際際滷

際際滷Share a Scribd company logo
RESUME
SANKAR VAIDHYNATHAN
Contact Information
Bldg No: 2637 Road : 567
Block No: 905
Alshargi  East Riffa
Bahrain.
E-Mail: vsankar24@gmail.com
Mobile Phone: +973-36350528
Personal Information
Birthdate: 24.02.1976
Marital Status: Married
Language Proficiency English, Hindi, Tamil
Career Summary
Over 17 years of experience in maintenance, testing, commissioning, troubleshoot and of
various electrical and fire Alarm system in industrial, petrochemicals, oil & gas and power
and water plant projects.
Work Experience
AL-EZZEL Operation & Maintenance Company,
Al Dur Independent Power And Water Plant (Bahrain)
Jan-2016-Till Date
Designation : Electrical Technician
 Responsible for daily routine maintenance activities of 1245MW (GE Make)
Gas/Oil fired generator.
 Preparing daily work permits on SAP, updating maintenance protocols on
system.
 Co-ordination with other department for any major troubleshoots activities.
 Coordination for sub-vendor activities in plant.
 Updating daily activates and submitting the progress activities reports on weekly
and monthly basis.
 Attending breakdown calls received from control room
Major Task handled.
 Online Generator carbon brush checking/ replacement.
 GCB (Generator Circuit Breaker) online trouble shoot of minor alarms
(Temperature High, AC/DC Failure, Gas pressure Low).
 Emergency DC motor fails to start (Checking Battery supply voltage/ any DC
auxiliary contact fail to pick-up).
 Battery charger / UPS on line PM / any minor alarm troubleshoot.
 Troubleshoot of GE Multilink protection relay (F60,M60 & T60).
 ECMS (Electrical Control Monitoring System) Either net switch replacement.
 Troubleshoot of Motor starters (Relay, contactor, timer replacement).
 11KV SWGR troubleshoot Earth switch Open/Close issues, Breaker
mechanism / Limit switch faults.
HYUNDAI HEAVY INDUSTRIES Co LTD (EPC),
Az-Zour North Phase1 Independent water and power project (Kuwait)
Dec2014 Dec2015
Project : Az-Zour 1450MW (GE Make) Gas/Oil fired combine cycle power plant.
Designation : Electrical Engineer
 Responsible for GTG & STG Electrical Equipment installation.
 Co-ordination with GE TA for day to day activates planning.
 DC/UPS Systems (Batteries, Battery charger & UPS panel) installation and pre-
commissioning activities
 Over view subcontractors daily activities and coordinating with engineering
department to resolve major issues.
 Updating daily activates and submitting the progress activities reports on weekly and
monthly basis.
 To take corrective action as need during renovation systems and/or consulted with
construction project manager to resolve issues.
 To provide technical support and activities plan to field engineers, work timing and
planning, time frame to complete the work.
 Involved in Preventive maintained activities, monthly Generator & HT motor megger.
 Co-ordination with procurement department for material arrangement and updating
material site arrival for logistic.
 Involved in Generator Terminal enclosure protection CTs testing,
 Site co-ordination for vendor supervisor for site activities.
 LCI / Excitation Transformers & Unit installation and pre-commission checks done and
hand over to GE for final commissioning.
 DC motor starter installation and pre-commission checks done.
 GCB installation and co-ordination with vendor for commissioning activities.
 IPB (Isolation Phase Bus-duct) installation and co-ordination with vendor for
commissioning activities.
 Collector house brush gear rings installation / alignment checking & carbon brush
installation.
 Temporary test equipment arrangements for vendor for final commissioning activates.
HYUNDAI HEAVY INDUSTRIES Co LTD (EPC),
Al Dur Independent water and power project (Bahrain)
Sep2009  Aug2014
Project : Aldur IWPP 1245MW (GE Make) Gas/Oil fired combine cycle power and
Desalination plant (EPC Contract)
Designation : Electrical Engineer
Job Responsibilities:
Construction & Commissioning period
(Electrical Activities)
 Responsible for installation of Low & High voltage electrical equipments.
 Involved in Installation and testing of 3MVA & 2MVA Hyundai make
transformers & Bus duct.
 Working with GE TA and involved in GPP (Generator protection panel) loop
checking and relay (protection) testing.
 Involved in testing of LV & MV switchgears panels and MCC.
 Involved in ECMS (Electrical control and monitoring system) installation and
commissioning activites.
