to cost, resource deployment, time over-runs, quality compliance
and manpower planning to ensure timely execution of projects.
o Planning and effecting predictive & preventive maintenance schedules for various equipment /
lines to increase machine up time & equipment reliability.
o Implementing maintenance schedules and carrying out periodic checks to ensure performance of
various equipment and maintaining requisite documents for the same.
o Evaluating & negotiating with vendors for price & various other terms & conditions.
o Establishing and executing standard maintenance schedule to aim at Zero Break-Down time in
process control.
o Identifying areas of bottlenecks in maintenance procedures and initiate process changes for
qualitative improvement.
o Installation and commissioning of the heavy equipment conducting tests & inspections to ensure
operational effectiveness of plant & utilities.
o Monitoring the installation of various plants and equipment during project commissioning.
o As an In-charge of Electro-Mechanical team, successfully handle all maintenance work of Hydro
Power Plant since last one year.
PROFESSIONAL TRAINING UNDERGONE
Training Name: 66KV SUBSTATION
Organization Name: PUNJAB STATE ELECTRICITY BOARD DASUYA (PUNJAB)
Training Name: 3 PHASE MOTORS
Organization Name: KALSI METALS PVT. LTD JALANDHAR (PUNJAB)
Training Name: SWITCHGEAR TESTING
Organization Name: SHIP SWITCHGEAR PVT. LTD (PUNJAB)
EDUCATION
2007 DEGREE IN ELECTRICAL ENGINEERING FROM PUNJAB TECHNICAL UNIVERSITY (70%)
2002 +2(PCM) FROM PSEB (55%)
1999 10th
FROM PSEB (62%)
Others
AUTOCAD 2007 FROM CENTRAL TOOL ROOM LUDHIANA( INDO- GERMAN )
2000
IT FORTE
Conversant with MS Office, Windows and Internet Application.
PERSONAL SNIPPETS
Date of Birth: 13th
FEBRUARY 1983
Address: H.No. 2377, V&P.O. BEGOWAL TEHSIL BHOLATH DISTT. KAPURTHALA (PUNJAB)
Linguistic Abilities: English, Hindi, Punjabi
ANNEXURE
Projects Undertaken
1. Project Name: TESTING OF SWITCHGEAR
Company Name: Ship Switchgear Pvt. Ltd.
Accountabilities: working as Testing and Quality control engineer (Electrical), Quality control of MCBS,
Switches, ELCB, RCCB, and Isolator. Supply of items to Govt. Department as per
DGS&D, Prepare daily production chart, Maintain records as per ISI & ISO-9001,
Handle ISI inspection, Testing of Switchgear (MCB, RCCB) as per ISI, MCB, tripping
characteristics, Glow wire test, 28 days test, Temperature rise, Handle Central power
research institute Bhopal testing of Double break switches (63A, 100A, 200A, 400A)
rating, Electrical and Mechanical endurance, Temperature rise test for both double
break and MCB series.
2. Project name: Drinidhar Hydroelectric project – 5MW (SHIUNTA – H.P.)
COMPANY NAME: VAMSHI INDUSTRIAL POWER LTD
Accountabilities: Earth mat for 33kv switchyard and interconnection as per drawing
Erection and commission of hydroelectric project along with its transmission line.
Erection of power house as per drawing. Erection of outdoor switchyard along with its
Equipments like CT, PT, Vacuum circuit breaker, sf6 circuit breaker, Isolator, lightning
Arrestors, control and relay panels etc.Erection of Power Transformer (7.5MVA) and
Auxiliary Transformer (100 KVA) , DG set (100 KVA).Erection and Commission of
13KM 33KV/11KV transmission line along with switchyard. Erection and commission
Of 33KV interconnection works including RS JOIST.
3. Project Name: IKU-II Hydroelectric Project - 5MW (Tang – H.P.)
Company Name: Vamshi hydro energies power pvt. Ltd.
Accountabilities: Assisting of testing commission, supervisory of erection and commission activities
Operation & maintence of 5MW HEP Iku-II, Preparation of DGR data, Preparation of
Monthly maintains & annual maintains reports, maintain tripping records, inspection
Of all electro-mechanical equipment, Installation of earthing system which includes
Earth mat, riser, earth electrodes, Erection, installion and commission works of control
System which includes, Generator transformer protection panel, Generator relay
Metring and protection panel, synchronizing panel, turbine governor system and oil
Pressure system, MIV control system, LAVT panel, NGT, Float cum boost charger
(FCBC) with battery bank.