 MV Cable Hipot test, LV cable meggering and line checks.
 DC/UPS Systems (Batteries, Battery charger & UPS panel) installation and pre-
commissioning activities.
 Work and Co-ordinate with vendor for ACB /VCB breaker, testing and
commissioning activities.
FireAlarmSystem
 Responsible for installation testing commissioning of Fire alarm system.
 Fire Alarm (TYCO make fire water systems & Notifier (Honeywell make) CO2 &
FM200 system) trouble shutting, Testing & Commissioning.
 Fully assigned for troubleshoot and testing.
AlDurWarrantymaintenance&troubleshootactivities.
 FullyassignedforElectrical&Firealarmsystemtroubleshoot/modificationjobs.
 Involvedinplantwinteroutageformajorreplacementandtroubleshootworks.
 GeneratorterminalenclosureprotectionCTreplacement.
 Metalicmakestationtransformrer,Dismantlingandreinstallation.
 GCB(Generatorcircuitbreaker)contactor&timerreplacement.
 EmergencyDCstartercontrolcontactor&latchblockmodification.
 GPP(Generatorprotectionpanel)sideT60relayCPUreplacement.
 BSDG(Blackstartdieselgenerator)AVRreplacement.
 SUT(StepupTR)Firealarmdelugesystemtroubleshootandrectification.
 ECMScommunicationfailure&HUBswitchreplacement.
 DC/UPSsystemcapacitorreplacement.
 SUTneutralbushreplacement.
Other Major Responsibilities
 To take corrective action as need during renovation systems and/or consulted with
construction project manager to resolve issues.
 Over view subcontractors daily activities and coordinating with engineering
department to resolve major issues.
 Updating daily activates and submitting the progress activities reports on weekly
and monthly basis.
 To coordinate with material team and QC on status of materials received at site.
 Preparing Monthly MIS report on manpower utilized, material purchased, and
work progress.
Achievement Award
 I was be awarded by HHI for my best performance in this project still beginning.
 Warranty team best performance award.
HBL POWER SYSTEMS PVT LTD, New Delhi
Designation : Sr. Engineer (Sales & Service)
May 2004  Oct 2009
Responsible for Installation, testing, Commissioning & maintenance of Lead Acid Batteries,
SMPS based Power plants for Various telecom customer for DELHI/NCR and Haryana circle.
And also involved in handling special types of batteries like Nickel Cadmium, DG batteries and
solar application batteries and power plant.
 Responsible for Infra planning for Telecom BTS / RSUs on behalf of HBL power systems.
 To ensure high Customer Satisfaction level in the assigned area and build up strong
relationship
 To collect information on future development/ improvement plans and maintaining
customer and vendor databases.
 Monthly MIS updating & sending Analysis reports to HO.
 Preparing field analysis summary report and submitting to quality control team.
 Job allocation and manpower planning.
 To resolve customer complaints within the stipulated time and improve customer
satisfaction.
 Collecting performance reports & Customer feedbacks for monthly auditing.
 Preparing AMC offers & attending negotiation meetings.
 Responsible for providing Technical Support to O&M team of Reliance Energy Limited,
BSES Delhi, on Installation & Commissioning and Operation.
 Involved in AMC activities, for telecom and meter rail customers
 Preparing manpower planning, shutdown activates, material required, isolation point
checking before shutdown, giving pre intimation to the customer.
 To provide technical support and activities plan to field engineers, work timing and
planning, time frame to complete the work.
Achievements:
 Enhanced customer satisfaction by providing excellent services.
 Provided continuous feedback to the company towards cost reduction and development of
the Products. .
JOY THOMAS ENGINEERING PVT LTD, MUMBAI
Designation : Project Engineer
Feb 2001  April 2004
Projects Handled :
(i) LPG project for Reliance Industries Ltd, Patalganga
 Deputed to LPG project of Reliance Industries Ltd. and responsible for erection, testing &
commissioning of LT Motors, MCC`s, cable laying, VFD panels etc.,.
(ii) Reliance Infocomm Projects, Tamil Nadu
 Involved in installation of power distribution boards and AMF panels.
 HT & LT cable laying and termination.
 DG set installation and cable termination
 Smoke detectors installation.
 Installation of air conditioning systems.
 Involved in O&M for one year after completion of project activities.