4. Project Name: Banner –III Hydroelectric Project – 5MW ( Dharamshala- H.P)
Company Name: Vamshi hydro- Energies power Pvt. Limited
Accountabilities: Erection and commission of hydroelectric project along with its transmission line.
Erection of power house as per drawing. Erection of outdoor switchyard along with its
Equipments like CT, PT, Vacuum circuit breaker, sf6 circuit breaker, Isolator, lightning
Arrestors, control and relay panels etc.Erection of Power Transformer (7.5MVA) and
Auxiliary Transformer (100 KVA) , DG set (100 KVA).Erection and Commission of
13KM 33KV/11KV transmission line along with switchyard. Erection and commission
Of 33KV interconnection works
5. Project Name: Upper khauli Hydroelectric Project - 5MW (Shahpur – H.P.)
Company Name: Vamshi Industial power Ltd.
Accountabilities:
Operation of 5MW hydro-electric project, Outdoor switchyard and Balance of Plant with optimum
efficiency, Normal operation, Emergency Handling and safe shutdown of Units, Line up of the units and its
auxiliaries, Changeover of equipments, Routine testing of Protection System and annunciation system, Issue
and cancellation of PTW (Permit to work) system, Monitor plant operations and handle emergencies including
shutdown of units and load throw- off to control generation as per requirement. Emergency Equipment trial
and restoration of process and equipment. Familiar with Indian Electricity ACT and Rule.
6. Project Name: Budhil Hydroelectric Project-2x35MW, (Chamba-HP)
Company Name: Lanco Infratech Ltd.
Accountabilities: Operation of 70MW hydro-electric project, 220KV Gas insulated switchyard and
Balance of Plant with optimum efficiency, Normal operation, Emergency Handling and
safe shutdown of Units, Line up of the units and its auxiliaries, Changeover of
equipments, Routine testing of Protection System and annunciation system, Issue and
cancellation of PTW( Permit to work ) system, Safe Isolation, Personnel Safety and
Equipment Safety ,Monitor plant operations and handle emergencies including
shutdown of units and load throw- off to control generation as per requirement.
Emergency Equipment trial and restoration of process and equipment. Familiar with
Indian Electricity ACT and Rule. I have associated as a team leader of Operation and
maintenance team.
7. Project name: Kurmi Hydro energies Pvt. Ltd – 8MW (RAMPUR – H.P.)
COMPANY NAME: KURMI HYDRO ENERGIES PVT LTD.
Accountabilities: Errection and commission of francis turbines along with its generator. Project Manager of
3* 2.67MW HEP, Operation and maintance of Horizontal Francis turbines and Generator, Power
Transformer(12MVA),Dealing with Govt Deptt, Dealing With HPSEB for JMR, Manage allaspects of an operating
portfolio of utility scale residential and commercial assets,both Financial and Technical. Manage,Direct and
Schedule day to day and long range activities for assigned properties and ensure that all programs and procedures
of the O&M staff are being properly implemented.
-Actively moniter performance, weather and security data from operating plants.
-Maintain a formalized database tracking physical characteristics of the asset,contracts,contractual obligations
and system performance.
-Experience of working for operation and maintenance of medium voltage switchgear and circuit breakers,
protective relay systems, inverts and high voltage transformers.
-Ensure performance of repair activities including task planning, parts ordering and repair execution.
-Manage warranty claims issues with equipment vendors along with investigating quality problems reported in the
field. To ensure strict adherence to corporate values in complying with all regulatory requirements including
environmental, safety and other relevant laws and regulations.
-To manage the Hydro plant based on best practices being followed hydro industry with an emphasis on
planning/scheduling preventive maintenance.