(iii) Reliance Industries Ltd, Hazira  Polyester Staple Fibre Project
 Deputed to Polyester staple fibre project of Reliance Industries Ltd and responsible for
erection & commissioning of LT motors, MCC`s, VFD panels, transformers, HT & LT
cable laying etc.
ABB SYSTEM HOUSE (FLUID POWER COMPONENTS), COIMBATORE
Designation : Engineer (AC Drive)
Nov 1999  Jan 2001
Projects Handled :
(i) AC Drives Installation Project for Kaleswari Metal Board, Sivakasi, Tamilnadu
 Responsible for Erection and commissioning of AC Drives for Kirloskar compressors.
(ii) Invertor Installation Project for Western India Plywood, Kannore, Kerala
 Responsible for supervision during Installation of Invertors for pulp stream separator.
Education
Institution Kongu Polytechnic, Tamil Nadu ,India
Qualification
Diploma in Electrical & Electronics
Engineering
Year of Passing 1998
Computer Proficiency MS-Office, D-base III+
(i) AC Drives Installation Project for Kaleswari Metal Board, Sivakasi, Tamilnadu
 Responsible for Erection and commissioning of AC Drives for Kirloskar compressors.
(ii) Invertor Installation Project for Western India Plywood, Kannore, Kerala
 Responsible for supervision during Installation of Invertors for pulp stream separator.
Education
Institution Kongu Polytechnic, Tamil Nadu ,India
Qualification
Diploma in Electrical & Electronics
Engineering
Year of Passing 1998
Computer Proficiency MS-Office, D-base III+

More Related Content

What's hot (20)

Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
vineeth ravi
Resume mohan
Resume mohanResume mohan
Resume mohan
MOHANRAJ N
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
jongguanzon
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
SUKUMAR KANAKARAJ
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
ROYAPPAN JOSEPH JESU RAJA
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
Rommel Siasat
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
sagar Bharuchi
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
dilish pareed
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
Khadar Ali Shaik, P.Eng
Curriculum vitae meganathan n e-16302
Curriculum vitae  meganathan n  e-16302Curriculum vitae  meganathan n  e-16302
Curriculum vitae meganathan n e-16302
MeganathanNagaraj
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
vineeth ravi
MEP - Electrical Enginner
MEP - Electrical EnginnerMEP - Electrical Enginner
MEP - Electrical Enginner
Nikhil Garde
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
Malikjan Nadaf
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
prashant ponkshe
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
AMIT BISWAS
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUME
Anil Kumar
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
Chandramouli Tadepalli
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
armando doria
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
Mahesh Narayanan
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
Muhammad Zuhad Siddiqui
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
vineeth ravi
Resume mohan
Resume mohanResume mohan
Resume mohan
MOHANRAJ N
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
jongguanzon
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
Rommel Siasat
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
dilish pareed
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
Khadar Ali Shaik, P.Eng
Curriculum vitae meganathan n e-16302
Curriculum vitae  meganathan n  e-16302Curriculum vitae  meganathan n  e-16302
Curriculum vitae meganathan n e-16302
MeganathanNagaraj
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
vineeth ravi
MEP - Electrical Enginner
MEP - Electrical EnginnerMEP - Electrical Enginner
MEP - Electrical Enginner
Nikhil Garde
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
Malikjan Nadaf
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
AMIT BISWAS
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUME
Anil Kumar
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
armando doria
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
Mahesh Narayanan

Viewers also liked (10)

Mahmoud Bakr CV 1
Mahmoud Bakr CV 1Mahmoud Bakr CV 1
Mahmoud Bakr CV 1
masr ta3mal
InternetInternet
Internet
danna rey
Evaluation q1 g
Evaluation q1 gEvaluation q1 g
Evaluation q1 g
MarthaHay
K辰llor jainismen olle_rosenquist
K辰llor jainismen olle_rosenquistK辰llor jainismen olle_rosenquist
K辰llor jainismen olle_rosenquist
Tobias Kjellstr旦m
Jainismen Julia N
Jainismen Julia NJainismen Julia N
Jainismen Julia N
Tobias Kjellstr旦m
Matin辿e de l'arbre du 04/12/2015 : la projectionMatin辿e de l'arbre du 04/12/2015 : la projection
Matin辿e de l'arbre du 04/12/2015 : la projection
CAUE85
TeleasistenciaTeleasistencia
Teleasistencia
Jose Jimenez
617 Ann Lewis Road Charles Town WV 25414
617 Ann Lewis Road Charles Town WV 25414617 Ann Lewis Road Charles Town WV 25414
617 Ann Lewis Road Charles Town WV 25414
Heather Harley
318 Packett Drive Charles Town WV 25414
318 Packett Drive Charles Town WV 25414318 Packett Drive Charles Town WV 25414
318 Packett Drive Charles Town WV 25414
Heather Harley