DATE 12/7/2016
Place: Rampur (HP) (AVTAR SINGH)

More Related Content

What's hot (20)

Nirav Sangani CV
Nirav Sangani CVNirav Sangani CV
Nirav Sangani CV
Nirav Sangani
Ìý
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
deepakkoottappalli1985
Ìý
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
Rama Nand Yadav
Ìý
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
SANJAY SHARAN
Ìý
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
vasanth morais
Ìý
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
BISWAJYOTI SWAIN
Ìý
CV Agha Shuaib August 16
CV Agha Shuaib August 16CV Agha Shuaib August 16
CV Agha Shuaib August 16
Agha Muhammad Shuaib
Ìý
MAC_Resume171214
MAC_Resume171214 MAC_Resume171214
MAC_Resume171214
Manish Chourasia
Ìý
Madan 0816
Madan 0816Madan 0816
Madan 0816
Madan Gupta
Ìý
Resume_Kailash Kumar Jain
Resume_Kailash Kumar JainResume_Kailash Kumar Jain
Resume_Kailash Kumar Jain
Kailash Jain
Ìý
CV PMF - L1
CV PMF - L1CV PMF - L1
CV PMF - L1
Atul Modi
Ìý
May 19, 2015 Resume
May 19, 2015 ResumeMay 19, 2015 Resume
May 19, 2015 Resume
Daniel Norris
Ìý
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
Malikjan Nadaf
Ìý
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
Ranjith koyili
Ìý
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Justin Mathew
Ìý
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
Satish Pydimarla
Ìý
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
Ahmed Khalil
Ìý
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
Pamela Bundros
Ìý
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Upendra Kumar Yadav
Ìý
Kaustubh_CV 2015
Kaustubh_CV 2015Kaustubh_CV 2015
Kaustubh_CV 2015
Kaustubh Deshpande
Ìý
Nirav Sangani CV
Nirav Sangani CVNirav Sangani CV
Nirav Sangani CV
Nirav Sangani
Ìý
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
Rama Nand Yadav
Ìý
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
SANJAY SHARAN
Ìý
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
vasanth morais
Ìý
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
BISWAJYOTI SWAIN
Ìý
Madan 0816
Madan 0816Madan 0816
Madan 0816
Madan Gupta
Ìý
Resume_Kailash Kumar Jain
Resume_Kailash Kumar JainResume_Kailash Kumar Jain
Resume_Kailash Kumar Jain
Kailash Jain
Ìý
CV PMF - L1
CV PMF - L1CV PMF - L1
CV PMF - L1
Atul Modi
Ìý
May 19, 2015 Resume
May 19, 2015 ResumeMay 19, 2015 Resume
May 19, 2015 Resume
Daniel Norris
Ìý
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
Malikjan Nadaf
Ìý
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Justin Mathew
Ìý
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
Ahmed Khalil
Ìý
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
Pamela Bundros
Ìý
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Upendra Kumar Yadav
Ìý

Viewers also liked (15)

Japan: New Fears as the Tragedy Deepens
Japan: New Fears as the Tragedy DeepensJapan: New Fears as the Tragedy Deepens
Japan: New Fears as the Tragedy Deepens
Emerito Razon
Ìý
MemoriaMemoria
Memoria
Silvia García Cuevas
Ìý
Mamtha_7month_exp_Android_developer
Mamtha_7month_exp_Android_developerMamtha_7month_exp_Android_developer
Mamtha_7month_exp_Android_developer
Mamtha Gowda
Ìý
Cualidades de un emprendedorCualidades de un emprendedor
Cualidades de un emprendedor
Milton Arenas
Ìý
Experience Resume Javed
Experience Resume JavedExperience Resume Javed
Experience Resume Javed
jabed hassan
Ìý
Frases buscando la felicidadFrases buscando la felicidad
Frases buscando la felicidad
Juan David Camacho Flores
Ìý
Insatal·lacions i activitats esportives
Insatal·lacions i activitats esportivesInsatal·lacions i activitats esportives
Insatal·lacions i activitats esportives
marferos
Ìý
Intelligent Cybersecurity for the Real World
Intelligent Cybersecurity for the Real WorldIntelligent Cybersecurity for the Real World
Intelligent Cybersecurity for the Real World
NetCraftsmen
Ìý
International Teen Femdom by Bossy Girls
International Teen Femdom by Bossy GirlsInternational Teen Femdom by Bossy Girls
International Teen Femdom by Bossy Girls
femdominacija
Ìý
The Irrationality of Measuring Brand Performance: Using Fame, Feeling & Fluen...
The Irrationality of Measuring Brand Performance: Using Fame, Feeling & Fluen...The Irrationality of Measuring Brand Performance: Using Fame, Feeling & Fluen...
The Irrationality of Measuring Brand Performance: Using Fame, Feeling & Fluen...
System1 Group
Ìý
T hipoglicemia neonatal.pptmartes oo.pptfinalT hipoglicemia neonatal.pptmartes oo.pptfinal
T hipoglicemia neonatal.pptmartes oo.pptfinal
Valentina Martínez
Ìý
Essays And Grammar
Essays And GrammarEssays And Grammar
Essays And Grammar
guest61dc4ad
Ìý
Identive | Press Release | Identive Introduces TouchSecure® OpenAccess Wall M...
Identive | Press Release | Identive Introduces TouchSecure® OpenAccess Wall M...Identive | Press Release | Identive Introduces TouchSecure® OpenAccess Wall M...
Identive | Press Release | Identive Introduces TouchSecure® OpenAccess Wall M...
Identive
Ìý
Japan: New Fears as the Tragedy Deepens
Japan: New Fears as the Tragedy DeepensJapan: New Fears as the Tragedy Deepens
Japan: New Fears as the Tragedy Deepens
Emerito Razon
Ìý
Mamtha_7month_exp_Android_developer
Mamtha_7month_exp_Android_developerMamtha_7month_exp_Android_developer
Mamtha_7month_exp_Android_developer
Mamtha Gowda
Ìý
Cualidades de un emprendedorCualidades de un emprendedor
Cualidades de un emprendedor
Milton Arenas
Ìý
Experience Resume Javed
Experience Resume JavedExperience Resume Javed
Experience Resume Javed
jabed hassan
Ìý
Frases buscando la felicidadFrases buscando la felicidad
Frases buscando la felicidad
Juan David Camacho Flores
Ìý
Insatal·lacions i activitats esportives
Insatal·lacions i activitats esportivesInsatal·lacions i activitats esportives
Insatal·lacions i activitats esportives
marferos
Ìý
Intelligent Cybersecurity for the Real World
Intelligent Cybersecurity for the Real WorldIntelligent Cybersecurity for the Real World
Intelligent Cybersecurity for the Real World
NetCraftsmen
Ìý
International Teen Femdom by Bossy Girls
International Teen Femdom by Bossy GirlsInternational Teen Femdom by Bossy Girls
International Teen Femdom by Bossy Girls
femdominacija
Ìý
The Irrationality of Measuring Brand Performance: Using Fame, Feeling & Fluen...
The Irrationality of Measuring Brand Performance: Using Fame, Feeling & Fluen...The Irrationality of Measuring Brand Performance: Using Fame, Feeling & Fluen...
The Irrationality of Measuring Brand Performance: Using Fame, Feeling & Fluen...
System1 Group
Ìý
T hipoglicemia neonatal.pptmartes oo.pptfinalT hipoglicemia neonatal.pptmartes oo.pptfinal
T hipoglicemia neonatal.pptmartes oo.pptfinal
Valentina Martínez
Ìý
Essays And Grammar
Essays And GrammarEssays And Grammar
Essays And Grammar
guest61dc4ad
Ìý
Identive | Press Release | Identive Introduces TouchSecure® OpenAccess Wall M...
Identive | Press Release | Identive Introduces TouchSecure® OpenAccess Wall M...Identive | Press Release | Identive Introduces TouchSecure® OpenAccess Wall M...
Identive | Press Release | Identive Introduces TouchSecure® OpenAccess Wall M...
Identive
Ìý

Similar to Avtar_singh CV 2016 (20)

Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
Ravindra Singh
Ìý
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
Ravindra Singh
Ìý
SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical Engineering
Sudip Dhar
Ìý
Yadav Manojkumar Indrapalbhai
Yadav  Manojkumar  IndrapalbhaiYadav  Manojkumar  Indrapalbhai
Yadav Manojkumar Indrapalbhai
Miyadav
Ìý
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
Chandramouli Tadepalli
Ìý
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
Sushil Podia
Ìý
Resume-Chandra Mouli
Resume-Chandra MouliResume-Chandra Mouli
Resume-Chandra Mouli
CHANDRA MOULI
Ìý
Snehal Resume
Snehal ResumeSnehal Resume
Snehal Resume
snehalkumar j Mehta
Ìý
GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.