Maria envej caso 8Maria envej caso 8
Maria envej caso 8
Jose Jimenez
Mahmoud Bakr CV 1
Mahmoud Bakr CV 1Mahmoud Bakr CV 1
Mahmoud Bakr CV 1
masr ta3mal
InternetInternet
Internet
danna rey
Evaluation q1 g
Evaluation q1 gEvaluation q1 g
Evaluation q1 g
MarthaHay
K辰llor jainismen olle_rosenquist
K辰llor jainismen olle_rosenquistK辰llor jainismen olle_rosenquist
K辰llor jainismen olle_rosenquist
Tobias Kjellstr旦m
Matin辿e de l'arbre du 04/12/2015 : la projectionMatin辿e de l'arbre du 04/12/2015 : la projection
Matin辿e de l'arbre du 04/12/2015 : la projection
CAUE85
TeleasistenciaTeleasistencia
Teleasistencia
Jose Jimenez
617 Ann Lewis Road Charles Town WV 25414
617 Ann Lewis Road Charles Town WV 25414617 Ann Lewis Road Charles Town WV 25414
617 Ann Lewis Road Charles Town WV 25414
Heather Harley
318 Packett Drive Charles Town WV 25414
318 Packett Drive Charles Town WV 25414318 Packett Drive Charles Town WV 25414
318 Packett Drive Charles Town WV 25414
Heather Harley
Maria envej caso 8Maria envej caso 8
Maria envej caso 8
Jose Jimenez

Similar to Sankar_ Vaid (20)

Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
Naveed Akhtar
Electrical technician
Electrical technicianElectrical technician
Electrical technician
tanweer alam
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
tanweer alam
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
Nadeem Akhtar
Suresh V Resume
Suresh V ResumeSuresh V Resume
Suresh V Resume
Suresh Veera
SRao_cv
SRao_cvSRao_cv
SRao_cv
Sanmukh Rao
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
Aman Sharma
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
Aman Sharma
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CVDGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
HIMANSHU DUBEY
Anup updated
Anup updatedAnup updated
Anup updated
Anup Patil
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016
Khadar Ali Shaik,P.Eng
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
Satish Pydimarla
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
Mubashir ahmee
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
Zaheer Ahmed
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
BISWAJYOTI SWAIN
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
barun dutta
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
Chandramouli Tadepalli
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
Chandramouli Tadepalli
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
JAMAL ASHRAF
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
Aritra Ghosh
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
Naveed Akhtar
Electrical technician
Electrical technicianElectrical technician
Electrical technician
tanweer alam
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
tanweer alam
Suresh V Resume
Suresh V ResumeSuresh V Resume
Suresh V Resume
Suresh Veera
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
Aman Sharma
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
Aman Sharma
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CVDGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
HIMANSHU DUBEY
Anup updated
Anup updatedAnup updated
Anup updated
Anup Patil
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016
Khadar Ali Shaik,P.Eng
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
Mubashir ahmee
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
Zaheer Ahmed
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
BISWAJYOTI SWAIN
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
barun dutta
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
JAMAL ASHRAF
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
Aritra Ghosh

Sankar_ Vaid

  • 1. RESUME SANKAR VAIDHYNATHAN Contact Information Bldg No: 2637 Road : 567 Block No: 905 Alshargi East Riffa Bahrain. E-Mail: vsankar24@gmail.com Mobile Phone: +973-36350528 Personal Information Birthdate: 24.02.1976 Marital Status: Married Language Proficiency English, Hindi, Tamil Career Summary Over 17 years of experience in maintenance, testing, commissioning, troubleshoot and of various electrical and fire Alarm system in industrial, petrochemicals, oil & gas and power and water plant projects. Work Experience AL-EZZEL Operation & Maintenance Company, Al Dur Independent Power And Water Plant (Bahrain) Jan-2016-Till Date Designation : Electrical Technician Responsible for daily routine maintenance activities of 1245MW (GE Make) Gas/Oil fired generator. Preparing daily work permits on SAP, updating maintenance protocols on system. Co-ordination with other department for any major troubleshoots activities. Coordination for sub-vendor activities in plant. Updating daily activates and submitting the progress activities reports on weekly and monthly basis. Attending breakdown calls received from control room Major Task handled. Online Generator carbon brush checking/ replacement. GCB (Generator Circuit Breaker) online trouble shoot of minor alarms (Temperature High, AC/DC Failure, Gas pressure Low). Emergency DC motor fails to start (Checking Battery supply voltage/ any DC auxiliary contact fail to pick-up). Battery charger / UPS on line PM / any minor alarm troubleshoot.