GAURAV CHOUHAN
Ìý
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
Anirvan Chakrabarti
Ìý
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
ARUN KOUSHIK SRINIVASAN
Ìý
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
Suresh Selvaraju
Ìý
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
kami88
Ìý
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
Chandramouli Tadepalli
Ìý
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
Chandramouli Tadepalli
Ìý
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
Mohammad Naushad
Ìý
A.Resume
A.ResumeA.Resume
A.Resume
Amit Kumar
Ìý
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
Bharjendu vimal
Ìý
resume 04092015
resume 04092015resume 04092015
resume 04092015
Chiranjib Bera
Ìý
Cv tapan kumar prusty updated
Cv tapan kumar prusty updatedCv tapan kumar prusty updated
Cv tapan kumar prusty updated
Tapan kumar prusty
Ìý
SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical Engineering
Sudip Dhar
Ìý
Yadav Manojkumar Indrapalbhai
Yadav  Manojkumar  IndrapalbhaiYadav  Manojkumar  Indrapalbhai
Yadav Manojkumar Indrapalbhai
Miyadav
Ìý
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
Sushil Podia
Ìý
Resume-Chandra Mouli
Resume-Chandra MouliResume-Chandra Mouli
Resume-Chandra Mouli
CHANDRA MOULI
Ìý
GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.
GAURAV CHOUHAN
Ìý
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
Suresh Selvaraju
Ìý
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
kami88
Ìý
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
Mohammad Naushad
Ìý
A.Resume
A.ResumeA.Resume
A.Resume
Amit Kumar
Ìý
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
Bharjendu vimal
Ìý
Cv tapan kumar prusty updated
Cv tapan kumar prusty updatedCv tapan kumar prusty updated
Cv tapan kumar prusty updated
Tapan kumar prusty
Ìý

Avtar_singh CV 2016

  • 1. AVTAR SINGH Mobile: +91 9318858455/ + 919418551182/+ 918988050087 E-Mail:avtarsingh13021983@gmail.com Seeking senior level assignments in Maintenance, Operations & Project Management with an Organization of repute. (Preferred Industry - Metro Railway, Power Sector or Switchgear Company, Real Estate (Preferred Location: Delhi/NCR, and Himachal Pradesh, Punjab, anywhere in North India) SYNOPSIS  An astute professional with over 9 years two month of experience in Maintence, Project Management and Erection & Commissioning. Currently associated with M/S KURMI HYDRO ENERGIES PVT. LTD (8MW), Hydro Division of Chandigarh Distillers & bottlers Ltd., Chd, PUNJAB as Astt. MANAGER (O&M).  Adept at handling erection & commissioning activities involving resource planning, in-process inspection, team Building and co-ordination with internal / external departments  Adroit at implementing cost saving measures to achieve substantial reduction in terms of raw materials, manpower and machine utilization. Skilled in enhancing systems to bring greater cost efficiency levels & energy/ power reductions and on-time delivery  Familiar with Hydro Turbine and all other Electrical & Mechanical Equipments use at Hydro Power Plant.  Associated with operation team as a crew member of 70MW Budhil Hydro Electric Project, Himachal Pradesh. KNOWLEDGE FORTE Plant Operations & Maintenance Quality Control Project/People Management Installation & Commissioning Shift Operations Achieving the production target and maintaining all safety precautions / procedures as SOP and acting as In- charge of all activities of the plant as well as maintenance and quality control during the shift hours. Controlling the activities during plant emergencies, start-up and shutdown with the assistance of Panel and Field Operators. Process Engineering & Improvement Identifying areas of improvement and recommending process modifications and equipment calibrations to enhance Operational efficiencies of machine / equipment. Ensuring complete in-process quality control, handling routine maintenance, calibration and troubleshooting for analytical equipment on a regular basis for higher productivity / efficiency. CAREER PREVIEW SINCE JUNE 2014 KURMI HYDRO ENERGIES PVT. LTD. ASTT. MANAGER (O&M) MAR’08 TO JUNE 2014 Lanco Infratech Ltd., Chamba (H.P.) SR. Engineer (O & M) JUN’07 to 08 Ship Switchgear Pvt. Ltd (Punjab) Engineer (Quality control) ATTAINMENTS Successfully handled the following: o Monitoring projects with respect to cost, resource deployment, time over-runs, quality compliance and manpower planning to ensure timely execution of projects. o Planning and effecting predictive & preventive maintenance schedules for various equipment / lines to increase machine up time & equipment reliability.