  • 2. Troubleshoot of GE Multilink protection relay (F60,M60 & T60). ECMS (Electrical Control Monitoring System) Either net switch replacement. Troubleshoot of Motor starters (Relay, contactor, timer replacement). 11KV SWGR troubleshoot Earth switch Open/Close issues, Breaker mechanism / Limit switch faults. HYUNDAI HEAVY INDUSTRIES Co LTD (EPC), Az-Zour North Phase1 Independent water and power project (Kuwait) Dec2014 Dec2015 Project : Az-Zour 1450MW (GE Make) Gas/Oil fired combine cycle power plant. Designation : Electrical Engineer Responsible for GTG & STG Electrical Equipment installation. Co-ordination with GE TA for day to day activates planning. DC/UPS Systems (Batteries, Battery charger & UPS panel) installation and pre- commissioning activities Over view subcontractors daily activities and coordinating with engineering department to resolve major issues. Updating daily activates and submitting the progress activities reports on weekly and monthly basis. To take corrective action as need during renovation systems and/or consulted with construction project manager to resolve issues. To provide technical support and activities plan to field engineers, work timing and planning, time frame to complete the work. Involved in Preventive maintained activities, monthly Generator & HT motor megger. Co-ordination with procurement department for material arrangement and updating material site arrival for logistic. Involved in Generator Terminal enclosure protection CTs testing, Site co-ordination for vendor supervisor for site activities. LCI / Excitation Transformers & Unit installation and pre-commission checks done and hand over to GE for final commissioning. DC motor starter installation and pre-commission checks done. GCB installation and co-ordination with vendor for commissioning activities. IPB (Isolation Phase Bus-duct) installation and co-ordination with vendor for commissioning activities. Collector house brush gear rings installation / alignment checking & carbon brush installation. Temporary test equipment arrangements for vendor for final commissioning activates.
  • 3. HYUNDAI HEAVY INDUSTRIES Co LTD (EPC), Al Dur Independent water and power project (Bahrain) Sep2009 Aug2014 Project : Aldur IWPP 1245MW (GE Make) Gas/Oil fired combine cycle power and Desalination plant (EPC Contract) Designation : Electrical Engineer Job Responsibilities: Construction & Commissioning period (Electrical Activities) Responsible for installation of Low & High voltage electrical equipments. Involved in Installation and testing of 3MVA & 2MVA Hyundai make transformers & Bus duct. Working with GE TA and involved in GPP (Generator protection panel) loop checking and relay (protection) testing. Involved in testing of LV & MV switchgears panels and MCC. Involved in ECMS (Electrical control and monitoring system) installation and commissioning activites. MV Cable Hipot test, LV cable meggering and line checks. DC/UPS Systems (Batteries, Battery charger & UPS panel) installation and pre- commissioning activities. Work and Co-ordinate with vendor for ACB /VCB breaker, testing and commissioning activities. FireAlarmSystem Responsible for installation testing commissioning of Fire alarm system. Fire Alarm (TYCO make fire water systems & Notifier (Honeywell make) CO2 & FM200 system) trouble shutting, Testing & Commissioning. Fully assigned for troubleshoot and testing. AlDurWarrantymaintenance&troubleshootactivities. FullyassignedforElectrical&Firealarmsystemtroubleshoot/modificationjobs. Involvedinplantwinteroutageformajorreplacementandtroubleshootworks. GeneratorterminalenclosureprotectionCTreplacement. Metalicmakestationtransformrer,Dismantlingandreinstallation. GCB(Generatorcircuitbreaker)contactor&timerreplacement. EmergencyDCstartercontrolcontactor&latchblockmodification. GPP(Generatorprotectionpanel)sideT60relayCPUreplacement. BSDG(Blackstartdieselgenerator)AVRreplacement.
  • 4. SUT(StepupTR)Firealarmdelugesystemtroubleshootandrectification. ECMScommunicationfailure&HUBswitchreplacement. DC/UPSsystemcapacitorreplacement. SUTneutralbushreplacement. Other Major Responsibilities To take corrective action as need during renovation systems and/or consulted with construction project manager to resolve issues. Over view subcontractors daily activities and coordinating with engineering department to resolve major issues. Updating daily activates and submitting the progress activities reports on weekly and monthly basis. To coordinate with material team and QC on status of materials received at site. Preparing Monthly MIS report on manpower utilized, material purchased, and work progress. Achievement Award I was be awarded by HHI for my best performance in this project still beginning. Warranty team best performance award. HBL POWER SYSTEMS PVT LTD, New Delhi Designation : Sr. Engineer (Sales & Service) May 2004 Oct 2009 Responsible for Installation, testing, Commissioning & maintenance of Lead Acid Batteries, SMPS based Power plants for Various telecom customer for DELHI/NCR and Haryana circle. And also involved in handling special types of batteries like Nickel Cadmium, DG batteries and solar application batteries and power plant. Responsible for Infra planning for Telecom BTS / RSUs on behalf of HBL power systems. To ensure high Customer Satisfaction level in the assigned area and build up strong relationship To collect information on future development/ improvement plans and maintaining customer and vendor databases. Monthly MIS updating & sending Analysis reports to HO. Preparing field analysis summary report and submitting to quality control team. Job allocation and manpower planning. To resolve customer complaints within the stipulated time and improve customer satisfaction. Collecting performance reports & Customer feedbacks for monthly auditing. Preparing AMC offers & attending negotiation meetings.
  • 5. Responsible for providing Technical Support to O&M team of Reliance Energy Limited, BSES Delhi, on Installation & Commissioning and Operation. Involved in AMC activities, for telecom and meter rail customers Preparing manpower planning, shutdown activates, material required, isolation point checking before shutdown, giving pre intimation to the customer. To provide technical support and activities plan to field engineers, work timing and planning, time frame to complete the work. Achievements: Enhanced customer satisfaction by providing excellent services. Provided continuous feedback to the company towards cost reduction and development of the Products. . JOY THOMAS ENGINEERING PVT LTD, MUMBAI Designation : Project Engineer Feb 2001 April 2004 Projects Handled : (i) LPG project for Reliance Industries Ltd, Patalganga Deputed to LPG project of Reliance Industries Ltd. and responsible for erection, testing & commissioning of LT Motors, MCC`s, cable laying, VFD panels etc.,. (ii) Reliance Infocomm Projects, Tamil Nadu Involved in installation of power distribution boards and AMF panels. HT & LT cable laying and termination. DG set installation and cable termination Smoke detectors installation. Installation of air conditioning systems. Involved in O&M for one year after completion of project activities. (iii) Reliance Industries Ltd, Hazira Polyester Staple Fibre Project Deputed to Polyester staple fibre project of Reliance Industries Ltd and responsible for erection & commissioning of LT motors, MCC`s, VFD panels, transformers, HT & LT cable laying etc. ABB SYSTEM HOUSE (FLUID POWER COMPONENTS), COIMBATORE Designation : Engineer (AC Drive) Nov 1999 Jan 2001 Projects Handled :
  • 6. (i) AC Drives Installation Project for Kaleswari Metal Board, Sivakasi, Tamilnadu Responsible for Erection and commissioning of AC Drives for Kirloskar compressors. (ii) Invertor Installation Project for Western India Plywood, Kannore, Kerala Responsible for supervision during Installation of Invertors for pulp stream separator. Education Institution Kongu Polytechnic, Tamil Nadu ,India Qualification Diploma in Electrical & Electronics Engineering Year of Passing 1998 Computer Proficiency MS-Office, D-base III+
  • 7. (i) AC Drives Installation Project for Kaleswari Metal Board, Sivakasi, Tamilnadu Responsible for Erection and commissioning of AC Drives for Kirloskar compressors. (ii) Invertor Installation Project for Western India Plywood, Kannore, Kerala Responsible for supervision during Installation of Invertors for pulp stream separator. Education Institution Kongu Polytechnic, Tamil Nadu ,India Qualification Diploma in Electrical & Electronics Engineering Year of Passing 1998 Computer Proficiency MS-Office, D-base III+