  • 2. o Implementing maintenance schedules and carrying out periodic checks to ensure performance of various equipment and maintaining requisite documents for the same. o Evaluating & negotiating with vendors for price & various other terms & conditions. o Establishing and executing standard maintenance schedule to aim at Zero Break-Down time in process control. o Identifying areas of bottlenecks in maintenance procedures and initiate process changes for qualitative improvement. o Installation and commissioning of the heavy equipment conducting tests & inspections to ensure operational effectiveness of plant & utilities. o Monitoring the installation of various plants and equipment during project commissioning. o As an In-charge of Electro-Mechanical team, successfully handle all maintenance work of Hydro Power Plant since last one year. PROFESSIONAL TRAINING UNDERGONE Training Name: 66KV SUBSTATION Organization Name: PUNJAB STATE ELECTRICITY BOARD DASUYA (PUNJAB) Training Name: 3 PHASE MOTORS Organization Name: KALSI METALS PVT. LTD JALANDHAR (PUNJAB) Training Name: SWITCHGEAR TESTING Organization Name: SHIP SWITCHGEAR PVT. LTD (PUNJAB) EDUCATION 2007 DEGREE IN ELECTRICAL ENGINEERING FROM PUNJAB TECHNICAL UNIVERSITY (70%) 2002 +2(PCM) FROM PSEB (55%) 1999 10th FROM PSEB (62%) Others AUTOCAD 2007 FROM CENTRAL TOOL ROOM LUDHIANA( INDO- GERMAN ) 2000 IT FORTE Conversant with MS Office, Windows and Internet Application. PERSONAL SNIPPETS Date of Birth: 13th FEBRUARY 1983 Address: H.No. 2377, V&P.O. BEGOWAL TEHSIL BHOLATH DISTT. KAPURTHALA (PUNJAB) Linguistic Abilities: English, Hindi, Punjabi ANNEXURE Projects Undertaken 1. Project Name: TESTING OF SWITCHGEAR Company Name: Ship Switchgear Pvt. Ltd. Accountabilities: working as Testing and Quality control engineer (Electrical), Quality control of MCBS, Switches, ELCB, RCCB, and Isolator. Supply of items to Govt. Department as per DGS&D, Prepare daily production chart, Maintain records as per ISI & ISO-9001, Handle ISI inspection, Testing of Switchgear (MCB, RCCB) as per ISI, MCB, tripping characteristics, Glow wire test, 28 days test, Temperature rise, Handle Central power research institute Bhopal testing of Double break switches (63A, 100A, 200A, 400A) rating, Electrical and Mechanical endurance, Temperature rise test for both double break and MCB series.
  • 3. 2. Project name: Drinidhar Hydroelectric project – 5MW (SHIUNTA – H.P.) COMPANY NAME: VAMSHI INDUSTRIAL POWER LTD Accountabilities: Earth mat for 33kv switchyard and interconnection as per drawing Erection and commission of hydroelectric project along with its transmission line. Erection of power house as per drawing. Erection of outdoor switchyard along with its Equipments like CT, PT, Vacuum circuit breaker, sf6 circuit breaker, Isolator, lightning Arrestors, control and relay panels etc.Erection of Power Transformer (7.5MVA) and Auxiliary Transformer (100 KVA) , DG set (100 KVA).Erection and Commission of 13KM 33KV/11KV transmission line along with switchyard. Erection and commission Of 33KV interconnection works including RS JOIST. 3. Project Name: IKU-II Hydroelectric Project - 5MW (Tang – H.P.) Company Name: Vamshi hydro energies power pvt. Ltd. Accountabilities: Assisting of testing commission, supervisory of erection and commission activities Operation & maintence of 5MW HEP Iku-II, Preparation of DGR data, Preparation of Monthly maintains & annual maintains reports, maintain tripping records, inspection Of all electro-mechanical equipment, Installation of earthing system which includes Earth mat, riser, earth electrodes, Erection, installion and commission works of control System which includes, Generator transformer protection panel, Generator relay Metring and protection panel, synchronizing panel, turbine governor system and oil Pressure system, MIV control system, LAVT panel, NGT, Float cum boost charger (FCBC) with battery bank. 4. Project Name: Banner –III Hydroelectric Project – 5MW ( Dharamshala- H.P) Company Name: Vamshi hydro- Energies power Pvt. Limited Accountabilities: Erection and commission of hydroelectric project along with its transmission line. Erection of power house as per drawing. Erection of outdoor switchyard along with its Equipments like CT, PT, Vacuum circuit breaker, sf6 circuit breaker, Isolator, lightning Arrestors, control and relay panels etc.Erection of Power Transformer (7.5MVA) and Auxiliary Transformer (100 KVA) , DG set (100 KVA).Erection and Commission of 13KM 33KV/11KV transmission line along with switchyard. Erection and commission Of 33KV interconnection works 5. Project Name: Upper khauli Hydroelectric Project - 5MW (Shahpur – H.P.) Company Name: Vamshi Industial power Ltd. Accountabilities: Operation of 5MW hydro-electric project, Outdoor switchyard and Balance of Plant with optimum efficiency, Normal operation, Emergency Handling and safe shutdown of Units, Line up of the units and its auxiliaries, Changeover of equipments, Routine testing of Protection System and annunciation system, Issue and cancellation of PTW (Permit to work) system, Monitor plant operations and handle emergencies including shutdown of units and load throw- off to control generation as per requirement. Emergency Equipment trial and restoration of process and equipment. Familiar with Indian Electricity ACT and Rule.
  • 4. 6. Project Name: Budhil Hydroelectric Project-2x35MW, (Chamba-HP) Company Name: Lanco Infratech Ltd. Accountabilities: Operation of 70MW hydro-electric project, 220KV Gas insulated switchyard and Balance of Plant with optimum efficiency, Normal operation, Emergency Handling and safe shutdown of Units, Line up of the units and its auxiliaries, Changeover of equipments, Routine testing of Protection System and annunciation system, Issue and cancellation of PTW( Permit to work ) system, Safe Isolation, Personnel Safety and Equipment Safety ,Monitor plant operations and handle emergencies including shutdown of units and load throw- off to control generation as per requirement. Emergency Equipment trial and restoration of process and equipment. Familiar with Indian Electricity ACT and Rule. I have associated as a team leader of Operation and maintenance team. 7. Project name: Kurmi Hydro energies Pvt. Ltd – 8MW (RAMPUR – H.P.) COMPANY NAME: KURMI HYDRO ENERGIES PVT LTD. Accountabilities: Errection and commission of francis turbines along with its generator. Project Manager of 3* 2.67MW HEP, Operation and maintance of Horizontal Francis turbines and Generator, Power Transformer(12MVA),Dealing with Govt Deptt, Dealing With HPSEB for JMR, Manage allaspects of an operating portfolio of utility scale residential and commercial assets,both Financial and Technical. Manage,Direct and Schedule day to day and long range activities for assigned properties and ensure that all programs and procedures of the O&M staff are being properly implemented. -Actively moniter performance, weather and security data from operating plants. -Maintain a formalized database tracking physical characteristics of the asset,contracts,contractual obligations and system performance. -Experience of working for operation and maintenance of medium voltage switchgear and circuit breakers, protective relay systems, inverts and high voltage transformers. -Ensure performance of repair activities including task planning, parts ordering and repair execution. -Manage warranty claims issues with equipment vendors along with investigating quality problems reported in the field. To ensure strict adherence to corporate values in complying with all regulatory requirements including environmental, safety and other relevant laws and regulations. -To manage the Hydro plant based on best practices being followed hydro industry with an emphasis on planning/scheduling preventive maintenance. DATE 12/7/2016 Place: Rampur (HP) (AVTAR SINGH)